Home / Browse projects / Mumbai Suburban, Maharashtra / PRABHAT KUNJ

Completed No litigation declared Residential / Group Housing project

PRABHAT KUNJ

By LAKSHMICONSTRUCTION

RG-MH-49456 · RERA P51800047024 · Last updated on MahaRERA portal: 17 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

PRABHAT KUNJ is a Residential / Group Housing project by LAKSHMICONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047024 on 26 Sep 2022. The registration is recorded completed; possession was promised by 30 Jun 2025.

At a glance

Project

  • NamePRABHAT KUNJ
  • TypeResidential / Group Housing
  • Location
    • PRABHAT COLONY ROAD NO.6
    • SANTACRUZ EAST
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400055
  • Pincode400055
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047024
  • ReraGenie IDRG-MH-49456

Builder

  • NameLAKSHMICONSTRUCTION
  • Entity typePartnership
  • GSTIN27AACFL3042M1ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersDEEPAK INDULAL SHAH, HARSHA BIPIN SAVLA
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2022PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Sep 2022
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed117 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRABHAT KUNJNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

PRABHAT KUNJ: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 17 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
SOCIETY OFFICE and FITNESS CENTREYes0%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership22

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area613 sq m
Land owned byThe promoter, with other names on the file
Named landowners22
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2025
LandownerVillageDistrict
ANANTA ASSOCIATEAndheriMumbai Suburban
JOYCE J. DSOUZAAndheriMumbai Suburban
ELIZABETH BAPTISTAAndheriMumbai Suburban
RUDOLPH L DSOUZAAndheriMumbai Suburban
COLEEN J DSOUZAAndheriMumbai Suburban
CASTELINE C DSOUZAAndheriMumbai Suburban
LAKSHMI CONSTRUCTIONGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban
THE AUGUST CO OP HOUSING SOC LTDAndheriMumbai Suburban
VIJAYA V PINGULKAR AND VIJAY R PINGULKARAndheriMumbai Suburban
ZAHRA ZUBER BAWAZIR (LA-JAYA K AMIN)AndheriMumbai Suburban
ZUBER HYDER BAWAZIR (LA JAYA K AMIN)AndheriMumbai Suburban
SHELU R. DAVE AND DAKSHA R. DAVEAndheriMumbai Suburban
PRAVIN CHHEDAAndheriMumbai Suburban
MEENA K. JAINAndheriMumbai Suburban
MEENA K JAIN AND KHYALILAL G. JAINAndheriMumbai Suburban
KASTURI R. AGARWALAndheriMumbai Suburban
LATE VASANJI GALA (OCCUPANT HEIR SHANTI GALA)AndheriMumbai Suburban
SACHIN ASHOK MHATREAndheriMumbai Suburban
BHARAT C. JAIN, PRAVIN C. JAIN AND RANJANA B. JAINAndheriMumbai Suburban
JAWAHAR CHHEDAAndheriMumbai Suburban
VIJAYA ASSOCIATES (PROP. BIPIN SAVLA)AndheriMumbai Suburban
VIJAY PINGULKARAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai, Building Proposal
Permissible FSI1679.59
Proposed, not sanctioned1,680 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSS HOUSE GRD BASEMENT FLR, NEHRU ROAD, VILE PARLE EAST 400057

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRIYANK ABHAY BHATT
EngineerK.C.SHAH Consultants
Chartered AccountantKRISHNA NAYAK & CO
PartnerRole in project
LAKSHMICONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jan 2025

