ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Park Abhilasha- A,B,C Building

Registered No litigation declared Residential / Group Housing project

Park Abhilasha- A,B,C Building

By Aaryan Developers

RG-MH-74768 · RERA P52100055861 · Last updated on MahaRERA portal: 1 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
7 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 50%
157 of 168Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Park Abhilasha- A,B,C Building is a Residential / Group Housing project by Aaryan Developers in Pune, Maharashtra, registered with MahaRERA as P52100055861 on 23 Apr 2024. Possession is promised by 31 Dec 2027. 11 of the 168 units on this registration are recorded sold or booked, and 7 of 33 construction stages are filed complete.

At a glance

Project

  • NamePark Abhilasha- A,B,C Building
  • TypeResidential / Group Housing
  • Location
    • Near VP's College
    • Rui
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055861
  • ReraGenie IDRG-MH-74768

Builder

  • NameAaryan Developers
  • Entity typePartnership
  • PartnersAnant Prafulla Taware, Arvind Bhimdeo Taware
  • Other registrations1 more →

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed79 files

Current status

7%11 of 168 units booked

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Park Abhilasha A BuildingNA7756056
Park Abhilasha B BuildingNA7756056
Park Abhilasha C BuildingNA7756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

Park Abhilasha A Building33%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Park Abhilasha B Building29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Park Abhilasha C Building9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed192

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots192
Closed/Covered192
BuildingClosed/CoveredTotal
Park Abhilasha A Building6161
Park Abhilasha B Building6767
Park Abhilasha C Building6464

Land and ownership16

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,803 sq m
Land owned byThe promoter, with other names on the file
Named landowners16
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 May 2025
LandownerVillageDistrict
Shripad Ramchandra DeshpandeSupePune
Anna Aaba DhameNaroliPune
Sharad Appaso MachaleKutwalwadiPune
Anna Tukaram JagtapUndavadisupePune
Maruti Sadashiv RasalDeulgaon RasalPune
Latika Prakash JagtapWakiPune
Kalyan Vitthal GavaliBaramati (M Cl)Pune
Santosh Shankar KadamAlegaonPune
Meghana Prasad DeshpandeBaramati (M Cl)Pune
Manisha Aniruddha KhutwadBaramati (M Cl)Pune
Kusum Govind ThakurBaramati (M Cl)Pune
Balasaheb Kerba KadamAlegaonPune
Subhash Vinayak KadamAlegaonPune
Arun Tukaram ZendeFursungiPune
Hanumant Zumbar KadamAlegaonPune
Sandhya Jijaba KadamAlegaonPune

Approvals and building plan

Sanctioning authorityBaramati Municipal council
Permissible FSI10374.84
Proposed, not sanctioned10,375 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch CFC Office Complex MIDC Baramati, Dist -Pune, Maharashtra 413133

