Red flags

  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Parmarth Niketan - Redevelopment of Mani Bhuvan is a Residential / Group Housing project by J V Constructions & Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001745 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. The completion date has moved by 42 months from the original filing.

At a glance

Project

  • NameParmarth Niketan - Redevelopment of Mani Bhuvan
  • TypeResidential / Group Housing
  • Location
    • Road no. 7
    • Daulat Nagar
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001745
  • ReraGenie IDRG-MH-20265

Builder

  • NameJ V Constructions & Developers
  • Entity typePartnership
  • PartnersJayantilal Arjanbhai Patel, Vasant Anandji Patel
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Parmarth Niketan - Redevelopment of Mani BhuvanNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Parmarth Niketan - Redevelopment of Mani Bhuvan: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered18
Open Space6

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area805 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2713.0
Proposed, not sanctioned1,411 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKaustubh Park Mandpeshwar Road Borivali West Mumbai 400103

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA R MEHTA & ASSOCIATES
PartnerRole in project
J V Constructions & Developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800003705Dec 2019 → Apr 2020

Reason as filed by the promoterCommencement Certificate recently received on 05/03/2019 and therefore it is not possible for us to complete the project on or before 31/12/2019. 100 % consent of the allottees is attached herewith as only 2 units are agreed to be sold. Commencement certificate is also attached.

EXT51800006283Dec 2019 → Dec 2022

Reason as filed by the promoterInitially the proposed date of completion of the project was 31/12/2019. Subsequently an extension for 1 year under Section 6 of RERA was applied to which the RERA Authority granted the extension. Later on, as the commencement certificate in the said Project was received on 05.09/2019, a further extension under Section 7(3) of RERA till 31/12/2022 was applied for by the Promoter bearing Application No.EXT51800003705. However, such extension was not granted for the reason that the consent of 2/3rd allottees in the project was not taken. As only two new flats in the project were sold, erroneousl

EXT51800001707Dec 2019 → Apr 2020

Reason as filed by the promoterC.C is not granted by MCGM due to non compliance of some of the IOD conditions and that there are 3 Tenants who have field suit in the court in the year 2015. We have given undertaking / Indemnity Bond to MCGM and the amended plans were approved as per DCPR 2034 on 23/01/2019 and C.C granted on 05/03/2019.

Litigation declared12

CaseCourtStatus
343/2015City Civil Court Goregaon DindoshiHearing on Notice of Motion
344/2015City Civil Court Goregaon DindoshiHearing on Notice of Motion
345/2015City Civil Court Goregaon DindoshiHearing on Notice of Motion
152/2010Small Cause BandraEvidence
153/2010Small Cause BandraEvidence
154/2010Small Cause BandraEvidence
83/2010Small Cause BandraEvidence
84/2010Small Cause BandraEvidence
85/2010Small Cause BandraEvidence
539/2013Small Cause BandraEvidence
540/2013Small Cause BandraEvidence
541/2013Small Cause BandraEvidence

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Sep 2021

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FOR PARMARTH NIKETAN ARCHITECT CERTIFICATE - Q2 2020-2021.pdf15 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FOR PARMARTH NIKETAN ARCHITECT CERTIFICATE - Q3 2020-2021.pdf15 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FOR PARMARTH NIKETAN ARCHITECT CERTIFICATE - Q4 2020-2021.pdf15 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Form 2 - PARMARTH NIKETAN - Q2 - 2020-2021.pdf15 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Form 2 - PARMARTH NIKETAN - Q3 - 2020-2021.pdf15 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Form 2 - PARMARTH NIKETAN - Q4 - 2020-2021.pdf15 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 PARMARTH NIKETAN - F Y 2019-2020.pdf17 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: JVCD - Form 5 Annuarl Report F Y 2020-2021.pdf17 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: Completion Certificate - A R Mehta - 09-09-2021- PN.pdf17 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers FORM 2A - Sept 2020 - Parmarth Niketan.pdf3 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers FORM 2A - June 2020 - Parmarth Niketan.pdf3 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - PARMARTH NIKETAN - 10-04-2021.pdf3 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - PARMARTH NIKETAN - 23-04-2021.pdf3 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Parmarth Niketan Society Registration Certificate 07-07-2021.pdf3 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers FORM 2A - DEC 2020 - Parmarth Niketan.pdf8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers FORM 2A - MAR 2021 - Parmarth Niketan.pdf8 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - ARCHITECT CERTIFICATE - PARMARTH NIKETAN - Q4 2019-2020.pdf23 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FOR PARMARTH NIKETAN ARCHITECT CERTIFICATE - Q1 2020-2021.pdf23 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Form 2 - PARMARTH NIKETAN - Q4 - 2019-2020.pdf23 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Form 2 - PARMARTH NIKETAN - Q1 - 2020-2021.pdf23 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers FORM 2A - Mar 2020 - Parmarth Niketan.pdf23 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers FORM 2A - June 2020 - Parmarth Niketan.pdf23 Sep 2020
Certificates of CA (Form 3)File: Form 3-CA- Parmarth Niketan Certificate- Q4 - 2019-2020.pdf23 Sep 2020
Certificates of CA (Form 3)File: JVCD RERA CA Certificate Q1 FY 2020-21_compressed.pdf23 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q3 - 2019-2020.pdf6 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Form 2 - PARMARTH NIKETAN - Q3 - 2019-2020.pdf6 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers FORM 2A - Dec 2019 - Parmarth Niketan.pdf6 Feb 2020
Certificates of CA (Form 3)File: Form-3-CA Certificate-Parmarth Niketan - Q3 - 2019-2020.pdf6 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A1.pdf30 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A.pdf20 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A1.pdf20 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 1819.pdf20 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q2 - 2019-2020.pdf8 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - PARMARTH NIKETAN - Q2 - 2019-2020.pdf8 Nov 2019
Certificates of CA (Form 3)File: CA Certificate - PARMARTH NIKETAN Q2 - 2019-2020_compressed.pdf8 Nov 2019
Certificates of CA (Form 5)File: FORM NO 5 - Parmarth Niketan.pdf7 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: PARMARTH NIKETAN CC.pdf30 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q1 - 2019-2020.pdf30 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - PARMARTH NIKETAN - Q1 - 2019-2020.pdf30 Jul 2019
Certificates of CA (Form 3)File: CA Certificate - PARMARTH NIKETAN Q1 - 2019-2020_compressed.pdf30 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: CC - PARMARTH NIKETAN.pdf21 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q4 - 2018-2019.pdf2 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - PARMARTH NIKETAN - Q4 - 2018-2019.pdf2 May 2019
Certificates of CA (Form 3)File: CA Certificate - PARMARTH NIKETAN Q4 - 2018-2019_compressed.pdf2 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q3 - 2018-2019.pdf9 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - PARMARTH NIKETAN Q3 - 2018-2019-compressed.pdf9 Feb 2019
Certificates of CA (Form 3)File: CA Certificate - PARMARTH NIKETAN Q3 - 2018-2019-compressed.pdf9 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q2 - 2018-2019.pdf20 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - PARMARTH NIKETAN Q2 - 2018-2019.pdf20 Oct 2018
Certificates of CA (Form 3)File: CA Certificate - PARMARTH NIKETAN Q2 - 2018-2019 - compressed.pdf20 Oct 2018
Certificates of CA (Form 5)File: Form 5 - Parmarth Niketan - 2017-2018.pdf8 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q1 - 2018-2019.pdf17 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - PARMARTH NIKETAN Q1 - 2018-2019.pdf17 Jul 2018
Certificates of CA (Form 3)File: CA Certificate - PARMARTH NIKETAN Q1 - 2018-2019-compressed.pdf17 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q4.pdf18 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - PARMARTH NIKETAN Q4.pdf18 Apr 2018
Certificates of CA (Form 3)File: CA Certificate Q 4 Mani Bhuvan Compressed.pdf18 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q3.pdf22 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - PARMARTH NIKETAN Q3.pdf22 Jan 2018
Certificates of CA (Form 3)File: CA Certificate Q3 Parmarth Nikitan.pdf22 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - PARMARTH NIKETAN Q2.pdf16 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE - PARMARTH NIKETAN Q2.pdf16 Oct 2017
Certificates of CA (Form 3)File: CA CERTIFICATE - PARMARTH NIKETAN Q2.pdf16 Oct 2017
Layout approvalFile: 4 IOD PLANs.pdf24 Jul 2017
Building plan approvalFile: 4 IOD Letter.pdf24 Jul 2017
Building plan approvalFile: 4 IOD PLANs.pdf24 Jul 2017
PAN CardFile: JVCD - PAN Card.pdf24 Jul 2017
Copy of the legal title reportFile: 2 TITLE CERTIFICATE - Parmarth Niketan.pdf24 Jul 2017
Details of encumbrancesFile: 3 DETAILS OF ENCUMBRANCE - PARMARTH NIKETAN.pdf24 Jul 2017
Copy of Layout Approval (in case of layout)File: 4 IOD PLANs.pdf24 Jul 2017
Building Plan Approval (IOD)File: 4 IOD Letter.pdf24 Jul 2017
Building Plan Approval (IOD)File: 4 IOD PLANs.pdf24 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 12 BMC - CC DENIAL LETTER - PARMARTH NIKETAN.pdf24 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 12 Self Declaration for CC - PARMARTH NIKETAN.pdf24 Jul 2017
Declaration in FORM BFile: Form B AFFIDAVIT - PARMARTH NIKETAN.pdf24 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 ARCHITECT CERTIFICATE - PARMARTH NIKETAN.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 ENGINEER'S CERTIFICATE - PARMARTH NIKETAN.pdf24 Jul 2017
Certificates of CA (Form 3)File: 9 CA FORM 3 JVCD - 22-07-2017.pdf24 Jul 2017
Proforma of Allotment letterFile: 5 Agreement under RERA Act Mani Bhuvan - Parmarth niketan.pdf24 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Ganga Vihar CHS LtdRoad No. 10 Daulat Nagar Borivali East Mumbai 40006618CompletedMay 2017May 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 42 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Parmarth Niketan - Redevelopment of Mani Bhu on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Daulat Nagar6,700+ in Mumbai Suburban

2 kmParmarth Niketan - RedevCompleted 154Lapsed / revoked 98Other 218Dot size: filed unitsN

Filed coordinates, straight-line distance. 470 registered projects within 2 km.

Builder: J V Constructions & Developers

J V Constructions & Developers has 1 registration on MahaRERA, including Parmarth Niketan - Redevelopment of Mani Bhuvan. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Parmarth Niketan - Redevelopment of Mani Bhuvan is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Parmarth Niketan - Redevelopment of Mani Bhuvan?

The registered promoter entity is J V Constructions & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Parmarth Niketan - Redevelopment of Mani Bhuvan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Parmarth Niketan - Redevelopment of Mani Bhuvan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Parmarth Niketan - Redevelopment of Mani Bhuvan?

The professionals named in the filing: Architect: A R MEHTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Parmarth Niketan - Redevelopment of Mani Bhuvan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Parmarth Niketan - Redevelopment of Mani Bhuvan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Parmarth Niketan - Redevelopment of Mani Bhu to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.