Home / Browse projects / Pune, Maharashtra / Pristine Commerce Street

Registered No litigation declared Commercial project

Pristine Commerce Street

By KANHA DEVELOPERS

RG-MH-05658 · RERA P52100055866 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 70%
186 of 317Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Pristine Commerce Street is a Commercial project by KANHA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100055866 on 23 Apr 2024. Possession is promised by 31 Dec 2026. 131 of the 317 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePristine Commerce Street
  • TypeCommercial
  • Location
    • Nashik Highway Road
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055866
  • ReraGenie IDRG-MH-05658

Builder

  • NameKANHA DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAWFK5031H1Z1
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersParitosh Rajendra Agarwal, Sachin Ishwarchand Goyal, Sankalp Subhash Goel
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

41%131 of 317 units booked
31.1%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA440317317

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.

Building A: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed614

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots614
Closed/Covered168
Open Space446

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,452 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2025
LandownerVillageDistrict
Madhukar Dhondiba NalawadePune (M Corp.)Pune
Asha Madhukar NalawadePune (M Corp.)Pune
Ram Madhukar NalawadePune (M Corp.)Pune
Suvarna Somnath NalawadePune (M Corp.)Pune
Siddhant Somnath NalawadePune (M Corp.)Pune
Sarthak Somnath NalawadePune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI11409.99
Proposed, not sanctioned10,410 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFP 195, CTS 853, Signature Bhamburda, Shivaji Nager, Bhandarkar Road, Pune, Maharashtra - 411004
Estimated costRs 37.82 cr
Cost incurredRs 11.75 cr
Work done31.06%
BuildingWingEstimatedIncurred
Building ANARs 35.93 crRs 11.75 cr
-NARs 1.89 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK a Architecture
EngineerSK Consultants & Engineers
EngineerBhosale S V
Chartered AccountantNB Sayed & Associates
PartnerRole in project
KANHA DEVELOPERS-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000461140Madhukar Dhondiba NalawadeM/s Kanha Developers Through Partner Mr. Paritosh Rajendra Agarwal21/06/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Pristine Commerce Street as on Dec 2025.pdf13 May 2026
Withdrawal Update Form 2File: Form 2 - Pristine Commerce Street_As on 31-12-2025 (1).pdf13 May 2026
Withdrawal Update Form 3File: Form 3 - Pristine Commerce Street_As on 31-12-2025 (1).pdf13 May 2026
Form 2A (FY 2024-2025)File: Form 2A - 2024-25.pdf16 Jan 2026
Withdrawal Update Form 1File: Form 1 - Pristine Commerce Street as on Sep 2025.pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 - Pristine Commerce Street as on Sep 2025.pdf29 Oct 2025
Withdrawal Update Form 3File: Form 3 - Pristine Commerce Street as on Sep 2025.pdf29 Oct 2025
Withdrawal Update Form 1File: Form 1 - Pristine Commerce Street as on June 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 - Pristine Commerce Street as on June 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 - Pristine Commerce Street as on June 2025.pdf17 Oct 2025
Layout approvalFile: 1 - Layout Approval Commerce.pdf16 Oct 2025
Building plan approvalFile: 2 - Building Plan Commerce.pdf16 Oct 2025
Building plan approvalFile: 3 - Building Plan Commerce.pdf16 Oct 2025
Building plan approvalFile: 4 - Building Plan Commerce.pdf16 Oct 2025
Building plan approvalFile: 5 - Building Plan Commerce.pdf16 Oct 2025
Building plan approvalFile: 6 - Building Plan Commerce.pdf16 Oct 2025
Building plan approvalFile: 7 - Building Plan Commerce.pdf16 Oct 2025
Building plan approvalFile: 8 - Building Plan Commerce.pdf16 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pristine Commerce Street as on 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pristine Commerce Street as on March 2025.pdf20 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf17 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrance Letter.pdf17 Jan 2025
Proforma of Agreement for saleFile: M-Shop-243- ANIL LAKHE-compressed.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31-12-2024.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pristine Commerce Street as on 30-09-2024.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MOSHI.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31-12-2024_organized.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Cir 29 - Dec 2024.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pristine Commerce Street as on 31-12-2024_compressed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pristine Commerce Street as on 30-09-2024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pristine Commerce Street as on Sep 2024.pdf29 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pristine Commerce Street as on 30-09-2024.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pristine Commerce Street as on 30-09-2024.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1A.pdf20 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Scanned Document (1)_compressed.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pristine Commerce Street as on 30-06-2024.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pristine Commerce Street as on 30-06-2024.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Pristine Commerce Street as on 30-06-2024.pdf30 Jul 2024
Layout approvalFile: 1-7_11zon (1).pdf12 Apr 2024
Building plan approvalFile: 1-7_11zon (1).pdf12 Apr 2024
Building plan approvalFile: 2-7_11zon.pdf12 Apr 2024
Building plan approvalFile: 3-7_11zon.pdf12 Apr 2024
Building plan approvalFile: 4-7_11zon.pdf12 Apr 2024
Building plan approvalFile: 5-7_11zon.pdf12 Apr 2024
Building plan approvalFile: 6-7_11zon.pdf12 Apr 2024
Building plan approvalFile: 7-7_11zon.pdf12 Apr 2024
PAN CardFile: 1 PAN Card (1).pdf12 Apr 2024
Copy of the legal title reportFile: Moshi Search Title_11zon.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance- Litigations.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance- Litigations.pdf12 Apr 2024
Copy of Layout Approval (in case of layout)File: 1-7_11zon (1).pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1-7_11zon (1).pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-7_11zon.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-7_11zon.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-7_11zon.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-7_11zon.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 6-7_11zon.pdf12 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 7-7_11zon.pdf12 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf12 Apr 2024
Declaration about Commencement CertificateFile: FORMAT D (1).pdf12 Apr 2024
Declaration in FORM BFile: FORM -B (Promoter) (1).pdf12 Apr 2024
CERSAI detailsFile: Declaration of Cersai.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form 3 - Pristine Commerce Street.pdf12 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- Merged- Pristine.pdf12 Apr 2024
Proforma of Agreement for saleFile: AFS_Pristine Commerce Street _Ms Kanha Developers_02042024 - Copy.pdf12 Apr 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (4).pdf12 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details.pdf12 Apr 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (4).pdf12 Apr 2024
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (4).pdf12 Apr 2024
Other - LegalFile: Partnership Deed.pdf12 Apr 2024
Other - TechnicalFile: 1 Other - Technical (17).pdf12 Apr 2024
Other - TechnicalFile: Declaration for Sanctioned Units.pdf12 Apr 2024

How this compares with Pune

41%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pristine Commerce Street on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi13,700+ in Pune

2 kmPristine Commerce StreetCompleted 65Lapsed / revoked 35Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: KANHA DEVELOPERS

KANHA DEVELOPERS has 5 registrations on MahaRERA, including KANHA PLATINUM and PRISTINE PALAZZO. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Pristine Commerce Street is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pristine Commerce Street?

The registered promoter entity is KANHA DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAWFK5031H1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pristine Commerce Street?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Pristine Commerce Street?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Pristine Commerce Street?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pristine Commerce Street?

The professionals named in the filing: Architect: VK a Architecture; Engineer: SK Consultants & Engineers; Engineer: Bhosale S V; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pristine Commerce Street?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pristine Commerce Street. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pristine Commerce Street to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.