Provident Ecopolitan Phase 5
RG-KA-80341 · RERA PRM/KA/RERA/1251/309/PR/311224/007334 · Last updated on RERA Karnataka portal: 18 Aug 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Provident Ecopolitan Phase 5 is a Residential/Group Housing project by PROVIDENT WHITE OAKS LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/311224/007334 on 31 Dec 2024. Possession is promised by 30 Apr 2029. 571 of the 581 units on this registration are recorded sold or booked, and 2 of 17 construction stages are filed complete.
At a glance
Project
- NameProvident Ecopolitan Phase 5
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 562149
- Pincode562149
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/311224/007334
- ReraGenie IDRG-KA-80341
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on31 Dec 2024
- Promised completion30 Apr 2029
- Revised completionNone
- Buildings2 building records
- Documents filed119 files
Current status
Figures as on 18 Aug 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 351 | 0 | 351 |
| Block B | - | - | - | 230 | 0 | 230 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 18 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 17 construction stages are filed complete. The stage furthest along is Foundation footing work, at 70%.
Building: 20% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 70% |
| Upto Plinth Level | 70% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 18 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Provident White Oaks LLP | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 110.75 cr | Rs 24.02 cr |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 30.98 cr | Rs 87.53 lakh |
| On-site expenditure-Site Overhead | Rs 21.74 cr | Rs 6.94 lakh |
| Payment of taxes | Rs 19.35 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kembhavi Architecture |
| Engineer | H P Yogesh |
| Chartered Accountant | Bhuvana Bhat and Associates |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed119
As listed on the registration, under the names the promoter filed them with; the newest 80 of 119 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/311224/007334 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Ecopolitan Phase 5 Form4 RERA Dec25_compressed.pdf | 18 Aug 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Ecopolitan Architect certificate Dec25.pdf | 18 Aug 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Ecopolithan-5 Engineer Certificate Dec25.pdf | 18 Aug 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Ecopolitan Phase 5 Form4 RERA Dec25_compressed.pdf | 18 Aug 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Ecopolitan Architect certificate Dec25.pdf | 18 Aug 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Ecopolithan-5 Engineer Certificate Dec25.pdf | 18 Aug 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Ecopolitan Phase-5 RERA Form 4- Jun26_compressed.pdf | 18 Aug 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Ecopolitan -Architect Certificate Jun26.pdf | 18 Aug 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Ecopolitan Ph5 Engineering Certificate Jun26.pdf | 18 Aug 2026 |
| Area Details Phase wiseFile: Area Details Phase wise (1).pdf | 31 Dec 2024 |
| Common Area CalculationFile: Common Area Calculation SIgned.pdf | 31 Dec 2024 |
| Approved Plan sanction LetterFile: ApprovalCertificate (16).pdf | 31 Dec 2024 |
| Commencement DeclaratrionFile: Commencement Declaration.pdf | 31 Dec 2024 |
| Overall Site planFile: DWG 2_Layout_Site Plan_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Area StatementFile: DWG 2_Layout_Area Statement_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Basement PlanFile: DWG 3_Layout_Basement Sheet1_DO3_KIADB_00118_24_25_.pdf | 31 Dec 2024 |
| Basement Plan 2File: DWG 3_Layout_Basement Sheet2_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Stilt PlanFile: DWG 3_Layout_BLOCK A & B STILT_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Stilt PlanFile: DWG 4_Layout_Stilt Floor Sheet1_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Stilt PlanFile: DWG 4_Layout_Stilt Floor Sheet2_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Elevation PlanFile: DWG 5_Layout_Elevation Sheet1_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Elevation PlanFile: DWG 5_Layout_Elevation Sheet2_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Elevation PlanFile: DWG 5_Layout_Elevation Sheet3_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Elevation PlanFile: DWG 5_Layout_Elevation Sheet4_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Elevation PlanFile: DWG 5_Layout_Elevation Sheet5_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Elevation PlanFile: DWG 5_Layout_Elevation Sheet6_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Elevation PlanFile: DWG 5_Layout_Section Sheet 1_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Elevation PlanFile: DWG 6_Layout_BLOCK B_DO3_KIADB_00118_24_25_ALT.pdf | 31 Dec 2024 |
