Home / Browse projects / Pune, Maharashtra / PLOT NO 8, VIVA, PIRANGUT

Completed No litigation declared Residential / Group Housing project

PLOT NO 8, VIVA, PIRANGUT

By PACT REAL ESTATE PRIVATE LIMITED

RG-MH-09558 · RERA P52100002113 · Last updated on MahaRERA portal: 20 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2024Possession promisedregistration recorded completed
72 of 88Construction stages doneacross 8 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

PLOT NO 8, VIVA, PIRANGUT is a Residential / Group Housing project by PACT REAL ESTATE PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100002113 on 31 Jul 2017. The registration is recorded completed; possession was promised by 29 Nov 2024.

At a glance

Project

  • NamePLOT NO 8, VIVA, PIRANGUT
  • TypeResidential / Group Housing
  • Location
    • Paud Road
    • Pirangut
    • Mulshi
    • Pune
    • 411042
  • Pincode411042
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002113
  • ReraGenie IDRG-MH-09558

Builder

  • NamePACT REAL ESTATE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsARVIND DIGAMBAR PRABHU, RAMESH MOHANLAL VALECHA
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017PromisedNov 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion29 Nov 2024
  • Revised completionNone
  • Buildings8 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-36NA20000
A-15, A-16NA20000
A-03, A-04NA20000
A-05, A-06NA20000
A-07, A-08NA20000
A-11, A-12NA20000
A-09, A-10NA20000
A-13, A-14NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

72 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 0%.

A-3682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A-15, A-1682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A-03, A-0482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A-05, A-0682%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A-07, A-0882%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A-11, A-1282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A-09, A-1082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A-13, A-1482%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered14
Open Space1
BuildingClosed/CoveredOpen SpaceTotal
A-36011
A-15, A-16202
A-03, A-04202
A-05, A-06202
A-07, A-08202
A-11, A-12202
A-09, A-10202
A-13, A-14202

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,257 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3260.18
Proposed, not sanctioned3,260 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSuyog Sadan Building, Mahakali Caves Road, Andheri East, Mumbai 400 093

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKapadia Associates Private Limited
ArchitectLaxman Thite
EngineerASCENT STRUCTURAL ENGINEERS PVT LTD CONSULTING STRUCTURAL ENGINEERS
PartnerRole in project
PACT REAL ESTATE PRIVATE LIMITED-

Litigation declared6

CaseCourtStatus
2085 of 2010/2010Civil Judge Senior Dvision PuneMatter is posted for taking steps by the Plaintiff
224 of 2016/2016Additional District CourtMatter is posted for arguments of the Appellant
5964/2021High Court of BombayMatter disposed of as withdrawn
5967/2021High Court of BombayMatter disposed of as withdrawn
185/2020Sub Divisional officer MavalAppeal allowed and matter disposed off
186/2020Sub Divisional officer MavalAppeal allowed and matter disposed off

