Home / Browse projects / Mumbai Suburban, Maharashtra / PRAYOG

Completed No litigation declared Residential / Group Housing project

PRAYOG

By PSC PROPERTIES PRIVATE LIMITED

RG-MH-12035 · RERA P51800001932 · Last updated on MahaRERA portal: 20 Nov 2018

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
1Complaints at MahaRERAon this registration
Jump to the 22 documents Report an error

PRAYOG is a Residential / Group Housing project by PSC PROPERTIES PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001932 on 29 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePRAYOG
  • TypeResidential / Group Housing
  • Location
    • Road No.2
    • Andheri
    • Mumbai Suburban
    • 400055
  • Pincode400055
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001932
  • ReraGenie IDRG-MH-12035

Builder

  • NamePSC PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • Other registrations2 more →
  • Completed3 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseDec 2017Revised toDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion31 Dec 2018
  • Revised completionRevised to 31 Dec 2018 (originally 31 Dec 2017)
  • Buildings2 building records
  • Documents filed22 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA90000
WING BNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Nov 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

WING A86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
WING B86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities17

As on 20 Nov 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes60%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Fitness CentreYes50%
Terrace GardenYes60%

Parking filed58

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots58
Closed/Covered58
BuildingClosed/CoveredTotal
WING A2626
WING B3232

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,836 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4957.02
Proposed, not sanctioned4,957 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch214-215, CITY MALL, 2ND FLOOR, PLOT NO 1, S NO 132, GANESH KHIND ROAD, PUNE 411007

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjeev Patki
EngineerJ W Consultants
PartnerRole in project
PSC PROPERTIES PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800000135Dec 2017 → Dec 2018

Reason as filed by the promoterConstruction activity in the Project is already completed. Based on that, MCGM has issued Part Occupation Certificate. MCGM is holding balance Occupation Certificate of 4 flats in B wing of the Project, only on the grounds of certain paper work compliance. When we had applied for Occupation Certificate in MCGM, MCGM has restricted Four flats in B Wing in the pretext of submission of PRC of setback area. WE have given possession of road setback area and received acknowledgement from MCGM dated 9/4/2014. We applied to City Survey Office for issuance of property card in the name of MCGM towards t

Litigation declared1

CaseCourtStatus
CC006000000055356/2018Maharashtra Real Estate Regulatory AuthorityBoth the parties sough to settle the matter amicably Next date is Twenty one September two thousan

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000055356Manan Mukesh ShahPSC Properties Pvt Ltd12/07/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed22

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 4)File: OC and Form 4 Prayog.pdf20 Nov 2018
Certificates of CA (Form 5)File: Prayog.pdf8 Oct 2018
Certificates of Architect (Form 4)File: Prayog-Form 4 etc.pdf30 Dec 2017
Declaration in FORM BFile: Form B_Prayog-(Corrected).pdf29 Aug 2017
Proforma of Allotment letterFile: Proforma_Allotment Ltr (Corrected) and Agreement_Prayog.pdf29 Aug 2017
Declaration in FORM BFile: Form B_Prayog.pdf27 Jul 2017
Certificates of CA (Form 3)File: Form 3_CA Certificate_Prayog.pdf27 Jul 2017
Copy of the legal title reportFile: Tital Report_Prayog.pdf25 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate_Prayog.pdf25 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Prayog.pdf25 Jul 2017
Proforma of Allotment letterFile: Proforma_Allotment Ltr and Agreement_Prayog.pdf25 Jul 2017
Building plan approvalFile: IOD - Prayog - Part1.pdf21 Jul 2017
Layout approvalFile: IOD - Prayog - Part1.pdf21 Jul 2017
Layout approvalFile: IOD - Prayog - Part2.pdf21 Jul 2017
Building plan approvalFile: IOD - Prayog - Part2.pdf21 Jul 2017
PAN CardFile: PSC Properties Pvt Ltd.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: IOD - Prayog - Part1.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: IOD - Prayog - Part2.pdf21 Jul 2017
Building Plan Approval (IOD)File: IOD - Prayog - Part1.pdf21 Jul 2017
Building Plan Approval (IOD)File: IOD - Prayog - Part2.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - Prayog.pdf21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate_Prayog.pdf21 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
GEETANJALI CHS LTDSHAHAJI RAJE MARG VILE PARLE EAST MUMBAI 40005735CompletedOct 2014Late, Dec 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRAYOG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmPRAYOGCompleted 158Lapsed / revoked 83Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 378 registered projects within 2 km.

Builder: PSC PROPERTIES PRIVATE LIMITED

PSC PROPERTIES PRIVATE LIMITED has 3 registrations on MahaRERA, including Vighnarajendra and PRAYOG. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PRAYOG is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRAYOG?

The registered promoter entity is PSC PROPERTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRAYOG?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PRAYOG?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PRAYOG?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRAYOG?

The professionals named in the filing: Architect: Sanjeev Patki; Engineer: J W Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRAYOG?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRAYOG. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRAYOG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.