Registered No litigation declared Residential / Group Housing project

PINNACLE

By VAIBHAV PROPERTIES PRIVATE LIMITED

RG-MH-61282 · RERA P51900049503 · Last updated on MahaRERA portal: 22 Aug 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 19 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2027Possession promisedmoved 19 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
54 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

PINNACLE is a Residential / Group Housing project by VAIBHAV PROPERTIES PRIVATE LIMITED in SION, 400022, registered with MahaRERA as P51900049503 on 15 Feb 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 19 months from the original filing. 4 of the 58 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NamePINNACLE
  • TypeResidential / Group Housing
  • Location
    • SION FORT
    • SION
    • 400022
  • Pincode400022
  • RERA no.P51900049503
  • ReraGenie IDRG-MH-61282

Builder

  • NameVAIBHAV PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorABHAYRAJSINGH KOHLI

Key dates

this monthRegisteredFeb 2023First promiseAug 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Aug 2025)
  • Buildings1 building record
  • Documents filed50 files

Current status

7%4 of 58 units booked
42.9%Work done, per cost certificate

Figures as on 22 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PinnacleNA171658058

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Pinnacle: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,062 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3870.54
Proposed, not sanctioned2,943 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDADAR EAST MUMBAI 400014
Estimated costRs 24.00 cr
Cost incurredRs 10.29 cr
Work done42.86%
BuildingWingEstimatedIncurred
PinnacleNARs 24.00 crRs 10.29 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN NEXUS STUDIO
ArchitectDESIGNEXUS ARCHITECTURAL STUDIO
EngineerAniket Milind Aher
EngineerCLINT PATRICK DOS SANTOS
EngineerJACOB BASTYAW DSOUZA
Chartered AccountantTamhane & Mehta Chartered Accountants
Chartered AccountantNEHALI DHAVAL DOSHI
PartnerRole in project
VAIBHAV PROPERTIES PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22082502417Aug 2025 → Mar 2027

Reason as filed by the promoter1. Structural Redesign or Change in Planning Based on technical site evaluations and safety audits, certain aspects of the structural layout and MEP systems had to be redesigned to meet updated technical standards and ensure long-term safety and quality. The plinth also had to be redone as per the new amended plans and various structural changes were done, the work that was done earlier was also demolished. 2. Delay in Statutory Clearances/Utility Approvals The redesigning and revised approvals of the plans had to be procured from BMC, and other government authorities which led to a delay in t

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf22 Aug 2025
Withdrawal Update Form 2File: PINNCEL FORM 2 (2).pdf22 Aug 2025
Withdrawal Update Form 3File: ca form 3 june 25.pdf22 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Vaibhav properties - dec 24 (1).pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf31 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER - PINNACLE (july 23 to sept 23) SING.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER - PINNACLE (oct 23 to dec 23) SING.pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 23 Q4.pdf14 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 23 Q3.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 23 Q4.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Vaibhav properties - Sep-23.pdf10 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 23 Q4.pdf10 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 23 Q4.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certi Rera 26-09-23 Sign.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Form_2 - PINNACLE (26-09-23) (1).pdf5 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Vaibhav properties - June 23( Sandeep Jadhwani.pdf5 Oct 2023
Proforma of Agreement for saleFile: RERA Agreement clean.pdf8 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Diviation 03022023_1-20.pdf8 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Diviation 03022023_21-end.pdf8 Feb 2023
PAN CardFile: VAIBHAV PROTO.pdf11 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM-3.pdf7 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A dislcosure vaibhav.pdf7 Jan 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER RERA SION PINNACLE.pdf7 Jan 2023
Building plan approvalFile: Shanti Niketan _IOD_signed.pdf6 Jan 2023
Layout approvalFile: Shanti Niketan IOD Drawing_1-1.pdf6 Jan 2023
Layout approvalFile: Shanti Niketan IOD Drawing_2-2.pdf6 Jan 2023
Layout approvalFile: Shanti Niketan IOD Drawing_3-3.pdf6 Jan 2023
Layout approvalFile: Shanti Niketan IOD Drawing_4-end.pdf6 Jan 2023
Copy of the legal title reportFile: RERA TITLE.pdf6 Jan 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance ABSK.pdf6 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumbrance ABSK.pdf6 Jan 2023
Copy of Layout Approval (in case of layout)File: Shanti Niketan IOD Drawing_1-1.pdf6 Jan 2023
Copy of Layout Approval (in case of layout)File: Shanti Niketan IOD Drawing_2-2.pdf6 Jan 2023
Copy of Layout Approval (in case of layout)File: Shanti Niketan IOD Drawing_3-3.pdf6 Jan 2023
Copy of Layout Approval (in case of layout)File: Shanti Niketan IOD Drawing_4-end.pdf6 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Shanti Niketan _IOD_signed.pdf6 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2322197_FirstCC_signed.pdf6 Jan 2023
Declaration about Commencement CertificateFile: Declaration Commencement Certi.pdf6 Jan 2023
Declaration in FORM BFile: Form B promtoer.pdf6 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Sion Shantiniketan RERA.pdf6 Jan 2023
CERSAI detailsFile: Cersai Declaration.pdf6 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account RERA.pdf6 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter Rera.pdf6 Jan 2023

Keep PINNACLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SION

Builder: VAIBHAV PROPERTIES PRIVATE LIMITED

VAIBHAV PROPERTIES PRIVATE LIMITED has 1 registration on MahaRERA, including PINNACLE. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if PINNACLE is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PINNACLE?

The registered promoter entity is VAIBHAV PROPERTIES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PINNACLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PINNACLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PINNACLE?

The professionals named in the filing: Architect: DESIGN NEXUS STUDIO; Architect: DESIGNEXUS ARCHITECTURAL STUDIO; Engineer: Aniket Milind Aher; Engineer: CLINT PATRICK DOS SANTOS; Engineer: JACOB BASTYAW DSOUZA; Chartered Accountant: Tamhane & Mehta Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PINNACLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PINNACLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PINNACLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.