Completed No litigation declared Plotted project

PRATHAMESH AURA 4

By BHARATI ARVIND MANDHARE

RG-MH-48989 · RERA P52100050360 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
1 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

PRATHAMESH AURA 4 is a Plotted project by BHARATI ARVIND MANDHARE in Pune, Maharashtra, registered with MahaRERA as P52100050360 on 5 Apr 2023. The registration is recorded completed; possession was promised by 30 Mar 2026. The completion date has moved by 12 months from the original filing. 28 of the 29 units on this registration are recorded sold or booked.

At a glance

Project

  • NamePRATHAMESH AURA 4
  • TypePlotted
  • Location
    • -
    • YAWALEWADI
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050360
  • ReraGenie IDRG-MH-48989

Builder

  • NameBHARATI ARVIND MANDHARE
  • Entity typeIndividual

Key dates

this monthRegisteredApr 2023First promiseMar 2025Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Apr 2023
  • Promised completion30 Mar 2026
  • Revised completionRevised to 30 Mar 2026 (originally 31 Mar 2025)
  • BuildingsNot stated in filing
  • Documents filed96 files

Current status

97%28 of 29 units booked
100.0%Work done, per cost certificate

Figures as on 4 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,973 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3764.37
Proposed, not sanctioned3,764 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 101-104, VISHVESHWAR BANK CHOWK, DHANKAWADI, PUNE 411043
Estimated costRs 88.75 lakh
Cost incurredRs 88.75 lakh
Work done100.0%
BuildingWingEstimatedIncurred
-NARs 88.75 lakhRs 88.75 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Vikas M Dhere
EngineerMr Pratik Shivaji Hulawale
Chartered AccountantBhave and Bhave Associates
Chartered AccountantPawar & Associates
PartnerRole in project
BHARATI ARVIND MANDHARE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22052501214Mar 2025 → Mar 2026

Reason as filed by the promoterConstruction of the said project is almost completed. We need extension to complete the remaining construction

