Home / Browse projects / Raigarh, Maharashtra / PRAKASH TOWER
PRAKASH TOWER
By JAI BUILDERS AND DEVELOPERS
RG-MH-18917 · RERA P52000077868 · Last updated on MahaRERA portal: 6 Oct 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- Completion date moved by 4 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRAKASH TOWER is a Others project by JAI BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000077868 on 7 Nov 2024. Possession is promised by 31 Jul 2031. The completion date has moved by 4 months from the original filing. 12 of the 32 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NamePRAKASH TOWER
- TypeOthers
- Location
- PLOT NO. 37 & 37C
- SECTOR 12
- KAMOTHE
- Kamothe
- Panvel
- Raigarh
- 410209
- Pincode410209
- RERA no.P52000077868
- ReraGenie IDRG-MH-18917
Builder
- NameJAI BUILDERS AND DEVELOPERS
- Entity typePartnership
- GSTIN27AAHFJ6741J1Z1
- PartnersJAYKUMAR PRAKASHBHAI PATEL, RAJESHKUMAR MULCHAND CHAVALA, RAHUL KANIYALAL KHANEJA, JETHANAND MEHRUMAL JAGWANI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Nov 2024
- Promised completion31 Jul 2031
- Revised completionRevised to 31 Jul 2031 (originally 31 Mar 2031)
- Buildings1 building record
- Documents filed64 files
Current status
Figures as on 6 Oct 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PRAKASH TOWER | NA | 7 | 7 | 25 | 7 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 75%.
PRAKASH TOWER: 16% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 75% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed118
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PRAKASH TOWER | NA | Rs 34.00 cr | Rs 3.37 cr |
| - | NA | Rs 2.27 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DESTINATION ARCHITECTURE INTERIOR DESIGNS |
| Engineer | Kunal Dattatrey Jadhav |
| Engineer | SHRAVANI CONSULTANTS |
| Chartered Accountant | PJPJ & ASSOCIATES |
| Chartered Accountant | Piyush Ghatliya & Co |
| Partner | Role in project |
|---|---|
| JAI BUILDERS AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 400014/2016/2016 | District Court Raigad Alibag | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2031
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 DAID-RR-597-26-27-L9 2026-09-30.pdf | 6 Oct 2026 |
| Withdrawal Update Form 2File: Form 2 30--09-2026.pdf | 6 Oct 2026 |
| Withdrawal Update Form 3File: Form 3 Prakash Tower 30-09-26.pdf | 6 Oct 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-25 sign.pdf | 3 Oct 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 2025-26 sign.pdf | 3 Oct 2026 |
| Form 5 (FY 2025-2026)File: Form 5- Prakash Tower FY 25-26.pdf | 3 Oct 2026 |
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE L8 2026-06-30.pdf | 7 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Prakash Tower 30-06-2026.pdf | 7 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 Prakash Tower 30-06-2026.pdf | 7 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 31-03-2026.pdf | 11 May 2026 |
| Withdrawal Update Form 2File: Form 2 31-03-2026.pdf | 11 May 2026 |
| Withdrawal Update Form 3File: Form 3 Prakash Tower 31-03-2026 sign_compressed.pdf | 11 May 2026 |
| Withdrawal Update Form 1File: Form 1 Prakash Tower 30-6-2025 Sign.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Prakash Tower 30-9-2025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Prakash Tower 31-12-2025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Prakash Tower 30-6-2025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Prakash Tower 30-9-2025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Prakash Tower 30-9-2025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Prakash Tower 30-6-2025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Prakash Tower 30-9-2025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Prakash Tower 31-12-2025.pdf | 4 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5- Prakash Tower FY 24-25.pdf | 16 Oct 2025 |
| Form 1File: FORM 1 jay q4.pdf | 11 Jun 2025 |
| Form 2File: Form 2 jay q4.pdf | 11 Jun 2025 |
| Form 3File: Form 3_Prakash Tower_13-05-2025.pdf | 11 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold unsold jay q4.pdf | 11 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration of QPR jay q4.pdf | 11 Jun 2025 |
| Copy of the legal title reportFile: Legal Tittle Report 04-02-2025.pdf | 16 Apr 2025 |