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantAkash Pawar
PartnerRole in project
Aaryan Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Certificate ABC Building.pdf1 May 2026
Form 2File: Engineer certificate ABC building.pdf1 May 2026
Form 3File: ABC building CA.pdf1 May 2026
Disclosure of Sold and Booked InventoryFile: sold ABC building.pdf1 May 2026
Form 1File: ABC building Form 1.pdf27 Jan 2026
Form 2File: ABC building Form 2.pdf27 Jan 2026
Form 3File: ABC building Form 3.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: ABC building Sold.pdf27 Jan 2026
Form 1File: Form 1 ABC sept 2025.pdf31 Oct 2025
Form 2File: Form 2 ABC sept 2025.pdf31 Oct 2025
Form 3File: Form 3 ABC bdg.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold A,B,C.pdf31 Oct 2025
Form 1File: Form 1 ABC bdg.pdf18 Jul 2025
Form 2File: Form 2 ABC bdg.pdf18 Jul 2025
Form 3File: CA Certificate Form-3 ABC Building.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold ABC bdg.pdf18 Jul 2025
Form 2File: a,b,c bdg april.pdf14 May 2025
Form 3File: FORM 3 ABC april.pdf14 May 2025
Form 2File: FORM 3 ABC april.pdf14 May 2025
Form 3File: architect a,b,c bdg july.pdf14 May 2025
Form 2File: architect a,b,c bdg july.pdf14 May 2025
Form 3File: architect a,b,c bdg octomber.pdf14 May 2025
Form 1File: architect a,b,c bdg july.pdf14 May 2025
Form 2File: architect a,b,c bdg octomber.pdf14 May 2025
Form 3File: architect a,b,c bdg january.pdf14 May 2025
Disclosure of Sold and Booked InventoryFile: FORM 3 ABC jan.pdf14 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: a,b,c bdg april.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: a,b,c bdg july.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: a,b,c bdg octomber.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: a,b,c bdg january.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: Sold A building.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: Sold B building.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: Sold C building.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect a,b,c bdg july_compressed (1).pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect a,b,c bdg octomber_compressed.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect a,b,c bdg january.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect ABC April_compressed.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ABC building Form 3.pdf16 Apr 2024
Other - FinanceFile: MOU Aryan Developers_compressed.pdf6 Apr 2024
Copy of the legal title reportFile: History Annexure A B C Building.pdf22 Mar 2024
Copy of the legal title reportFile: Format -A A B C Building.pdf22 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: A building 1_5.pdf22 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: ABC layout.pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: Financial abc.pdf27 Feb 2024
Details of encumbrances concerned to FinanceFile: legal abc.pdf27 Feb 2024
Details of encumbrances concerned to LegalFile: Financial abc.pdf27 Feb 2024
Details of encumbrances concerned to LegalFile: legal abc.pdf27 Feb 2024
Declaration about Commencement CertificateFile: format D abc.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC -abc.pdf27 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: abc 2form.pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (APT).pdf27 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure -(ABT).pdf27 Feb 2024
Proforma of Allotment letterFile: AL ABC.pdf27 Feb 2024
Other - TechnicalFile: ABC undertaking .pdf27 Feb 2024
Layout approvalFile: New Layout A B C.pdf26 Feb 2024
Copy of Layout Approval (in case of layout)File: New Layout A B C.pdf26 Feb 2024
Other - LegalFile: Gat No 19A Plot No 2.pdf26 Feb 2024
Declaration in FORM BFile: Form B -ABC.pdf23 Feb 2024
CERSAI detailsFile: Undertaking -ABC.pdf23 Feb 2024
Deviation Report with respect to Allotment letterFile: New Allotment -ABC.pdf23 Feb 2024
Deviation Report with respect to model copy of AgreementFile: New Agreement -ABC.pdf23 Feb 2024
Other - LegalFile: रुई_19_2_Satbara New.pdf23 Feb 2024
Other - LegalFile: रुई_20_2_Satbara New.pdf23 Feb 2024
Other - LegalFile: DA Aaryan Developers_compressed (1).pdf23 Feb 2024
Other - LegalFile: POA(OLD) AARYAN DEVELOPERS_compressed.pdf23 Feb 2024
Other - LegalFile: POA(NEW) Aryan Developers_compressed.pdf23 Feb 2024
Other - LegalFile: Aryan Developers Old partnership deed_compressed.pdf23 Feb 2024
Other - LegalFile: Aaryan Developers New Partnership Deed_compressed.pdf23 Feb 2024
Proforma of Agreement for saleFile: Draft Model Agreement Annexure 'A' - A to C Building-.pdf16 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (ABC building).pdf12 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: New Layout CC.pdf8 Feb 2024
Building plan approvalFile: Building A.pdf9 Dec 2023
Building plan approvalFile: Building B.pdf9 Dec 2023
Building plan approvalFile: Building C.pdf9 Dec 2023
PAN CardFile: Aaryan pan card.pdf9 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building A.pdf9 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building B.pdf9 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building C.pdf9 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Park Abhilasha C C.pdf9 Dec 2023

How this compares with Pune

7%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Park Abhilasha- A,B,C Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rui13,700+ in Pune

2 kmPark Abhilasha- A,B,C BuCompleted 19Lapsed / revoked 13Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: Aaryan Developers

Aaryan Developers has 2 registrations on MahaRERA, including Park Abhilasha-D Building and Park Abhilasha- A,B,C Building. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Park Abhilasha- A,B,C Building is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Park Abhilasha- A,B,C Building?

The registered promoter entity is Aaryan Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Park Abhilasha- A,B,C Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Park Abhilasha- A,B,C Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Park Abhilasha- A,B,C Building?

The professionals named in the filing: Chartered Accountant: Akash Pawar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Park Abhilasha- A,B,C Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Park Abhilasha- A,B,C Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Park Abhilasha- A,B,C Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.