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Conveyance Declaration Plot 8.pdf20 Jan 2025
OtherFile: NCLT Order.pdf15 Mar 2024
OtherFile: Scheme of Demerger compresseddd.pdf15 Mar 2024
OtherFile: Declaration Plot 8.pdf14 Mar 2024
Status of ConveyanceFile: Conveyance Declaration Plot 8.pdf19 Jan 2024
Status of ConveyanceFile: Conveyance Declaration Plot 8.pdf20 Oct 2023
Status of ConveyanceFile: Plot 8 Conveyance Declaration.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: PLOT 8 SOLD-BOOKED INVENTORY.pdf20 Dec 2022
Disclosure of sold/ booked inventoryFile: PLOT NO 8_20221109132954.pdf17 Nov 2022
Status of ConveyanceFile: Conveyance Declaration Plot 8.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: Plot8- RERA SOLD-BOOKED INVENTORY.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Plot 8_001.pdf12 Sep 2022
Architect’s Certificate on Completion of Project (Form 4)File: Plot 8 Form 4 250822.pdf29 Aug 2022
Architect’s Certificate on Completion of Project (Form 4)File: Self declaration and annex.pdf29 Aug 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Old Plot 8.pdf29 Aug 2022
Disclosure of sold/ booked inventoryFile: Viva Plot no 8.pdf9 Aug 2022
Status of ConveyanceFile: conveyance- plot 8_001.pdf7 Jul 2022
Status of ConveyanceFile: Plot 8 Conveyance Declaration.pdf4 Apr 2022
Disclosure of sold/ booked inventoryFile: PLOT 8 SOLD-BOOKED INVEN_001.pdf21 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Plot B08.pdf7 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate - Plot 8 D-Sd.pdf6 Jan 2022
Status of ConveyanceFile: Conveyance Decln Plot 8.pdf31 Dec 2021
Disclosure of sold/ booked inventoryFile: Plot 8.pdf14 Dec 2021
Disclosure of sold/ booked inventoryFile: PLOT 8 SOLD-BOOKED INVEN_001.pdf15 Nov 2021
Details of encumbrancesFile: CERSAI PACT.pdf11 Oct 2021
Details of encumbrancesFile: Lit Declaration- Plot-8-_001.pdf8 Oct 2021
Declaration about Commencement CertificateFile: C C Declaration - Plot-8_001.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: PLOT 8_001.pdf7 Oct 2021
Certificates of CA (Form 3)File: Final Certificate Plot 8 (1).pdf7 Oct 2021
Status of ConveyanceFile: Plot 8 Conveyance Declaration.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: plot 8_211005141650_0001.pdf5 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate - Plot 8.pdf4 Oct 2021
Certificates of CA (Form 5)File: Form 5 Plot No 8.pdf30 Sep 2021
Disclosure of sold/ booked inventoryFile: PLOT 8_001.pdf6 Sep 2021
Status of ConveyanceFile: Plot 8 Conveyance Declaration.pdf13 Aug 2021
Details of encumbrancesFile: CERSAI - PACT - 09-08-21.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate June 21 Plot 8.pdf12 Aug 2021
Certificates of CA (Form 3)File: CA Cert 30th June 2021 Plot 8.pdf12 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate - Plot 8.pdf10 Aug 2021
Disclosure of sold/ booked inventoryFile: SOLD-BOOKED INVENTRY Plot 8.pdf4 Aug 2021
Details of encumbrancesFile: Plot 8 litigation update 001.pdf17 Jul 2021
Declaration about Commencement CertificateFile: declaration Plot No 8.pdf17 Jul 2021
Disclosure of sold/ booked inventoryFile: Plot 8.pdf8 Jul 2021
Disclosure of sold/ booked inventoryFile: PLOT 8.pdf4 Jun 2021
Proforma of Allotment letterFile: Draft RERA AFS - Under Construction Twin Villas in Plot 8.pdf24 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Pact Real Estate Plot no 8 compressed.pdf30 Sep 2020
Details of Restarting of Construction work post lockdownFile: Plot 8 .pdf21 Jun 2020
Proforma of Allotment letterFile: RERA Draft AFS_Plot 8_compressed.pdf6 Feb 2020
Proforma of Allotment letterFile: RERA Draft AFS_Plot 8_compressed.pdf6 Feb 2020
Proforma of Allotment letterFile: Booking Application Form.pdf6 Nov 2019
Certificates of CA (Form 5)File: Form 5 Plot No 8.pdf30 Sep 2019
Certificates of CA (Form 5)File: Form 5 Plot No 8.pdf30 Sep 2019
OtherFile: Part Occupance certificate A07 A08 A09 A10 A15 A16_compressed.pdf10 Jun 2019
OtherFile: Plot 8 CTO.pdf6 Feb 2019
Certificates of CA (Form 5)File: Pact 8.pdf29 Sep 2018
Proforma of Allotment letterFile: AFS - Constructed Semi - Condominium.pdf6 Sep 2018
OtherFile: OC a3,4,5,6,11,12,13,14.pdf29 Aug 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Plot 8-1.pdf22 Aug 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Plot 8-2.pdf22 Aug 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Plot 8-3.pdf22 Aug 2018
Building plan approvalFile: A-36-Plan.pdf27 Jul 2017
Layout approvalFile: Sanctioned plan.pdf27 Jul 2017
Building plan approvalFile: A-03,04,05,06,11,12,13,14-Plan.pdf27 Jul 2017
Building plan approvalFile: A-07,08,09,10,15,16-Plan.pdf27 Jul 2017
Copy of the legal title reportFile: Title Report 24072017.pdf27 Jul 2017
Details of encumbrancesFile: ENCOMBRANCE 8.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanctioned plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: A-03,04,05,06,11,12,13,14-Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: A-07,08,09,10,15,16-Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: A-36-Plan.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf27 Jul 2017
Declaration in FORM BFile: Affidavit Form B.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engr Cert Plot 8.pdf27 Jul 2017
Certificates of CA (Form 3)File: Plot-8 CA Certificate.pdf27 Jul 2017
Proforma of Allotment letterFile: Booking Form and Agreement for sale.pdf27 Jul 2017
Proforma of Allotment letterFile: RERA AFS - Under Construction Twin Villas in Plot 8.pdf27 Jul 2017
PAN CardFile: PACT REAL ESTATE PRIVATE LIMITED PAN CARD.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Plot No 8.pdf25 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PLOT NO 7 VIVA PIRANGUTNew Gat No 273A Plot No 7 old Gat no 541 Part at village Pirangut Taluka Mulshi District Pune32CompletedDec 2022Dec 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PLOT NO 8, VIVA, PIRANGUT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pirangut13,700+ in Pune

2 kmPLOT NO 8, VIVA, PIRANGUCompleted 162Lapsed / revoked 119Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: PACT REAL ESTATE PRIVATE LIMITED

PACT REAL ESTATE PRIVATE LIMITED has 4 registrations on MahaRERA, including PLOT NO.7, VIVA, PIRANGUT and PLOT NO 8, VIVA, PIRANGUT. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PLOT NO 8, VIVA, PIRANGUT is delayed beyond 29 Nov 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PLOT NO 8, VIVA, PIRANGUT?

The registered promoter entity is PACT REAL ESTATE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PLOT NO 8, VIVA, PIRANGUT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PLOT NO 8, VIVA, PIRANGUT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PLOT NO 8, VIVA, PIRANGUT?

The professionals named in the filing: Architect: Kapadia Associates Private Limited; Architect: Laxman Thite; Engineer: ASCENT STRUCTURAL ENGINEERS PVT LTD CONSULTING STRUCTURAL ENGINEERS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PLOT NO 8, VIVA, PIRANGUT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PLOT NO 8, VIVA, PIRANGUT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PLOT NO 8, VIVA, PIRANGUT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.