Home / Browse projects / Pune, Maharashtra / PRIMAL PRIDE
PRIMAL PRIDE
RG-MH-34318 · RERA P52100052020 · Last updated on MahaRERA portal: 6 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRIMAL PRIDE is a Others project by Primal Pride LLP in Pune, Maharashtra, registered with MahaRERA as P52100052020 on 19 Jul 2023. Possession is promised by 31 May 2029. 193 of the 251 units on this registration are recorded sold or booked, and 21 of 77 construction stages are filed complete.
At a glance
Project
- NamePRIMAL PRIDE
- TypeOthers
- Location
- CHIKHALI
- Haveli
- Pune
- 412105
- Pincode412105
- RERA no.P52100052020
- ReraGenie IDRG-MH-34318
Builder
- NamePrimal Pride LLP
- Entity typePartnership
- PartnersAKASH ANIL BARNE, DEEPAK BABAN BARNE, NAVANATH TUKARAM BARNE, NITIN SHAHAJI KARPE, PRASHANT PANDURANG MEDANKAR, SANKET POPAT MURKUTE, VIJAY PANDURANG SASTE, DHANAJAY SOPAN SASTE, YOGESH DATTATRAY BARNE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 Jul 2023
- Promised completion31 May 2029
- Revised completionNone
- Buildings7 building records
- Documents filed173 files
Current status
Figures as on 6 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 5 | 4 | 0 | 21 | 21 |
| B WING | NA | 17 | 14 | 54 | 0 | 54 |
| C WING | NA | 26 | 23 | 92 | 0 | 92 |
| D WING | NA | 16 | 13 | 52 | 0 | 52 |
| E WING | NA | 3 | 0 | 0 | 0 | 0 |
| F WING | NA | 3 | 0 | 0 | 0 | 0 |
| G WING | NA | 12 | 11 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
A WING34%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B WING97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
C WING92%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 65% |
D WING61%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E WING33%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 90% |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
F WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
G WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed119
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 20 | 20 |
| B WING | 14 | 14 |
| C WING | 23 | 23 |
| D WING | 13 | 13 |
| E WING | 23 | 23 |
| F WING | 14 | 14 |
| G WING | 12 | 12 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C WING | NA | Rs 38.92 cr | Rs 16.05 cr |
| D WING | NA | Rs 22.00 cr | Rs 9.07 cr |
| B WING | NA | Rs 18.88 cr | Rs 7.79 cr |
| - | NA | Rs 18.00 cr | Rs 7.42 cr |
| A WING | NA | Rs 12.52 cr | Rs 5.16 cr |
| G WING | NA | Rs 9.69 cr | Rs 4.00 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | I P ASSOCIATES |
| Engineer | Gorakshnath Bhosale |
| Engineer | YogeshWARI Chandrakant Patil |
| Chartered Accountant | Navdeep Jindal & Associates |
| Chartered Accountant | CA Dolly Gandhi |
| Partner | Role in project |
|---|---|
| Primal Pride LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2029
Documents filed173
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 173 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form-2 SIgn.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: Form-3 SIgn.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Architech Certificate.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: CA Form 3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Form-2.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3 Primal PRide Sep_25 Sign_compressed (1).pdf | 15 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form-5 signed.pdf | 30 Sep 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A.pdf | 4 Sep 2025 |
| Form 2A (FY 2023-2024)File: Quality Assurance Certificate.pdf | 4 Sep 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 18 Jul 2025 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 18 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 signed.pdf | 18 Jul 2025 |
| Form 1File: Architect Certificate June Month (1).pdf | 4 Jun 2025 |
| Form 2File: Engineer Certificate June 2024.pdf | 4 Jun 2025 |
| Form 3File: Form 3 CA June 24.pdf | 4 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Booked Inventory.pdf | 4 Jun 2025 |
| Form 1File: Architech Certificate.pdf | 4 Jun 2025 |
| Form 2File: Enigineer Certificate.pdf | 4 Jun 2025 |
| Form 3File: CA Form 3.pdf | 4 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 4 Jun 2025 |
| Form 1File: Architech Certificate.pdf | 4 Jun 2025 |
| Form 2File: form 2 signed.pdf | 4 Jun 2025 |
| Form 3File: signed Form 3.pdf | 4 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & unsold inventory.pdf | 4 Jun 2025 |
| Form 1File: Form-1.pdf | 4 Jun 2025 |
| Form 2File: Form-2.pdf | 4 Jun 2025 |
| Form 3File: FORM 3 Primal PRide Mar 25 Signed.pdf | 4 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory Mar 25.pdf | 4 Jun 2025 |
| Form 1File: Form 1 Mar 24.pdf | 4 Jun 2025 |
| Form 2File: Engineers Certificate.pdf | 4 Jun 2025 |
| Form 3File: Form 3 converted.pdf | 4 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf | 4 Jun 2025 |
| Withdrawal Update Form 1File: Form-1.pdf | 4 Jun 2025 |
| Withdrawal Update Form 1File: Form-1.pdf | 4 Jun 2025 |
| Withdrawal Update Form 1File: Form-1.pdf | 4 Jun 2025 |
| Withdrawal Update Form 2File: Form-2.pdf | 4 Jun 2025 |
| Withdrawal Update Form 2File: Form-2.pdf | 4 Jun 2025 |
| Withdrawal Update Form 2File: Form-2.pdf | 4 Jun 2025 |
| Withdrawal Update Form 3File: FORM 3 Primal PRide Mar 25 Signed.pdf | 4 Jun 2025 |
| Withdrawal Update Form 3File: FORM 3 Primal PRide Mar 25 Signed.pdf | 4 Jun 2025 |
| Withdrawal Update Form 3File: FORM 3 Primal PRide Mar 25 Signed.pdf | 4 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Primal PRide Mar 25 Signed.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Mar 25.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf | 3 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf | 28 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed Form 3.pdf | 28 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 28 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure Of Secured Unsecured.pdf | 10 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Primal Pride Audit Report Rera Signed.pdf | 29 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf | 27 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enigineer Certificate.pdf | 27 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June Month (1).pdf | 9 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate June 2024.pdf | 9 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA June 24.pdf | 9 Aug 2024 |
| Layout approvalFile: HPSCANNER2377 Layout.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2376 02.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2375 03.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2374 04.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2373 05.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2372 06.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2371 07.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2370 08.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2369 09.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2367 10.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2366 11.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2365 12.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2364 13.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2363 14.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2362_ 15.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2361 16.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2360 17.pdf | 25 Jul 2024 |
| Building plan approvalFile: HPSCANNER2359 18.pdf | 25 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: HPSCANNER2377 Layout.pdf | 25 Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 173 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRIMAL PRIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHIKHALI13,700+ in Pune
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Primal Pride LLP
Primal Pride LLP has 1 registration on MahaRERA, including PRIMAL PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PRIMAL PRIDE is delayed beyond 31 May 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRIMAL PRIDE?
The registered promoter entity is Primal Pride LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRIMAL PRIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRIMAL PRIDE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRIMAL PRIDE?
The professionals named in the filing: Architect: I P ASSOCIATES; Engineer: Gorakshnath Bhosale; Engineer: YogeshWARI Chandrakant Patil; Chartered Accountant: Navdeep Jindal & Associates; Chartered Accountant: CA Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRIMAL PRIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback