ReraGenieLog inGet a buyer report

Home / Browse projects / Jalgaon, Maharashtra / PRIDE RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

PRIDE RESIDENCY

By SUMIT MAHENDRA CHORDIA

RG-MH-58016 · RERA P49900050252 · Last updated on MahaRERA portal: 4 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Jalgaon registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
3 of 11Construction stages donefurthest along: Internal walls, 75%
1Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

PRIDE RESIDENCY is a Residential / Group Housing project by SUMIT MAHENDRA CHORDIA in Jalgaon, Maharashtra, registered with MahaRERA as P49900050252 on 27 Mar 2023. Possession was promised by 31 Dec 2024 and is now 22 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePRIDE RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • T.P.S.No. II
    • At Satare Shivar
    • Bhusawal (CT)
    • Bhusawal
    • Jalgaon
    • 425201
  • Pincode425201
  • RERA no.P49900050252
  • ReraGenie IDRG-MH-58016

Builder

  • NameSUMIT MAHENDRA CHORDIA
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

22 months past promisethis monthRegisteredMar 2023PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Mar 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRIDE RESIDENCYNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

PRIDE RESIDENCY: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises68%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 4 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes65%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes65%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area322 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI715.65
Proposed, not sanctioned716 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAMNER ROAD, BHUSAWAL

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKunal Wankhede
EngineerMilind Rathi
Chartered AccountantPratik Kejariwal
PartnerRole in project
SUMIT MAHENDRA CHORDIA-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500064Ram GawaliSUMIT MAHENDRA CHORDIA28/05/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7_FORM 1 30_09_2024.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7_ FORM 3 30_09_2024.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7_ FORM 2 30_09_2024.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6_ FORM 2 30_06_2024.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_ FORM 2 31_03_2024.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_ FORM 2 31_12_2023.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_ FORM 2 30_09_2023.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_ FORM 2 30_06_2023.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_ FORM 2 31_03_2023.pdf4 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_ FORM 1 30_06_2023.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_ FORM 1 30_09_2023.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_ FORM 1 31_12_2023.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5_ FORM 1 31_03_2024.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6_ FORM 1 30_06_2024.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_ FORM 1 31_03_2023.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_ FORM 3 31_12_2023.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6_ FORM 3 30_06_2024.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5_ FORM 3 31_03_2024.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_ FORM 3 30_09_2023.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2_ FORM 3 30_06_2023.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_ FORM 3 31_03_2023.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_ FORM 2 30_06_2023.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6_ FORM 2 30_06_2024.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_ FORM 2 31_03_2024.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_ FORM 2 31_12_2023.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_ FORM 2 30_09_2023.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_ FORM 2 31_03_2023.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1_ FORM 2A 31_03_2023.pdf16 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 01_Form 5_2023.pdf16 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2_ FORM 2A 31_03_2024.pdf16 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 02_Form 5_2024.pdf16 Oct 2024
Declaration about Commencement CertificateFile: DocScanner Mar 16, 2023 6-41 PM.pdf21 Mar 2023
Details of encumbrances concerned to FinanceFile: Declaration regarding encumbrances.pdf15 Feb 2023
Details of encumbrances concerned to LegalFile: Declaration regarding encumbrances.pdf15 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200260349183_For_Asset_Based_Search_15_02_2023_11_23_33_172.pdf15 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - RERA.pdf15 Feb 2023
Proforma of Agreement for saleFile: Agreement to sale.pdf15 Feb 2023
Proforma of Allotment letterFile: Allotment LETTER.pdf15 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of bank account.pdf15 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation wrt Model copy of Allotment letter.pdf15 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation wrt Model copy of Agreement.pdf15 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure of Interest in Other Real Estate Organizations.pdf11 Jan 2023
Layout approvalFile: Commencement Layout.pdf10 Jan 2023
Building plan approvalFile: Sanctioned Plan.pdf10 Jan 2023
PAN CardFile: Promoter PAN.pdf10 Jan 2023
Copy of the legal title reportFile: Land Title Report.pdf10 Jan 2023
Details of encumbrances concerned to FinanceFile: Declaration regarding encumbrances.pdf10 Jan 2023
Details of encumbrances concerned to LegalFile: Declaration regarding encumbrances.pdf10 Jan 2023
Copy of Layout Approval (in case of layout)File: Commencement Layout.pdf10 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan.pdf10 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Layout.pdf10 Jan 2023
Declaration in FORM BFile: Form B Promoters - notary.pdf10 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details.pdf10 Jan 2023
Other - LegalFile: Land Purchase deed - final.pdf10 Jan 2023

How this compares with Jalgaon

5%of Jalgaon projects moved their completion datethis one has not
32%of Jalgaon registrations have lapsed or been cancelledthis one is among them

Computed across the 230+ Jalgaon projects on ReraGenie, from their own filings.

Keep PRIDE RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near At Satare Shivar230+ in Jalgaon

Builder: SUMIT MAHENDRA CHORDIA

SUMIT MAHENDRA CHORDIA has 2 registrations on MahaRERA, including SAMRUDDHI HEIGHTS PHASE II and PRIDE RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Jalgaon district page.

Frequently asked questions

What does it mean that PRIDE RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PRIDE RESIDENCY is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRIDE RESIDENCY?

The registered promoter entity is SUMIT MAHENDRA CHORDIA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRIDE RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRIDE RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRIDE RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRIDE RESIDENCY?

The professionals named in the filing: Architect: Kunal Wankhede; Engineer: Milind Rathi; Chartered Accountant: Pratik Kejariwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRIDE RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRIDE RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRIDE RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.