ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / PRK MIRACLE

Registered No litigation declared Residential / Group Housing project

PRK MIRACLE

By PRK Realty

RG-MH-68879 · RERA P52100055610 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 50%
38 of 110Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

PRK MIRACLE is a Residential / Group Housing project by PRK Realty in Pune, Maharashtra, registered with MahaRERA as P52100055610 on 4 Apr 2024. Possession is promised by 31 Dec 2026. 72 of the 110 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRK MIRACLE
  • TypeResidential / Group Housing
  • Location
    • Alandi
    • Alandi (M Cl)
    • Khed
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055610
  • ReraGenie IDRG-MH-68879

Builder

  • NamePRK Realty
  • Entity typePartnership
  • GSTIN27AAYFP1415C1Z8
  • PartnersTejas Prakash Kurhade, Adinath Shamsundar Rajguru

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

65%72 of 110 units booked
90.8%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRK MIRACLENA901100110

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

PRK MIRACLE: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Closed/Covered37

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024
LandownerVillageDistrict
Mr Abhishek Dnyaneshwar KurhadeAlandi (M Cl)Pune
Mrs Harshada Abhishek KurhadeAlandi (M Cl)Pune

Approvals and building plan

Sanctioning authorityAlandi Devachi
Permissible FSI5076.61
Proposed, not sanctioned5,077 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch800 Om Sai Sadan Opp Old ST Stand Alandi Pune 412105
Estimated costRs 16.00 cr
Cost incurredRs 14.53 cr
Work done90.8%
BuildingWingEstimatedIncurred
PRK MIRACLENARs 14.10 crRs 12.81 cr
-NARs 1.90 crRs 1.72 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM s Techno Arrch PRAVIN PATIL
EngineerMr Ghanshyam D Patil PATIL
EngineerMILIND Salve
Chartered AccountantM s Azam Mulani and Associates
Chartered AccountantRINKESH GUPTA AND ASSOCIATES
PartnerRole in project
PRK Realty-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 prk sign.pdf18 Apr 2026
Withdrawal Update Form 2File: form2 prk sign.pdf18 Apr 2026
Withdrawal Update Form 3File: form 3 prk sign.pdf18 Apr 2026
Withdrawal Update Form 1File: form 1.pdf19 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf19 Jan 2026
Withdrawal Update Form 3File: form 3.pdf19 Jan 2026
Withdrawal Update Form 1File: form 1 prk (1).pdf11 Oct 2025
Withdrawal Update Form 2File: Form 2 prk Q2.pdf11 Oct 2025
Withdrawal Update Form 3File: 1 Final -Form 3 -Signed.pdf11 Oct 2025
Form 5 (FY 2024-2025)File: PRK Realty Form 5 signed.pdf30 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf16 Jul 2025
Withdrawal Update Form 1File: FORM 1.pdf16 Jul 2025
Withdrawal Update Form 1File: form 1.pdf16 Jul 2025
Withdrawal Update Form 2File: form 2.pdf16 Jul 2025
Withdrawal Update Form 2File: form 2.pdf16 Jul 2025
Withdrawal Update Form 2File: form 2.pdf16 Jul 2025
Withdrawal Update Form 3File: form3.pdf16 Jul 2025
Withdrawal Update Form 3File: form3.pdf16 Jul 2025
Withdrawal Update Form 3File: form3.pdf16 Jul 2025
Form 2A (FY 2024-2025)File: form 2a.pdf19 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PRK FORM3-compressed.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH FORM 1.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Prk Form 2.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: PRK Sold Unsold Inventory 31-3-2520250403_16263833.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: STATEMENT.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: PRK MIRACLE SOLD UNSOLD INVENTORY.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PRK REAKTY.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PRK REALTY FORM 3 WITH STAMP AND SIGN-compressed.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 prk realty.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: STATEMENT.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed (2).pdf15 Jul 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (8) (1).pdf29 Mar 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (8) (1).pdf29 Mar 2024
Other - TechnicalFile: Annexure A- PRK (1).pdf29 Mar 2024
Other - TechnicalFile: Email - PMRDA.pdf18 Mar 2024
Layout approvalFile: 1 4_compressed.pdf23 Feb 2024
Building plan approvalFile: 2 4_compressed.pdf23 Feb 2024
Building plan approvalFile: 3 4_compressed.pdf23 Feb 2024
Building plan approvalFile: 4 4_compressed.pdf23 Feb 2024
PAN CardFile: PRK REALTY PAN 1.pdf23 Feb 2024
Copy of the legal title reportFile: 001 Legal Title Report 2024_compressed-1-8.pdf23 Feb 2024
Copy of the legal title reportFile: 001 Legal Title Report 2024_compressed-9-16.pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: PRK REALTY SELF DECLARATION ENCUMBRANCE.pdf23 Feb 2024
Details of encumbrances concerned to LegalFile: PRK REALTY SELF DECLARATION ENCUMBRANCE.pdf23 Feb 2024
Copy of Layout Approval (in case of layout)File: 1 4_compressed.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 4_compressed.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 3 4_compressed.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 4_compressed.pdf23 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: PRK REALTY COMMENCEMENT_compressed (1).pdf23 Feb 2024
Declaration about Commencement CertificateFile: PRK REALTY DECLARATION ABOUT COMMENCEMENT.pdf23 Feb 2024
Declaration in FORM BFile: Form B Developer.pdf23 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch form 1 TableA B.pdf23 Feb 2024
CERSAI detailsFile: Cersai- Prk.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (27).pdf23 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (7) (1).pdf23 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations (3) (1).pdf23 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations (3) (1).pdf23 Feb 2024
Proforma of Allotment letterFile: Model form of AL_compressed (1).pdf23 Feb 2024
Proforma of Agreement for saleFile: AFS- PRK.pdf23 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Bank PRK.pdf23 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation nill in allotment letter-1.pdf23 Feb 2024
Deviation Report with respect to model copy of AgreementFile: deviation draft to agreement_compressed.pdf23 Feb 2024
Other - LegalFile: Annexure A- PRK.pdf23 Feb 2024
Other - LegalFile: PRK REALTY KHAREDIKHAT compressed-2 (1).pdf23 Feb 2024

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRK MIRACLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Alandi13,700+ in Pune

2 kmPRK MIRACLECompleted 4Lapsed / revoked 5Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: PRK Realty

PRK Realty has 1 registration on MahaRERA, including PRK MIRACLE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRK MIRACLE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRK MIRACLE?

The registered promoter entity is PRK Realty, a partnership as per the filing. Its GSTIN 27AAYFP1415C1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRK MIRACLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRK MIRACLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRK MIRACLE?

The professionals named in the filing: Architect: M s Techno Arrch PRAVIN PATIL; Engineer: Mr Ghanshyam D Patil PATIL; Engineer: MILIND Salve; Chartered Accountant: M s Azam Mulani and Associates; Chartered Accountant: RINKESH GUPTA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRK MIRACLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRK MIRACLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRK MIRACLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.