ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Rural, Karnataka / PINNACLE

Registration approved Residential/Group Housing project

PINNACLE

By Landstar Homes

RG-KA-99204 · RERA PRM/KA/RERA/1250/304/PR/171215/000699

Source: official RERA Karnataka filing

Red flags

  • 20 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2019Possession promisedmoved 12 months from the original
20Complaints at RERA Karnatakaon this registration
Jump to the 55 documents Report an error

PINNACLE is a Residential/Group Housing project by Landstar Homes in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/171215/000699 on 15 Dec 2017. Possession is promised by 30 Mar 2019. The completion date has moved by 12 months from the original filing. 20 complaints are on record with the regulator.

At a glance

Project

  • NamePINNACLE
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1250/304/PR/171215/000699
  • ReraGenie IDRG-KA-99204

Builder

  • NameLandstar Homes
  • Entity typePartnership Firm
  • Authorized SignatoryUma Maheshwar Reddy
  • OthersLakshmi Rangaswamy

Key dates

this monthRegisteredDec 2017First promiseMar 2018Revised toMar 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Dec 2017
  • Promised completion30 Mar 2019
  • Revised completionRevised to 30 Mar 2019 (originally 30 Mar 2018)
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PINNACLE---1450145

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,694 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 25.00 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1250/304/PR/220608/000699Mar 2018 → Mar 2019

Reason as filed by the promoterFinancial crunch

Complaints filed with RERA Karnataka20

Case no.ComplainantRespondentFiled
CMP/210318/0007794-Landstar Homes18/03/2021
00674/2023-Landstar Homes05/05/2023
00675/2023-Landstar Homes05/05/2023
00676/2023-Landstar Homes05/05/2023
00940/2023-Landstar Homes21/06/2023
00971/2023-Landstar Homes27/06/2023
00984/2023-Landstar Homes27/06/2023
01100/2023-Landstar Homes15/07/2023
01101/2023-Landstar Homes15/07/2023
01102/2023-Landstar Homes15/07/2023
01194/2023-Landstar Homes27/07/2023
01195/2023-Landstar Homes27/07/2023
01202/2023-Landstar Homes01/08/2023
01205/2023-Landstar Homes02/08/2023
01461/2023-Landstar Homes20/09/2023
00198/2024-Landstar Homes16/02/2024
00344/2024-Landstar Homes01/04/2024
00413/2024-Landstar Homes25/04/2024
00920/2024-Landstar Homes21/09/2024
01307/2025-Landstar Homes28/10/2025

Documents filed55

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/171215/000699 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: FIRM REG - 330.pdf-
Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT S CERTIFICATE FOR STATUS OF WORK AS ON DATE.jpg-
Engineer Certificate for Work Completion Schedule till DateFile: ENGINEER S CERTIFICATE FOR STATUS OF WORK AS ON DATE.jpg-
CA Certificate for Funds UtilizationFile: CA CERTIFICATE FOR FUND UTILIZATION.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT S CERTIFICATE FOR PENDING WORK AS ON DATE.jpg-
Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER S CERTIFICATE FOR PENDING WORK AS ON DATE.jpg-
CA Certificate for Funds required for Project CompletionFile: CA CERTIFICATE FOR FUNDS REQUIRED.pdf-
AffidavitFile: Form B.jpg-
Latest Encumbrance CertificateFile: EC.jpeg-
Consent letter from 2/3rd of AllotteesFile: Customer Sign.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Bank Account Details.pdf-
Document 2File: CC.pdf-
Document 3File: Plan Copys Pinnacle.pdf-
Document 4File: 2Third Consent letter.pdf-
Document 5File: Plan Copys Pinnacle.pdf-
Document 6File: Bank Account Details.pdf-
Document 7File: CC.pdf-
Document 8File: 2Third Consent letter.pdf-
Plan-
Plan-
Plan-
Plan-
Plan-
Sale Deed-Pinnacle-
Plan-
Plan-
Plan-
Plan-
Plan-
Plan-
Plan-
MR-Pinnacle-
CC-Pinnacle-
Balance Sheet 2015 - 2016File: Balance Sheet 2016 2017.pdf-
Balance Sheet 2014 - 2015File: Balance sheet-2015-2016.pdf-
Balance Sheet 2013 - 2014File: Balance Sheet-2014-2015.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit & Loss 2016 2017.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit &Loss acc-2015-2016.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Profic&Loss AC-2014-2015.pdf-
Director's Report 2015 - 2016File: Directors Report.pdf-
Director's Report 2014 - 2015File: Directors Report.pdf-
Director's Report 2013 - 2014File: Directors Report.pdf-
Cash Flow Statement 2015 - 2016File: Profit & Loss.pdf-
Cash Flow Statement 2014 - 2015File: Profit & Loss.pdf-
Auditor's Report 2015 - 2016File: Auditor Report.pdf-
Auditor's Report 2014 - 2015File: Auditor Report.pdf-
Auditor's Report 2013 - 2014File: Auditor Report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 2015-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ITR 2014-15.pdf-
Plan-
Prospectus/BrochureFile: jpg2pdf.pdf-
Advertisement Copy 1File: Add Final.jpg-
Tower Excel SheetFile: RERA-Excel.xlsx-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one moved by 12 months
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep PINNACLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

Builder: Landstar Homes

Landstar Homes has 1 registration on RERA Karnataka, including PINNACLE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if PINNACLE is delayed beyond 30 Mar 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PINNACLE?

The registered promoter entity is Landstar Homes, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PINNACLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PINNACLE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in PINNACLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PINNACLE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PINNACLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.