ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / PLATINUM CITYLIGHTS

Registered No litigation declared Others project

PLATINUM CITYLIGHTS

By GLOBAL PROPERTIES

RG-MH-65859 · RERA P52100054911 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 30.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 95%
121 of 240Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 124 documents Report an error

PLATINUM CITYLIGHTS is a Others project by GLOBAL PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100054911 on 15 Feb 2024. Possession is promised by 31 Dec 2027. 119 of the 240 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NamePLATINUM CITYLIGHTS
  • TypeOthers
  • Location
    • NEAR SWAMI SAMARTH SEVA KENDRA
    • KUDALE VASTI
    • MOSHI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054911
  • ReraGenie IDRG-MH-65859

Builder

  • NameGLOBAL PROPERTIES
  • Entity typePartnership
  • PartnersBHARAT LALARAM CHOUDHARY, MAHENDRAKUMAR POONARAMJI CHOUDHARY, BHURARAM MEGHAJI CHOUDHARY, MAHESH DUDARAM CHOUDHARY, KANARAM VELARAM CHOUDHARY, BABUULAL KUPARAM CHAUDRY, SANTOSH LALARAM CHOUDHARY, SHANKARLAL CHATRAJI CHOUDHARY, PRAKASH RAMLAL CHOUDHARY, PRAKASHRAM DEEPARAM PARIHAR
  • Other registrations4 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed124 files

Current status

50%119 of 240 units booked
68.2%Work done, per cost certificate

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA191648048
WING BNA19161100110
WING GNA1918641882

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

WING A55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
WING B53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
WING G52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed374

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots374
Closed/Covered267
Open Space107
BuildingClosed/CoveredOpen SpaceTotal
WING A493584
WING B10470174
WING G1142116

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,100 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on12 Jul 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI19928.16
Proposed, not sanctioned19,928 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 2 3 4 GROUND FLOOR TIRUPATI KASHIGANGA S NO 16 31 DHANORI PUNE 411015
Estimated costRs 61.66 cr
Cost incurredRs 42.02 cr
Work done68.16%
BuildingWingEstimatedIncurred
WING BNARs 22.55 crRs 14.20 cr
WING GNARs 19.87 crRs 12.73 cr
WING ANARs 15.23 crRs 13.11 cr
-NARs 4.00 crRs 1.98 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYW ARCHITECTS
EngineerSAGAR PATIL
Chartered AccountantVIJAY JADHAV
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
GLOBAL PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed124

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf16 Apr 2026
Withdrawal Update Form 3File: Form 3_compressed.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1_compressed.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf19 Jan 2026
Layout approvalFile: Sanction Plan_compressed.pdf3 Dec 2025
Building plan approvalFile: Building Plan.pdf3 Dec 2025
Building plan approvalFile: Building Plan 01.pdf3 Dec 2025
Building plan approvalFile: Building Plan 02.pdf3 Dec 2025
Building plan approvalFile: Building Plan 03.pdf3 Dec 2025
Building plan approvalFile: Building Plan 04_compressed.pdf3 Dec 2025
Building plan approvalFile: Building Plan 05.pdf3 Dec 2025
Building plan approvalFile: Building Plan 06.pdf3 Dec 2025
Building plan approvalFile: Building Plan 07.pdf3 Dec 2025
Building plan approvalFile: Building Plan 08.pdf3 Dec 2025
Building plan approvalFile: Building Plan 09.pdf3 Dec 2025
Building plan approvalFile: Building Plan 10.pdf3 Dec 2025
Building plan approvalFile: Building Plan 11.pdf3 Dec 2025
Building plan approvalFile: Building Plan 12.pdf3 Dec 2025
Building plan approvalFile: Building Plan 13.pdf3 Dec 2025
Building plan approvalFile: Building Plan 14.pdf3 Dec 2025
Building plan approvalFile: Building Plan 15.pdf3 Dec 2025
Building plan approvalFile: Building Plan 16.pdf3 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf20 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf20 Oct 2025
Withdrawal Update Form 1File: Form 1_compressed.pdf16 Oct 2025
Withdrawal Update Form 2File: Form 2_compressed.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 Final.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf1 Oct 2025
Form 1File: Form 1 Final Uploaded.pdf19 Jul 2025
Form 2File: FORM 2 Final.pdf19 Jul 2025
Form 3File: Form 3 Final_compressed.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular Final.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final Uploaded.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Final.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Circular Final.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Upload_compressed.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 31 March 2024_compressed.pdf13 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final_compressed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Final.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Circular Final.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form - 5 Upload.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - FORM 1 FINAL.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNER CERTIFICATE - FORM 2 FINAL.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory - Q4 (23-24).pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory - Q1 (24-25).pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory - Q2 (24-25)_compressed.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - FORM 3.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q2 24-25).pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FINAL ENGINEER CERTIFICATE - FORM 2.pdf20 Oct 2024
Details of encumbrances concerned to FinanceFile: Upload mortgage.pdf6 Jun 2024
Details of encumbrances concerned to LegalFile: Upload mortgage.pdf6 Jun 2024
Other - TechnicalFile: Plot Declaration Order 50 platinum.pdf9 Feb 2024
Other - TechnicalFile: Layout Plan to highlight.pdf3 Feb 2024
Other - TechnicalFile: 2.pdf3 Feb 2024
Other - TechnicalFile: 3.pdf3 Feb 2024
Other - TechnicalFile: SANC 4.pdf3 Feb 2024
Other - TechnicalFile: SANC 5.pdf3 Feb 2024
Other - TechnicalFile: SANC 6.pdf3 Feb 2024
Other - TechnicalFile: SANC 7.pdf3 Feb 2024
Other - TechnicalFile: SANC 8.pdf3 Feb 2024
Other - TechnicalFile: SANC 9.pdf3 Feb 2024
Other - TechnicalFile: SANC 10.pdf3 Feb 2024
Other - TechnicalFile: SANC 15.pdf3 Feb 2024
Other - TechnicalFile: SANC 16.pdf3 Feb 2024
Building plan approvalFile: SANC 6_rotated.pdf24 Jan 2024
Building plan approvalFile: SANC 10_rotated.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: SANC 6_rotated.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: SANC 10_rotated.pdf24 Jan 2024
Other - TechnicalFile: SS.pdf16 Jan 2024
Proforma of Agreement for saleFile: Agreement to sale draft.pdf10 Jan 2024
Deviation Report with respect to model copy of AgreementFile: NO deviation AFS.pdf10 Jan 2024
Layout approvalFile: Layout Plan highlighted.pdf9 Jan 2024

How this compares with Pune

50%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PLATINUM CITYLIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOSHI13,700+ in Pune

2 kmPLATINUM CITYLIGHTSCompleted 51Lapsed / revoked 25Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 155 registered projects within 2 km.

Builder: GLOBAL PROPERTIES

GLOBAL PROPERTIES has 5 registrations on MahaRERA, including MORELLA and GLOBAL SERENITY- D BUILDING. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PLATINUM CITYLIGHTS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PLATINUM CITYLIGHTS?

The registered promoter entity is GLOBAL PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PLATINUM CITYLIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PLATINUM CITYLIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PLATINUM CITYLIGHTS?

The professionals named in the filing: Architect: YW ARCHITECTS; Engineer: SAGAR PATIL; Chartered Accountant: VIJAY JADHAV; Chartered Accountant: PGMJ & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PLATINUM CITYLIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PLATINUM CITYLIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PLATINUM CITYLIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.