| Annual Audit SubmissionFile: Submission Confirmation Eco Phase 1.pdf | 31 Dec 2024 |
| Annual Audit SubmissionFile: Submission Confirmation Eco Phase 1a.pdf | 31 Dec 2024 |
| Annual Audit SubmissionFile: Submission Confirmation Eco phase 2.pdf | 31 Dec 2024 |
| Annual Audit SubmissionFile: Submission Confirmation Eco Phase 3.pdf | 31 Dec 2024 |
| Annual Audit SubmissionFile: Submission Confirmation Eco phase 4.pdf | 31 Dec 2024 |
| FinancialsFile: White Oaks FY 23-24 signed.pdf | 31 Dec 2024 |
| FinancialsFile: White Oaks - 2021-22.pdf | 31 Dec 2024 |
| FinancialsFile: White Oaks 22-23.pdf | 31 Dec 2024 |
| Guideline Value Self AttestedFile: Guidline Value Self Attested.pdf | 31 Dec 2024 |
| Agreement for SaleFile: ATS - ECOPOLITAN PHASE 5 Upload.pdf | 31 Dec 2024 |
| KSPCBFile: PCB_CFE_Ecopolitan.pdf | 31 Dec 2024 |
| Demarcated Master PlanFile: Copy of Master Plan.pdf | 31 Dec 2024 |
| Village Map DemarcatedFile: Villagemaps merged copy.jpg | 31 Dec 2024 |
| RTC, survey Plot No R-4-Part-A and R-4-Part-B Parts of 177 (Block No. 1,2 & 3) 72,73/1,73/2,73/3,73/4,74/1,74/ | - |
| Mutation, survey Plot No R-4-Part-A and R-4-Part-B Parts of 177 (Block No. 1,2 & 3) 72,73/1,73/2,73/3,73/4,74/ | - |
| Encumbrance Certificate, survey Plot No R-4-Part-A and R-4-Part-B Parts of 177 (Block No. 1,2 & 3) 72,73/1,73/ | - |
| Khatha, survey Plot No R-4-Part-A and R-4-Part-B Parts of 177 (Block No. 1,2 & 3) 72,73/1,73/2,73/3,73/4,74/1, | - |
| Registration CertificateFile: Certificate of Incorporation (1).pdf | - |
| GST CertificateFile: GST Certificate.pdf | - |
| Partnership DeedFile: Partnership Deed - Provident White Oaks.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form 1 -Ecopolitan Ph 5.pdf | - |
| Certificate issued by Architect Form 2File: Ecopolitan Ph 2 - Architect Certificate for Rera registration dt 26-12-2024_compressed.pdf | - |
| Certificate issued by Engineer Form 3File: Form-3 Engineer Certificate Eco Phase 5.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: No Litigation Affidavit.pdf | - |
| Balance Sheet 2023 - 2024File: White Oaks FY 23-24 Balance Sheet.pdf | - |
| Balance Sheet 2022 - 2023File: White Oaks 22-23 Balance Sheet.pdf | - |
| Balance Sheet 2021 - 2022File: White Oaks - 2021-22 Balance Sheet.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: White Oaks FY 23-24 P & L.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: White Oaks 22-23 P & L.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: White Oaks - 2021-22 P & L Account.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR 6_AY 24-25.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR AY 22-23.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: NA (1).pdf | - |
| Commencement Declaration | - |
| DWG 2_Layout_Site Plan_DO3_KIADB_00118_24_25_ALT | - |
| DWG 5_Layout_Section Sheet 1_DO3_KIADB_00118_24_25_ALT | - |
| Structural Stability Certificate | - |
| Ecopolitan - Signed Specification | - |
| NA (1) | - |
| NA (1) | - |
| ATS - ECOPOLITAN PHASE 5 | - |
| Allotment Letter - Ecopolitan Phase 5 | - |
| Form B Affidavit | - |
| Sec 3 Affidavit | - |
| NA (1) | - |
| Opinion - DSK Legal | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Provident Ecopolitan Phase 1 | Hardware Park | Ongoing | Sep 2027 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Provident Ecopolitan Phase 5 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
Soul@Godrej Ananda
Universal Metro Properties LLP
Dioro & Beryl at Brigade El Dorado
Brigade Tetrarch Private Limited
Emerald & Luminaire Block at Brigade El Dorado
Brigade Tetrarch Private Limited
Northern Lights by Puravankara KVN
KVN Property Holdings LLP
Godrej Ananda Phase 2
Universal Metro Properties LLP
TVS EMERALD ALTURA
EMERALD HAVEN PROPERTIES PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: PROVIDENT WHITE OAKS LLP
Provident White Oaks LLP has 6 registrations on RERA Karnataka, including Provident Ecopolitan Phase 1A and Provident Ecopolitan Phase 2. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Provident Ecopolitan Phase 5 is delayed beyond 30 Apr 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Provident Ecopolitan Phase 5?
The registered promoter entity is PROVIDENT WHITE OAKS LLP, a partnership firm as per the filing. Its GSTIN 29ABCFP9036A1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Provident Ecopolitan Phase 5?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Provident Ecopolitan Phase 5?
The professionals named in the filing: Architect: Kembhavi Architecture; Engineer: H P Yogesh; Chartered Accountant: Bhuvana Bhat and Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Provident Ecopolitan Phase 5?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback