Home / Browse projects / Mumbai Suburban, Maharashtra / PEARL ORCHID

Registered No litigation declared Others project

PEARL ORCHID

By CHANDIWALA ENTERPRISES PRIVATE LIMITED

RG-MH-78951 · RERA P51800050086 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
70 of 70Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

PEARL ORCHID is a Others project by CHANDIWALA ENTERPRISES PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050086 on 15 Mar 2023. Possession is promised by 31 Dec 2026. 0 of the 70 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NamePEARL ORCHID
  • TypeOthers
  • Location
    • S V ROAD
    • JOGESHWARI WEST
    • Oshiwara
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • RERA no.P51800050086
  • ReraGenie IDRG-MH-78951

Builder

  • NameCHANDIWALA ENTERPRISES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorANIS HUMAYUN CHANDIWALA
  • Other registrations3 more →

Key dates

this monthRegisteredMar 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Mar 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed116 files

Current status

0%0 of 70 units booked
91.7%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PEARL ORCHIDNA1918502070

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

PEARL ORCHID: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,011 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Jul 2025
LandownerVillageDistrict
SAMSHER HASAN KHAN DALWAIOshiwaraMumbai Suburban
AMANULLAH HASAN KHAN DALWAIOshiwaraMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI4833.19
Proposed, not sanctioned4,040 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch11, VITHAL NAGAR CO-OP HSG. SOCIETY., 10TH ROAD, JVPD SCHEME, VILE PARLE WEST, MUMBAI-400049
Estimated costRs 22.15 cr
Cost incurredRs 20.30 cr
Work done91.65%
BuildingWingEstimatedIncurred
PEARL ORCHIDNARs 18.45 crRs 18.45 cr
-NARs 3.70 crRs 1.85 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHISH SOLANKI
EngineerUJAS LIMBANI
EngineerALTAF HINGORA
Chartered AccountantSANDEEP SHAMBHUDYAL KUMAVAT
Chartered Accountantkumavatandcompany
Chartered AccountantBHUPENDRA JAGDISHWALA
PartnerRole in project
CHANDIWALA ENTERPRISES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form_1_of_RERA_31032026.pdf28 Apr 2026
Withdrawal Update Form 1File: Form_1_of_RERA_31032026.pdf28 Apr 2026
Withdrawal Update Form 2File: Eng Cert 310326.pdf28 Apr 2026
Withdrawal Update Form 2File: Eng Cert 310326.pdf28 Apr 2026
Withdrawal Update Form 3File: PearlOrchid31032026.pdf28 Apr 2026
Withdrawal Update Form 3File: PearlOrchid31032026.pdf28 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A Orchid 31032025.pdf22 Apr 2026
Withdrawal Update Form 1File: Form_1_of_RERA_31122025.pdf14 Feb 2026
Withdrawal Update Form 2File: Eng Cert 311225.pdf14 Feb 2026
Withdrawal Update Form 3File: Pearl_Orchid___Signed__31-12-2025.pdf14 Feb 2026
Form 2A (FY 2022-2023)File: Form 2A Orchid 31032023.pdf22 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A Orchid 31032024.pdf22 Jan 2026
Withdrawal Update Form 1File: Form_1_of_RERA_30092025.pdf6 Dec 2025
Withdrawal Update Form 2File: Eng Cert 300925.pdf6 Dec 2025
Withdrawal Update Form 3File: Pearl_Orchid_Signed_30-09-2025.pdf6 Dec 2025
Withdrawal Update Form 1File: Form1.pdf29 Nov 2025
Withdrawal Update Form 2File: Eng Cert 300625.pdf29 Nov 2025
Withdrawal Update Form 3File: Pearl_Orchid_Signed_30_June_25.pdf29 Nov 2025
Form 5 (FY 2022-2023)File: Audit report.pdf29 Nov 2025
Form 5 (FY 2023-2024)File: Form 5 2324.pdf29 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Pearl Orchid 2425.pdf29 Nov 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Orchid - 31032025.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: CEPL STOCK SUMMARY.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl_Orchid_Signed_31_Mar_25.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_03022025.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_26022025.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_31032025 po.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Orchid 27022025.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (14)_compressed.pdf28 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Orchid Mar 25_compressed.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert 1.pdf28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT 2018.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anneure A.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_13012025 po.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Orchid Engineers Certificate 31122024.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Peal_Orchid_Signed_14012025.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Peal Orchid_signed_31122024.pdf9 Jan 2025
Disclosure of sold/ booked inventoryFile: sTOCK p oRICHID.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_31122024 oRCHID.pdf4 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Orchid Engineers Certificate 17122024.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_17122024.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P Orchid 171224_compressed.pdf20 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CEPL ORCHID.pdf30 Nov 2024
Disclosure of sold/ booked inventoryFile: Stock P Orchid 300924.pdf25 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Orchid Engineers Certificate 11112024.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_05102024 Orchid.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_08112024 Orchid.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert P Orchid 111124_compressed.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Pearl Orchid 081024.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_21082024.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_300924.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert P Orchid 081024_compressed.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert P Orchid 210824_compressed.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert P Orchid 190724_compressed (1).pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER 210824.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Eng Cert 190724.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert 190724.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_190724.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Annexure - C Orchid.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_30062024 (2).pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: CEPL - STOCK.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 180624 Orchid.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SCAN 180624.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form109052024.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 09052024.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert 090524.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Pearl Orchid Architect Cer 240324.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer Cer 250324.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certificate 250324.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Pearl Orchid Architect Cer 311223.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Pearl Orchid Architect Cer 100224.pdf21 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Emgin Cer PO.pdf19 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Certificate 110224.pdf13 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Paradise I comp building .pdf6 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Audit report.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer Cer 281223.pdf2 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate 281223.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pearl Orchid Architect Cer 300323.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pearl Orchid Architect Cer 300623.pdf28 Dec 2023

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PEARL ORCHID on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI WEST6,700+ in Mumbai Suburban

Builder: CHANDIWALA ENTERPRISES PRIVATE LIMITED

CHANDIWALA ENTERPRISES PRIVATE LIMITED has 4 registrations on MahaRERA, including PEARL ORCHID and PEARL BLOSSOM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PEARL ORCHID is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PEARL ORCHID?

The registered promoter entity is CHANDIWALA ENTERPRISES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PEARL ORCHID?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PEARL ORCHID?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PEARL ORCHID?

The professionals named in the filing: Architect: ASHISH SOLANKI; Engineer: UJAS LIMBANI; Engineer: ALTAF HINGORA; Chartered Accountant: SANDEEP SHAMBHUDYAL KUMAVAT; Chartered Accountant: kumavatandcompany; Chartered Accountant: BHUPENDRA JAGDISHWALA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PEARL ORCHID?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PEARL ORCHID. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PEARL ORCHID to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.