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jun 2026

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Aura 4 Q3.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 Aura 4 Q3.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Bharti M.pdf4 Jun 2026
Completion CertificateFile: Bharti Mandhare Completion Certificate Yevlevadi (4 files merged).pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1 Aura 4 Q3.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 Aura 4 Q3.pdf19 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Bharti M.pdf19 Feb 2026
Withdrawal Update Form 1File: Architect Certificate Form 1 Sep-25 BHARATI.pdf12 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sep 25 BHARATI.pdf12 Nov 2025
Withdrawal Update Form 3File: Form 3 CA Certificate Bharti M.pdf12 Nov 2025
Withdrawal Update Form 1File: Architect Certificate Form 1 Sep-25 BHARATI.pdf11 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sep 25 BHARATI.pdf11 Nov 2025
Withdrawal Update Form 3File: Form 3 CA Certificate Bharti M.pdf11 Nov 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate June 2025 BHARATI - Aura 4.pdf8 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate BHARATI - Aura 4.pdf8 Oct 2025
Withdrawal Update Form 3File: Revise Form 3 CACertificate BHARATI - Aura 4.pdf8 Oct 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate June 2025 BHARATI - Aura 4.pdf8 Aug 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate BHARATI - Aura 4.pdf8 Aug 2025
Withdrawal Update Form 3File: Revise Form 3 CACertificate BHARATI - Aura 4.pdf8 Aug 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate June 2025 BHARATI - Aura 4.pdf21 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate BHARATI - Aura 4.pdf21 Jul 2025
Withdrawal Update Form 3File: Revise Form 3 CACertificate BHARATI - Aura 4.pdf21 Jul 2025
Form 2A (FY 2024-2025)19 May 2025
Form 2A (FY 2023-2024)File: Bharati Mandhare Declaration for 2A.pdf19 May 2025
Form 5 (FY 2023-2024)File: Form 5 Bhrati Mandhare Aura 4 (1).pdf19 May 2025
Form 1File: Architect Certificate 31 Mar 25 - Bharati Mandhare.pdf16 May 2025
Form 2File: Engr Certificate 31 Mar 25 - Bharati Mandhare.pdf16 May 2025
Form 3File: Form 3 Bharati Mandhare Aura 4 Mar 2025.pdf16 May 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Inventory 31 Mar 25 - Bharati Mandhare.pdf16 May 2025
Form 5 (FY 2024-2025)File: Form 5 Bhrati Mandhare Aura 4.pdf16 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Bhrati Mandhare Aura 4.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bharati Mandhare Aura 4 Mar 2024.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bharati Mandhare Aura 4 Jun 2024.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bharati Mandhare Aura 4 Sep 2024.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bharati Mandhare Aura 4 Dec 2024.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bharati Mandhare Aura 4 Mar 2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30 Sep 24 - Bharati Mandhare.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31 Dec 24 - Bharati Mandhare.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31 Mar 25 - Bharati Mandhare.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engr Certificate 31 Dec 2024 - Bharati Mandhare.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engr Certificate 31 Mar 25 - Bharati Mandhare.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory 31 Dec 24 - Bharati Mandhare.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Inventory 31 Mar 25 - Bharati Mandhare.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Prathamesh Aura 4 Form 2 Q2.pdf4 Nov 2024
Disclosure of sold/ booked inventoryFile: Prathamesh Aura 4 Inventory Details Q2.pdf4 Nov 2024
Layout approvalFile: Aura 4 Layout_compressed.pdf28 Oct 2024
Copy of Layout Approval (in case of layout)File: Aura 4 Layout_compressed.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 2024.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jun 2024.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2024.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun 2024.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Mar 2024.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Bharati Mandhare.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Booked Inventory Mar 2024.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Booked Inventory June 2024.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aura 4 Form 1 27 05 2023.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aura 4 Form 1 05 10 2023.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aura 4 Form 1 15 01 2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aura 4 Form 2 25 08 2023.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aura 4 Form 2 30 09 23.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aura 4 Form 2 04 01 2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Aura 4 sold unsold 30 06 2023.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Aura 4 sold unsold 30 09 2023.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Aura 4 sold unsold 31 12 2023.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aura 4 Form 3 June 2023_compressed.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aura 4 Form 3 Sept 2023_compressed.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aura 4 Form 3 Dec 2023_compressed.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form no 2A.pdf27 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Bharati Mandhare.pdf24 Nov 2023
Disclosure of sold/ booked inventoryFile: Discolsure of sold inventory Bharati Mandhare.pdf24 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Bharti Mandhare.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert - Bharati Mandhare.pdf28 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engr Cert - Bharati Mandhare.pdf28 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Declaration - Bharti Mandhare.pdf28 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory - Bharti Mandhare.pdf28 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: merged BANK DETAILS BHARTI.pdf25 Mar 2023
Building plan approval or NA orderFile: 1 Copy of Layout Approval (in case of layout) (1).pdf20 Mar 2023
Copy of the legal title reportFile: Bharti Mandhare Search_compressed.pdf20 Mar 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf20 Mar 2023
Details of encumbrances concerned to FinanceFile: No Legal Encumbrance.pdf20 Mar 2023

How this compares with Pune

97%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRATHAMESH AURA 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near YAWALEWADI13,700+ in Pune

Builder: BHARATI ARVIND MANDHARE

BHARATI ARVIND MANDHARE has 1 registration on MahaRERA, including PRATHAMESH AURA 4. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRATHAMESH AURA 4 is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRATHAMESH AURA 4?

The registered promoter entity is BHARATI ARVIND MANDHARE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRATHAMESH AURA 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRATHAMESH AURA 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRATHAMESH AURA 4?

The professionals named in the filing: Architect: Mr Vikas M Dhere; Engineer: Mr Pratik Shivaji Hulawale; Chartered Accountant: Bhave and Bhave Associates; Chartered Accountant: Pawar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRATHAMESH AURA 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRATHAMESH AURA 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRATHAMESH AURA 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.