Home / Browse projects / Pune, Maharashtra / PRIMEROSE

Registered Litigation declared Residential / Group Housing project

PRIMEROSE

By GURUKRUPA DEVELOPERS

RG-MH-93514 · RERA P52100051551 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 21.50 crore secured on the land, in favour of Piramal Enterprises Limited

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
20 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 38%
69 of 174Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 171 documents Report an error

PRIMEROSE is a Residential / Group Housing project by GURUKRUPA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100051551 on 27 Jun 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 105 of the 174 units on this registration are recorded sold or booked, and 20 of 44 construction stages are filed complete.

At a glance

Project

  • NamePRIMEROSE
  • TypeResidential / Group Housing
  • Location
    • KATRAJ- MUMBAI BYPASS ROAD
    • AMBEGAON BK
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051551
  • ReraGenie IDRG-MH-93514

Builder

  • NameGURUKRUPA DEVELOPERS
  • Entity typePartnership
  • PartnersRahul Suresh Dengle, Sudhakar Dinkar Anerao
  • Other registrations10 more →
  • Completed4 of 11
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredJun 2023First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings4 building records
  • Documents filed171 files

Current status

60%105 of 174 units booked

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B1NA191544044
B2NA191544044
B3NA191542042
B4NA191544044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 38%.

B150%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B250%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B350%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B450%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed267

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots267
Closed/Covered267
BuildingClosed/CoveredTotal
B1264264
B211
B311
B411

Land and ownership11

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared present
Charge in favour ofPiramal Enterprises Limited
Secured amountRs 21.50 crore
CERSAI search filedYes
Declared on21 May 2026
LandownerVillageDistrict
ANERAO YAMUNAAMBEGAON BkPune
SUDHAKAR DINKAR ANERAOAMBEGAON BkPune
GURUKRUPA DEVELOPERSPune (M Corp.)Pune
GAYATRI SHANAKR ANERAOPune (M Corp.)Pune
ARUN RAJARAM ANERAOPune (M Corp.)Pune
SUNANADA ARUN ANERAOPune (M Corp.)Pune
ARYAN SHANKAR ANERAOPune (M Corp.)Pune
AISHWARYA SHANKAR ANERAOPune (M Corp.)Pune
BHAGWAT GANPAT GENDLEPune (M Corp.)Pune
VITTHAL GANPAT GENDLEPune (M Corp.)Pune
PANDURANG GANPAT GENDLEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNCIPAL CORPORATION
Permissible FSI14047.87
Proposed, not sanctioned14,048 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUPPER GRD FLR, SHOP NO 6,7,8 BHADALE COMMERCIAL COMPLEX BUILDING B PLOT NO BS NO 40,2 DATTANAGAR AMBEGAON, PUNE- 411046

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerSIDDHART S ANERAO
Chartered AccountantCA G M KAKADE
PartnerRole in project
GURUKRUPA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22052621058Mar 2026 → Mar 2027

Reason as filed by the promoterThe project was originally registered based on the Commencement Certificate, with a declared completion date of 31/03/2026. Subsequently, during development, the promoter decided to utilize Transferable Development Rights (TDR) in order to optimally and lawfully harness the sanctioned development potential of the project. The approval and sanctioning of the TDR took approximately one year, owing to the extensive administrative and regulatory procedures involved. Since the utilization of TDR was mandatory for implementing the revised sanctioned plans, construction activities directly dependent

Litigation declared1

CaseCourtStatus
745/2021/2021FOURTY ONE THIRD JOINT C J S D AND ADDL C J M PUNEPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed171

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 171 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 March 2026.pdf28 Apr 2026
Form 2File: Form 2 March 2026.pdf28 Apr 2026
Form 3File: Form-3 March 2026.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 2026.pdf28 Apr 2026
Form 2A (FY 2025-2026)File: Quality Assurance.pdf28 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A March 2025.pdf16 Apr 2026
Form 1File: Form 1 June 2025.pdf15 Apr 2026
Form 2File: Form 2 June 2025.pdf15 Apr 2026
Form 3File: Form 3 June 2025_compressed.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: June 2025.pdf15 Apr 2026
Form 1File: Form 1 Sept 2025.pdf15 Apr 2026
Form 2File: Form 2 Sept 2025.pdf15 Apr 2026
Form 3File: Form 3 Sep 2025_compressed.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sept 2025.pdf15 Apr 2026
Form 1File: Form 1_December 2023.pdf6 Apr 2026
Form 2File: Form 2_December 2023.pdf6 Apr 2026
Form 3File: December 2023.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: December 2023.pdf6 Apr 2026
Form 1File: Form 1_March 2024.pdf6 Apr 2026
Form 2File: Form 2_March 2024.pdf6 Apr 2026
Form 3File: March 2024.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: March 2024.pdf6 Apr 2026
Form 1File: Form 1_March 2025.pdf6 Apr 2026
Form 2File: Form 2_March 2025.pdf6 Apr 2026
Form 3File: March 2025.pdf6 Apr 2026
Disclosure of Sold and Booked InventoryFile: March 2025.pdf6 Apr 2026
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf6 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 March 2025.pdf6 Apr 2026
Form 1File: Form 1 Dec 25.pdf2 Apr 2026
Form 2File: Form 2 Dec 25.pdf2 Apr 2026
Form 3File: Form 3 Dec 25.pdf2 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory_Dec 31 2025.pdf2 Apr 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2024.pdf6 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2024.pdf6 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2025.pdf6 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: December 2023.pdf6 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 2024.pdf6 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2024.pdf6 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sept 2024.pdf6 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: December 2024.pdf6 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 2025.pdf6 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 2024.pdf6 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 2025.pdf6 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June 2024.pdf6 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: December 2023.pdf6 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf6 Jul 2025
Disclosure of sold/ booked inventoryFile: December 2023.pdf6 Jul 2025
Disclosure of sold/ booked inventoryFile: Sept 2023.pdf6 Jul 2025
Disclosure of sold/ booked inventoryFile: March 2024.pdf6 Jul 2025
Disclosure of sold/ booked inventoryFile: Sept 2024.pdf6 Jul 2025
Disclosure of sold/ booked inventoryFile: December 2024.pdf6 Jul 2025
Disclosure of sold/ booked inventoryFile: March 2025.pdf6 Jul 2025
Declaration about Commencement CertificateFile: Form D.pdf6 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf6 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM -1.pdf25 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM -1.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf25 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: 3 Commencement Certificate.pdf25 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM -1.pdf25 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM -1.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf25 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf25 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: 3 Commencement Certificate.pdf25 Jun 2025
Declaration about Commencement CertificateFile: CC-2131-24.pdf16 Jun 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Delclaration abour separet bank account.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3_compressed.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf14 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-booked inventory.pdf14 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate(3).pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf14 Feb 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PRIMEROSEKATRAJ MAUMBAI BY PASS HIGHWAY AMEGAON BK HAVELI PUNE 41104679CompletedAug 2018May 2018

How this compares with Pune

60%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRIMEROSE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBEGAON BK13,700+ in Pune

2 kmPRIMEROSECompleted 163Lapsed / revoked 119Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: GURUKRUPA DEVELOPERS

Gurukrupa Developers has 11 registrations on MahaRERA, including Primus Residences and PRIMEROSE. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRIMEROSE is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRIMEROSE?

The registered promoter entity is GURUKRUPA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRIMEROSE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRIMEROSE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRIMEROSE?

The professionals named in the filing: Engineer: SIDDHART S ANERAO; Chartered Accountant: CA G M KAKADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRIMEROSE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRIMEROSE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRIMEROSE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.