Home / Browse projects / Pune, Maharashtra / PRISTINE GREENS PHASE III

Completed No litigation declared Residential / Group Housing project

PRISTINE GREENS PHASE III

By PRISTINE PROPERTIES

RG-MH-14636 · RERA P52100024045 · Last updated on MahaRERA portal: 30 Dec 2023

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
24 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 95%
2Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

PRISTINE GREENS PHASE III is a Residential / Group Housing project by PRISTINE PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100024045 on 16 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2024. 2 complaints are on record with the regulator.

At a glance

Project

  • NamePRISTINE GREENS PHASE III
  • TypeResidential / Group Housing
  • Location
    • 216 /1 P
    • 216 / 2P
    • 228 / 1P
    • 228 / 2P
    • DEHU - MOSHI ROAD
    • OPP. BHARAT PETROL PUMP
    • PUNE
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024045
  • ReraGenie IDRG-MH-14636

Builder

  • NamePRISTINE PROPERTIES
  • Entity typePartnership
  • PartnersISHWARCHAND KISHORILAL GOYAL, SACHIN ISHWARCHAND GOYAL
  • Other registrations5 more →
  • Completed5 of 6
  • Declared earlier projects4 →

Key dates

this monthRegisteredJan 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Jan 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
G WINGNA160000
H WINGNA160000
I WINGNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 95%.

G WING98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
H WING98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
I WING98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 30 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes25%
Street LightingYes50%
Community BuildingsYes75%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed203

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots203
Closed/Covered203
BuildingClosed/CoveredTotal
G WING6767
H WING6868
I WING6868

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,220 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
ANANDA BARNEPimpri Chinchawad (M Corp.)Pune
HIRAMAM BARNEPimpri Chinchawad (M Corp.)Pune
MAHADU BARNEPimpri Chinchawad (M Corp.)Pune
PANDURANG BARNEPimpri Chinchawad (M Corp.)Pune
SITARAM BARNEPimpri Chinchawad (M Corp.)Pune
SURESH SADASHIV BARNEPimpri Chinchawad (M Corp.)Pune
TUKARAM SADASHIV BARNEPimpri Chinchawad (M Corp.)Pune
NAMDEV SAHADU BARNEPimpri Chinchawad (M Corp.)Pune
SOPAN BARNEPimpri Chinchawad (M Corp.)Pune
ATISH BARNEPimpri Chinchawad (M Corp.)Pune
AKSHAY BARNEPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI16025.46
Proposed, not sanctioned16,025 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd,1194/8,Ramchandra Sabhamandap,Ghole Road,Shivaji Nagar,Pune-411005

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUNUSUAL SPACES
EngineerMILIND KULKARNI
EngineerSACHIN PATIL
Chartered AccountantR D Kabra
Chartered AccountantKAILASH AGARWAL & ASSOCIATES
PartnerRole in project
PRISTINE PROPERTIES-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12501160Kamlesh GuptaPRISTINE PROPERTIES07/04/2025
CC12501159Arth Kamlesh GuptaPRISTINE PROPERTIES07/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2023

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PRISTINE GREEN PHASE 3 AS OF 30-6-23.pdf30 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AS Pristine Greens 3 30032023-both sign_compressed.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf11 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Pristine greens phase3 Form 5.pdf9 Sep 2023
Other - LegalFile: rera letter - pristine Greens - G and H_compressed.pdf29 Aug 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: PRISTINE GREENS PHASE III SOCIETY REG CERTIFICATE.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PRISTINE GREENS PHASE III FORM 1.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf19 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPANCY CERTIFICATE GHI BUILDINGS .pdf19 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Pristine Greens III Architect Certificate Form 4 COmpletion.pdf19 Apr 2023
Layout approvalFile: Sanction Layout Plan 1703:2023.pdf23 Mar 2023
Copy of Layout Approval (in case of layout)File: Sanction Layout Plan 1703:2023.pdf23 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMECEMENT CERTIFICATE 17_03_2023_compressed.pdf23 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Dec 2022 (1)_compressed.pdf10 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2022_compressed_compressed.pdf9 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - 31-12-2022.pdf20 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ph III Form 5.pdf22 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 June 2022.pdf18 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Sept 2022.pdf18 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2022_compressed.pdf18 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SEPTEMBER 2022.pdf18 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: CC dtd 01 - 06 - 2021 (1).pdf27 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE 31 03 2022 FORM 1.pdf20 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE 31 03 2022 FORM 2.pdf20 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3 30 03 2022.pdf20 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pristine Greens Phase 3 March 21 Form 3.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Pristine Properties - Greens Phase III Form 5 21.pdf16 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form No 2A F-Y 2019-20.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A f-y 2020-21 uPLOAD.pdf6 Oct 2021
Details of encumbrancesFile: ICICI Bank Closer Index II_compressed.pdf13 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO 1 GREENS III.pdf25 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate word file GHI.pdf25 Aug 2021
Layout approvalFile: Final sanction - 2021 RERA.pdf30 Jul 2021
Copy of Layout Approval (in case of layout)File: Final sanction - 2021 RERA.pdf30 Jul 2021
Proforma of Allotment letterFile: Agreement fpr Greens III_compressed (1)_compressed-compressed.pdf25 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Greens 3.pdf30 Mar 2021
Details of Restarting of Construction work post lockdownFile: pristine Greens PH3.pdf19 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PG - JAN 2020.pdf12 Feb 2020
Copy of the legal title reportFile: REVISED TITLE compressed.pdf9 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT 4 compressed.pdf9 Jan 2020
Proforma of Allotment letterFile: AGREEMENT DRAFT PH 3.pdf9 Jan 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER PH 3.pdf9 Jan 2020
Layout approvalFile: LAYOUT 1.pdf27 Dec 2019
Building plan approvalFile: LAYOUT 1.pdf27 Dec 2019
PAN CardFile: PAN CARD.pdf27 Dec 2019
Details of encumbrancesFile: ENCUMBRANCES.pdf27 Dec 2019
Copy of Layout Approval (in case of layout)File: LAYOUT 1.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT 1.pdf27 Dec 2019
Declaration in FORM BFile: FORM B.pdf27 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 scanned SMALL.pdf27 Dec 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
PRISTINE SQUARESNO 146 PART 1B S NO 170 PART 3 TO 10 AND 12 OFF MUMBAI BANGALORE HIGHWAY NEAR SAYAJI HOTEL WAKAD PUNE 41105761CompletedMar 2017Late, Jun 2017
PRISTINE PROLIFE PART I and IIS NO 146 PART 1B S NO 170 PART 3 TO 10 AND 12 OFF MUMBAI BANGALORE HIGHWAY NEAR SAYAJI HOTEL PUNE 411057752CompletedDec 2015Late, Apr 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRISTINE GREENS PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmPRISTINE GREENS PHASE IICompleted 116Lapsed / revoked 117Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 270 registered projects within 2 km.

Builder: PRISTINE PROPERTIES

PRISTINE PROPERTIES has 6 registrations on MahaRERA, including Pristine Greens Phase 1 and PRISTINE GREENS PHASE II. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRISTINE GREENS PHASE III is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRISTINE GREENS PHASE III?

The registered promoter entity is PRISTINE PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRISTINE GREENS PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRISTINE GREENS PHASE III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRISTINE GREENS PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRISTINE GREENS PHASE III?

The professionals named in the filing: Architect: UNUSUAL SPACES; Engineer: MILIND KULKARNI; Engineer: SACHIN PATIL; Chartered Accountant: R D Kabra; Chartered Accountant: KAILASH AGARWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRISTINE GREENS PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRISTINE GREENS PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRISTINE GREENS PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.