Completed No litigation declared Mixed project

Prime Builders and Developers - SadhuAdarsh

By Prime Builders and Developers

RG-MH-26382 · RERA P51800007720 · Last updated on MahaRERA portal: 10 Jun 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2022Possession promisedregistration recorded completed
5 of 11Construction stages doneacross 2 buildings; furthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

Prime Builders and Developers - SadhuAdarsh is a Mixed project by Prime Builders and Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007720 on 17 Aug 2017. The registration is recorded completed; possession was promised by 30 May 2022. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NamePrime Builders and Developers - SadhuAdarsh
  • TypeMixed
  • Location
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007720
  • ReraGenie IDRG-MH-26382

Builder

  • NamePrime Builders and Developers
  • Entity typePartnership
  • PartnersRafikbhai Hasanali Maknojiya, Sohil Maknojia, Rahim Kasam Maknojia, Rafiq Maknojia, Ashraf Momim
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseNov 2020Revised toMay 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion30 May 2022
  • Revised completionRevised to 30 May 2022 (originally 30 Nov 2020)
  • Buildings1 building record
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sadhu Adarsh Prime AuraNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Jun 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 90%.

Sadhu Adarsh Prime Aura69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 10 Jun 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered18
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area888 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2753.47
Proposed, not sanctioned2,267 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDCB bank Jogeshwari

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBhupendra Patrawala
PartnerRole in project
Prime Builders and Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800008573Nov 2020 → Nov 2021

Reason as filed by the promoterDue to the ongoing COVID-19 pandemic, we faced a major shortfall of manpower and materials due to which we were unable to meet the earlier stated timelines

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Prime Aura.pdf10 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sadhu Architect Certificate June 30, 2019.pdf13 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sadhu Architect Certificate - September 30, 2019.pdf13 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sadhu Architect Certificate December 31, 2019.pdf13 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate - Sadhu June 30 2019.pdf7 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate - Sadhu - September 30 2019.pdf7 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Sadhu CC.pdf26 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sadhu Adarsh 31-03-19.pdf20 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sadhu Engg Certi 31-03-19.pdf20 Jun 2019
Certificates of CA (Form 5)File: Prime Builders - Sadhuadarsh.pdf17 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sadhu Architects Certificate March 31, 2018.pdf11 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sadhu Engg Certificate March 31, 2018.pdf11 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sadhu (Architect Certificate) - January 2018.pdf17 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sadhu (Engineering Certificate) - January 2018.pdf17 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Prime Aura - Architect.pdf16 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Prime Aura - Engineer_opt.pdf16 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Prime Aura engg.pdf31 Jul 2017
Certificates of CA (Form 3)File: Prime Aura_CA.pdf31 Jul 2017
Layout approvalFile: Sadhu Layout PLan-ilovepdf-compressed.pdf30 Jul 2017
PAN CardFile: Pan.pdf30 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: Sadhu Layout PLan-ilovepdf-compressed.pdf30 Jul 2017
Proforma of Allotment letterFile: Declaration - Sadhu.pdf30 Jul 2017
Building plan approval or NA orderFile: Sadhu IOD - 2013-ilovepdf-compressed.pdf29 Jul 2017
Building plan approval or NA orderFile: Sadhu IOD - 2016-ilovepdf-compressed.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate-ilovepdf-compressed (1).pdf29 Jul 2017
Details of encumbrancesFile: Sadhu Encumbrance.pdf29 Jul 2017
Building Plan Approval (IOD)File: Sadhu IOD - 2013-ilovepdf-compressed.pdf29 Jul 2017
Building Plan Approval (IOD)File: Sadhu IOD - 2016-ilovepdf-compressed.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC - Sadhu.pdf29 Jul 2017
Declaration in FORM BFile: Affidavit - Sadhu.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate - Sadhu.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prime Builders and Developers - SadhuAdarsh on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmPrime Builders and DevelCompleted 123Lapsed / revoked 67Abeyance 1Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 333 registered projects within 2 km.

Builder: Prime Builders and Developers

Prime Builders and Developers has 4 registrations on MahaRERA, including Prime Builders and Prime Builders and Developers - SadhuAdarsh. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Prime Builders and Developers - SadhuAdarsh is delayed beyond 30 May 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prime Builders and Developers - SadhuAdarsh?

The registered promoter entity is Prime Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prime Builders and Developers - SadhuAdarsh?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Prime Builders and Developers - SadhuAdarsh?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prime Builders and Developers - SadhuAdarsh?

The professionals named in the filing: Architect: Bhupendra Patrawala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prime Builders and Developers - SadhuAdarsh?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prime Builders and Developers - SadhuAdarsh. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prime Builders and Developers - SadhuAdarsh to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.