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Architect Certificate Completion.pdf17 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPATION CERTIFICATE PRABHAT KUNJ.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CERTIFICATE Q1 FY 24-25.pdf23 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Architect Certificate Completion.pdf23 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FOR FY 2023-24.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 FY 23-24 PRABHAT KUNJ.pdf17 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 23-24 PRABHAT KUNJ.pdf4 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CFT Q4.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CFT Q3.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 FY 23-24 FORM 2 ENGINEER CERTIFICATE.pdf9 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 FY 2324.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 FY 23-24 FORM 2 ENGINEER CERTIFICATE.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 FY 23-24 FORM 2 ENGINEER CERTIFICATE.pdf6 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 2021-22 PRABHAT KUNJ.pdf23 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other organisations.pdf18 Nov 2023
Other - FinanceFile: Declaration about other Finance.pdf18 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CFT Q2.pdf11 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 FY 2324.pdf11 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 FY 2324.pdf11 Nov 2023
Proforma of Agreement for saleFile: FORMAT OF AFS PRABHAT KUNJ.pdf11 Nov 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-BOOKED INVENTORY.pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A FY 19-20 DECLARATION.pdf30 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A FY 20-21 DECLARATION.pdf30 Oct 2023
Disclosure of sold/ booked inventoryFile: FORM 2A FY 20-21 DECLARATION.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 FY 17-18 DECLARATION.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 FY 18-19 DECLARATION.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 FY 19-20 DECLARATION.pdf30 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 FY 20-21 DECLARATION.pdf30 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DECLARATION ABOUT OC.pdf30 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: DECLARTION ABOUT SOCIETY FORMATION.pdf30 Oct 2023
Status of ConveyanceFile: DECLARATION ABOUT CONVEYACE.pdf30 Oct 2023
Foreclosure of the ProjectFile: DECLARATION ABOUT FORECLOSURE.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 QTR 1.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 QTR 2.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 QTR 3.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 QTR 4.pdf28 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 form 2 FY 22-23.pdf28 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 form 2 FY 22-23.pdf28 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 form 2 FY 22-23.pdf28 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 form 2 FY 22-23.pdf28 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FOR FY 2021-22.pdf28 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FOR FY 2022-23.pdf28 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FOR 1ST QUARTER FY 22-23.pdf28 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FOR 2ND QUARTER FY 22-23.pdf28 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FOR 3RD QUARTER FY 22-23.pdf28 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FOR 4TH QUARTER FY 22-23.pdf28 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2022-23 PRABHAT KUNJ.pdf28 Sep 2023
OtherFile: LETTER TO MAHARERA.pdf21 Sep 2022
OtherFile: CLARIFICATION ABOUT CTS NU IN TITLE CERTIFICATE.pdf21 Sep 2022
OtherFile: Prabhat Kunj Property Card - New.pdf21 Sep 2022
OtherFile: Prabhat Kunj Property Card 50,50-1 to 11_compressed.pdf21 Sep 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER FORMAT.pdf13 Sep 2022
Proforma of Allotment letterFile: CORRECTED FORMAT OF AFS PRABHAT KUNJ.pdf13 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report pg 1-6 respect to AFS.pdf13 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report pg 7-13 respect to AFS.pdf13 Sep 2022
OtherFile: REPLY TO MAHARERA.pdf13 Sep 2022
Other - TechnicalFile: REPLY TO MAHARERA.pdf8 Sep 2022
Declaration about Commencement CertificateFile: FORM D.pdf30 Aug 2022
Building plan approvalFile: Reply to Maharera.pdf29 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: Reply to Maharera.pdf29 Aug 2022
Other - TechnicalFile: Reply to Maharera.pdf29 Aug 2022
Building plan approvalFile: IOD APROVED DRAWING.pdf23 Aug 2022
Building plan approvalFile: IOD LETTER.pdf23 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD APROVED DRAWING.pdf23 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD LETTER.pdf23 Aug 2022
Building plan approvalFile: 4A FACT SHEET.pdf16 Aug 2022
Building plan approvalFile: 4B SCRUTINY SHEET FOR IOD CC.pdf16 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: 4A FACT SHEET.pdf16 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: 4B SCRUTINY SHEET FOR IOD CC.pdf16 Aug 2022
Declaration in FORM BFile: FORM B.pdf8 Aug 2022
Details of encumbrances concerned to LegalFile: SELF DECLARATION ENCUMBRANCE.pdf1 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report_200243296571_For_Asset_Based_Search_27_07_2022_17_56_55_995.pdf27 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT.pdf26 Jul 2022
Deviation Report with respect to Allotment letterFile: LETTER REG ALLOTMENT LETTER.pdf26 Jul 2022
OtherFile: PRABHAT KUNJ DA IMG_0001.pdf8 Feb 2022
OtherFile: PRABHAT KUNJ DA IMG_0002.pdf8 Feb 2022
OtherFile: PRABHAT KUNJ DA IMG_0003.pdf8 Feb 2022
OtherFile: PRABHAT KUNJ DA IMG_0004.pdf8 Feb 2022
OtherFile: PRABHAT KUNJ DA IMG_0005.pdf8 Feb 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRABHAT KUNJ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANTACRUZ EAST6,700+ in Mumbai Suburban

2 kmPRABHAT KUNJCompleted 158Lapsed / revoked 82Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 381 registered projects within 2 km.

Builder: LAKSHMICONSTRUCTION

LAKSHMICONSTRUCTION has 2 registrations on MahaRERA, including NAVKALA BHARATI and PRABHAT KUNJ. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PRABHAT KUNJ is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRABHAT KUNJ?

The registered promoter entity is LAKSHMICONSTRUCTION, a partnership as per the filing. Its GSTIN 27AACFL3042M1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRABHAT KUNJ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRABHAT KUNJ?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRABHAT KUNJ?

The professionals named in the filing: Architect: PRIYANK ABHAY BHATT; Engineer: K.C.SHAH Consultants; Chartered Accountant: KRISHNA NAYAK & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRABHAT KUNJ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRABHAT KUNJ. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRABHAT KUNJ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.