PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL

By YASH REALTORS & DEVELOPERS

RG-MH-81062 · RERA P51800017722 · Last updated on MahaRERA portal: 21 Sep 2025

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 33 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
18 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
34 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL is a Others project by YASH REALTORS & DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800017722 on 6 Sep 2018. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 33 months from the original filing. 24 of the 58 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NamePROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL
  • TypeOthers
  • Location
    • ROAD NO 10
    • DAULAT NAGAR BORIVALI EAST
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800017722
  • ReraGenie IDRG-MH-81062

Builder

  • NameYASH REALTORS & DEVELOPERS
  • Entity typePartnership
  • PartnerYASH PRAMODKUMAR SHAH
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1
  • Declared earlier projects3 →

Key dates

1 months past promisethis monthRegisteredSep 2018First promiseDec 2023Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Sep 2018
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed58 files

Current status

41%24 of 58 units booked

Figures as on 21 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL WING ANA181814418
PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL WING BNA6635540

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL WING A90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL WING B90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered25
Open Space6
BuildingClosed/CoveredOpen SpaceTotal
PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL WING A15621
PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL WING B10010

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area997 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on26 Jun 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2824.63
Proposed, not sanctioned2,825 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShriramTrade Center SVP Rd Chamunda Circle Borivali West Mumbai 400092 Opp Jain Temple

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD SHAH
EngineerYash shah
Chartered AccountantNehali doshi
Chartered AccountantNEHALI DHAVAL DOSHI
Chartered AccountantAKSHAYKIRTI KUMAR & ASSOCIATES LLP
PartnerRole in project
YASH REALTORS & DEVELOPERS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017608Dec 2023 → Jun 2024

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 6 MONTHS

EXT51800019900Dec 2023 → Sep 2024

Reason as filed by the promoterDue to shortage of material and labor not able to complete project please grant us extension till 30/09/2024

EXT51800024735Dec 2023 → Apr 2025

Reason as filed by the promoterDue to shortage of material and labor not able to complete project please grant us extension till 30/04/2025

EA26062501802Dec 2023 → Sep 2026

Reason as filed by the promoterWith reference to above, we would like to inform that the reason for Extension is because that the Parking installation work is ongoing and FULL OC to be obtained is in process. You are kindly requested to Grant the Extension for the above mentioned project at the earliest.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: OC DRAWING (1).pdf21 Sep 2025
Building plan approvalFile: 2430362_OC_signed.pdf21 Sep 2025
Form 1File: FORM 1 MARCH 25.pdf26 Jun 2025
Form 2File: FORM 2 MARCH 25.pdf26 Jun 2025
Form 3File: CA FORM 3 MARCH 25.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf7 Nov 2024
Certificates of CA (Form 3)File: FORM 3.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: INVENTORY.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24 (1).pdf7 Nov 2024
Declaration in FORM BFile: Form B.pdf10 Oct 2024
CERSAI detailsFile: Cersai declaration .pdf10 Oct 2024
Declaration in FORM BFile: Form B.pdf1 Jun 2024
Layout approvalFile: Drawing (1).pdf29 May 2024
Copy of Layout Approval (in case of layout)File: Drawing (1).pdf29 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 2426482_FurtherCC_signed.pdf29 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf28 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A.pdf28 May 2024
Certificates of CA (Form 3)File: form 3.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate(Prakashkunj).pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate(Prakashkunj).pdf16 May 2024
Certificates of CA (Form 3)File: Revised signed CA Certificate Prakash Kunj march24.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate(Prakashkunj).pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate(Prakashkunj).pdf16 Sep 2023
Certificates of CA (Form 3)File: Signed CA Certificate Prakash Kunj Mar'23.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate (1)_compressed.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf19 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QSC- 2021-22.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 21-22.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf19 Jan 2023
Declaration about Commencement CertificateFile: Declaration about CC-3.pdf21 Sep 2022
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf21 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf21 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf21 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf21 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QSC 2019-2020.pdf16 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QSC- 2020-21.pdf16 Sep 2022
Certificates of CA (Form 3)File: Signed CA Certificate Prakash Kunj June'22 (1).pdf16 Sep 2022
PAN CardFile: yrd company pan (2).pdf14 Jul 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCE PRAKASHKUNJ.pdf14 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Prakashkunj FurtherCC_signed.pdf3 Aug 2021
Proforma of Allotment letterFile: Sale Agreement.pdf23 Apr 2021
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf18 Aug 2018
Declaration in FORM BFile: AFFIDAVIT RERA PRAKASHKUNJ.pdf21 Jul 2018
Proforma of Allotment letterFile: Draft-Builder Sale Agr-Prakash Kunj-FInal.pdf21 Jul 2018
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf20 Jul 2018
Details of encumbrancesFile: NO ENCUMBERANCE CERTIFICATE.pdf20 Jul 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf20 Jul 2018
Building plan approvalFile: 2138100_IOD_signed.pdf19 Jul 2018
Building plan approvalFile: 1938432491NoteSheet_2485_signed.pdf19 Jul 2018
Layout approvalFile: Drawing (4).pdf19 Jul 2018
Copy of Layout Approval (in case of layout)File: Drawing (4).pdf19 Jul 2018
Building Plan Approval (IOD)File: 2138100_IOD_signed.pdf19 Jul 2018
Building Plan Approval (IOD)File: 1938432491NoteSheet_2485_signed.pdf19 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Jul 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NEW KUMKUM CHSLTHE NEW KUMKUM CHSL1CompletedDec 2015Late, Jun 2016

How this compares with Mumbai Suburban

41%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 33 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAULAT NAGAR BORIVALI EAST6,700+ in Mumbai Suburban

2 kmPROPOSED REDEVELOPMENT OCompleted 158Lapsed / revoked 90Other 223Dot size: filed unitsN

Filed coordinates, straight-line distance. 471 registered projects within 2 km.

Builder: YASH REALTORS & DEVELOPERS

YASH REALTORS & DEVELOPERS has 2 registrations on MahaRERA, including PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL and VIMALA NIVAS. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL?

The registered promoter entity is YASH REALTORS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL?

The professionals named in the filing: Architect: PRAMOD SHAH; Engineer: Yash shah; Chartered Accountant: Nehali doshi; Chartered Accountant: NEHALI DHAVAL DOSHI; Chartered Accountant: AKSHAYKIRTI KUMAR & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.