| Copy of the legal title reportFile: Search Report 04-02-2025.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_F.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 28 Feb 2025 |
| Other - FinanceFile: Declaration to MahaRERA regarding project completion date.pdf | 6 Nov 2024 |
| Other - TechnicalFile: ANNEXURE A JAI.pdf | 29 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement - New.pdf | 29 Oct 2024 |
| Proforma of Agreement for saleFile: Agreement for Sale (RERA) - Prakash Tower-New.pdf | 29 Oct 2024 |
| Other - TechnicalFile: CC Verification for Development permission granted by PMC.pdf | 18 Oct 2024 |
| Proforma of Allotment letterFile: Allotment Letter - Prakash Tower.pdf | 16 Oct 2024 |
| Other - LegalFile: Agreement to Lease of Plot No 37 Sector 12 Kamothe (1).pdf | 15 Oct 2024 |
| Other - LegalFile: Agreement to Lease of Plot No 37C Sector 12 Kamothe (1).pdf | 15 Oct 2024 |
| Building plan approvalFile: CC DWG - PLOT 37, 37C, SECTOR 12, KAMOTHE (1).pdf | 13 Oct 2024 |
| Layout approvalFile: CC DWG - PLOT 37, 37C, SECTOR 12, KAMOTHE (1).pdf | 13 Oct 2024 |
| PAN CardFile: Pan - Jai Builders and Developers.pdf | 13 Oct 2024 |
| Copy of the legal title reportFile: Legal Title Report - Prakash Tower.pdf | 13 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance.pdf | 13 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Legal.pdf | 13 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: CC DWG - PLOT 37, 37C, SECTOR 12, KAMOTHE (1).pdf | 13 Oct 2024 |
| Declaration in FORM BFile: Form B.pdf | 13 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE - 13-09-2024.pdf | 13 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CERTIFICATE - 17-09-2024.pdf | 13 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER CERTIFICATE - 17-09-2024.pdf | 13 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC COPY - PLOT 37, 37C, SECTOR 12, KAMOTHE.pdf | 13 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: CC DWG - PLOT 37, 37C, SECTOR 12, KAMOTHE (1).pdf | 13 Oct 2024 |
| Other - LegalFile: Tripartite Agreement of Plot No 37 Sector 12 Kamothe.pdf | 13 Oct 2024 |
| Other - LegalFile: Tripartite Agreement of Plot No 37C Sector 12 Kamothe.pdf | 13 Oct 2024 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 13 Oct 2024 |
| CERSAI detailsFile: CERSAI Asset Based Search Report.pdf | 13 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A as per order 56-2024.pdf | 13 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf | 13 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance.pdf | 13 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf | 13 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 13 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B as per order 56-2024_ NEW.pdf | 13 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Secured OR Unsecured finance availed.pdf | 13 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 64 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRAKASH TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SECTOR 12, KAMOTHE5,900+ in Raigarh
Plot No -1 Sector - 28 Khandeshwar Railway Sta
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -2,Sector-39,Mansarovar Railway Statio
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
FLORENCE
VILLA REALCON LLP
One Millennium
MILLENNIUM INFRA
LK VIVANTA
LK DIWANI INFRA
BHAVESHWAR VISTA
BHAVESHWAR INFRA
See every Raigarh project, with the district possession charts
Builder: JAI BUILDERS AND DEVELOPERS
JAI BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including PRAKASH TOWER. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if PRAKASH TOWER is delayed beyond 31 Jul 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRAKASH TOWER?
The registered promoter entity is JAI BUILDERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAHFJ6741J1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRAKASH TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRAKASH TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRAKASH TOWER?
The professionals named in the filing: Architect: DESTINATION ARCHITECTURE INTERIOR DESIGNS; Engineer: Kunal Dattatrey Jadhav; Engineer: SHRAVANI CONSULTANTS; Chartered Accountant: PJPJ & ASSOCIATES; Chartered Accountant: Piyush Ghatliya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRAKASH TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback