Registration approved Residential/Group Housing project

Provident Capella 1

By Provident Housing Limited

RG-KA-77363 · RERA PRM/KA/RERA/1250/304/PR/190606/002596

Source: official RERA Karnataka filing

Red flags

  • 5 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Sep 2024Possession promisedmoved 9 months from the original
5Complaints at RERA Karnatakaon this registration
Jump to the 48 documents Report an error

Provident Capella 1 is a Residential/Group Housing project by Provident Housing Limited in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/190606/002596 on 6 Jun 2019. Possession is promised by 14 Sep 2024. The completion date has moved by 9 months from the original filing. 5 complaints are on record with the regulator.

At a glance

Project

  • NameProvident Capella 1
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/190606/002596
  • ReraGenie IDRG-KA-77363

Builder

  • NameProvident Housing Limited
  • Entity typeCompany
  • CINU45200KA2008PLC048273
  • Authorized SignatoryNani R Choksey
  • Other registrations11 more →
  • No longer live1 withdrawn or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJun 2019First promiseDec 2023Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Jun 2019
  • Promised completion14 Sep 2024
  • Revised completionRevised to 14 Sep 2024 (originally 14 Dec 2023)
  • Buildings3 building records
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1---88088
Tower 6---88088
Tower 7---1690169

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing workNot applicable
Retaining wall (All types)Not applicable
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,288 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 169.80 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Desk
EngineerBase Engineering Services

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2023 → Sep 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka5

Case no.ComplainantRespondentFiled
01388/2023-Provident Housing Limited11/09/2023
00932/2024-Provident Housing Limited24/09/2024
00171/2025-Provident Housing Limited23/01/2025
00214/2025-Provident Housing Limited28/01/2025
00765/2026-Provident Housing Limited29/06/2026

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/190606/002596 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: PHL_ROC_Certificate Of Incorporation[1].pdf-
RERA_Commencement Certificate-
Site Plan-
Approved Plans-
Allotment Letter-
Allotment Letter-
Sale_Deeds_RTC-
Section and Elevation-
Phase 1 Area Plan-
Allotment Letter-
Specifications-
Specifications-
RERA_EC-
3_1 Affidavit (Capella_1)-
Joint Affidavit_1-
Project Site-
JDA-566-18-19 bw-
Conversions OM-
Fire NOC-
AAI-
BESCOM-
Water-
KSPCB_Compressed-
RERA_SEIAA-
Site Plan-
Sectional_and_Specs-
Dev Plan CC-
Balance Sheet 2017 - 2018File: 2018 Bal Sheet.pdf-
Balance Sheet 2016 - 2017File: 2017 Bal Sheet.pdf-
Balance Sheet 2015 - 2016File: 2016 Bal Sheet.pdf-
Audited Profit and Loss Statement 2017 - 2018File: 2018 PandL.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 2017 PandL.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2016 PandL.pdf-
Director's Report 2017 - 2018File: 2018 (PHL) Directors Report.pdf-
Director's Report 2016 - 2017File: 2017 (PHL) Directors Report.pdf-
Director's Report 2015 - 2016File: 2016 (PHL) Directors Report.pdf-
Cash Flow Statement 2017 - 2018File: 2018 Cash Flow.pdf-
Cash Flow Statement 2016 - 2017File: 2017 Cash Flow.pdf-
Auditor's Report 2017 - 2018File: 2018 Auditor Report.pdf-
Auditor's Report 2016 - 2017File: 2017Auditors Report.pdf-
Auditor's Report 2015 - 2016File: 2016Auditors Report.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: PHL - ITR V Mar-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: PHL - ITR V Mar-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: PHL - ITR V Mar-16.pdf-
RERA_Form_B_Capella_1-
Prospectus/BrochureFile: Capella Floor Plan Brochure_15th Feb 2020.pdf-
Advertisement Copy 1File: Capella Full page ad - TOI_8th Dec.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1250_304_PR_190606_002596.xlsx-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one moved by 9 months
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep Provident Capella 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmProvident Capella 1Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: Provident Housing Limited

Provident Housing Limited has 12 registrations on RERA Karnataka, including Provident Capella 1 and Provident Capella 2. Its filings declare 6 earlier projects, 6 of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if Provident Capella 1 is delayed beyond 14 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Provident Capella 1?

The registered promoter entity is Provident Housing Limited, a company as per the filing. Its CIN U45200KA2008PLC048273 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Provident Capella 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Provident Capella 1?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Provident Capella 1?

The professionals named in the filing: Architect: Design Desk; Engineer: Base Engineering Services. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Provident Capella 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Provident Capella 1. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Provident Capella 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.