Completed No litigation declared Residential / Group Housing project

Parinee Adney

By PARINEE REALTY PRIVATE LIMITED

RG-MH-12118 · RERA P51800001852 · Last updated on MahaRERA portal: 2 Feb 2024

Source: official MahaRERA filing

Red flags

  • 21 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
21Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

Parinee Adney is a Residential / Group Housing project by PARINEE REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001852 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 21 complaints are on record with the regulator.

At a glance

Project

  • NameParinee Adney
  • TypeResidential / Group Housing
  • Location
    • Holy Cross Road
    • I C Colony
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001852
  • ReraGenie IDRG-MH-12118

Builder

  • NamePARINEE REALTY PRIVATE LIMITED
  • Entity typeCompany
  • DireDhaval Dilip Shah
  • DirectorVipul Dilip Shah
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Parinee Adney - Building 1NA240000
Parinee Adney - Building 2NA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Parinee Adney - Building 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Parinee Adney - Building 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes70%
Open ParkingNoNot applicable

Parking filed187

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots187
Closed/Covered127
Open Space60
BuildingClosed/CoveredOpen SpaceTotal
Parinee Adney - Building 11260126
Parinee Adney - Building 216061

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,614 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI16787.47
Proposed, not sanctioned16,787 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANDHERI KURLA ROAD, ANDHERI EAST, MUMBAI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDot Architects
EngineerGOKANI CONSULTANTS
PartnerRole in project
PARINEE REALTY PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800003806Dec 2019 → Dec 2020

Reason as filed by the promoter‘Parinee Adney’ is SRA project having 1 Rehab and 2 sale buildings. Construction of Rehab and 1 Sale building is completed fully and 1 Sale building is on verge of completion. The Rehab building is ready and even part OC is obtained for 2nd to 18th upper floors. Ground is for commercial use.The ground floor OC is not issued because of eligibility of Slum Tenements which is still in process at Collector’s office. There is reservation of Dispensary and Maternity Home (DMH) in the project which will be handed over to MCGM on completion.The DMH constructed as per the design approved by Municipal A

Complaints filed with MahaRERA21

Case no.ComplainantRespondentFiled
CC006000000022944MANISH BANSAL & INDU BANSALK. R. MALI BUILDER AND DEVELOPER18/01/2018
CC006000000055975Rajiv Govind DharwadkarParinee Realty Pvt. Ltd.28/08/2018
CC006000000056170Mrs. Zemira Patrick DsouzaParinee Reality Pvt LTd13/09/2018
CC006000000056172Mr. Melville Carl DsouzaParinee Reality Pvt13/09/2018
CC006000000057672Gaurav SethParinee Realty Private Limited14/01/2019
CC006000000079208Mahesh M AjgaonkarParinee Realty Pvt Ltd08/05/2019
CC006000000079209Caine H R CrastaParinee Realty Pvt Ltd08/05/2019
CC006000000079210Brian DsilvaParinee Realty Pvt Ltd08/05/2019
CC006000000089611Ramesh Manjaya Poojary and Shobha PoojaryParinee Realty Pvt Ltd05/06/2019
CC006000000089618Dr Supriya Lynette DSouza and Mr Elias DSouzaParinee Realty Pvt Ltd05/06/2019
CC006000000089631Raphael Robert DSouza and Anita DSouzaParinee Realty Pvt Ltd07/06/2019
CC006000000089650Mr Peter Francis Tauro and Mrs Shobha Sonia TauroParinee Realty Pvt Ltd08/06/2019
CC006000000089664Ms Virginia Batra and Mr Dominic MascarenhasParinee Realty Pvt Ltd08/06/2019
CC006000000089684Mrs Tina Maria Pereira and Mr Daryl Dean MartisParinee Realty Pvt Ltd10/06/2019
CC006000000089719Mr Savio Angelo Dias and Ms Bertille S DiasParinee Realty Pvt Ltd12/06/2019
CC006000000089723Ms Sarah Veronica DCosta and Mrs Monthi Juliet DCostaParinee Realty Pvt Ltd13/06/2019
CC006000000089815Mrs Pearl Rodrigues and Mr Pravin RodriguesParinee Realty Pvt Ltd21/06/2019
CC006000000089903Mrs. Leelamma ChackoParinee Realty Private Limited12/07/2019
CC006000000090064Nilesh Chandrakant Dewanpelli & Archana Chandrakant DewanpelliParinee Realty Pvt Ltd11/07/2019
CC006000000171594Mr Steven Melwyn Miranda and Mrs Lora Elveena MirandaParinee Realty Pvt Ltd19/11/2019
CC006000000192712INDU AND MANISH BANSALPARINEE REALTY PRIVATE LIMITED & ORS26/02/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 May 2022

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: Form 4 Adney.pdf2 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee Adney March 2018.pdf29 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee Adney March 2019.pdf29 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee Adney March 2020.pdf29 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee Adney March March 2021.pdf29 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee Adney March 2022.pdf29 Sep 2023
Certificates of CA (Form 5)File: Form 5- Parinee Adney_FY 2022-23.pdf29 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Parinee Adney_FY 2022-23.pdf29 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 5 Certificates of CA (Form 5) (3).pdf10 Jan 2023
Certificates of CA (Form 5)File: RERA Form 5 Parinee Adney FY 2021 22.pdf24 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_dated_29-04-22.pdf19 May 2022
Architect’s Certificate on Completion of Project (Form 4)File: ADNEY ARCHITECTS CERTIFICATE FORM 4.pdf19 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Parini Adney Registration certificate_opt.pdf9 Mar 2022
Certificates of CA (Form 3)File: Rera Form no 3 Adney dated 31_03_2021.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Adney 18_19.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Adney 19_20.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Adney 20_21.pdf31 Dec 2021
Certificates of CA (Form 5)File: Parinee Adney Rera Form 5 FY 2020-21.pdf29 Dec 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Adney Sale 1 Part OC.pdf8 Oct 2021
Architect’s Certificate on Completion of Project (Form 4)File: Adney Arch Form 4.pdf8 Oct 2021
OtherFile: Adneyt CC application sale building mo 1 29012021.pdf19 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Adney 3BHK OC.pdf13 Oct 2020
Architect’s Certificate on Completion of Project (Form 4)File: ADney Form 4.pdf13 Oct 2020
Certificates of CA (Form 5)File: Adney Form no 5 2020.pdf30 Sep 2020
OtherFile: Dispatch copy of OC application 3BHK.pdf25 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Afdeny Full CC - 2 BHK.PDF15 Nov 2019
Certificates of CA (Form 5)File: C A Certified Rera Form 5 - Adney.pdf5 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Adney FORM 1 .pdf3 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Adney FORM 2 .pdf3 Aug 2019
Certificates of CA (Form 3)File: C A Certified Rera Form 3 - Adney.pdf3 Aug 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Adney Society Name reservation.pdf1 Nov 2018
Certificates of CA (Form 5)File: Form 5 - Parinee Adney.pdf13 Oct 2018
Details of encumbrancesFile: Yes Bank_Index II.pdf16 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch area cert ADNEY.pdf31 Oct 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4) Architect Certificate_Parinee Adney.pdf25 Jul 2017
Building plan approvalFile: 11b)Building Plan Approval (IOD) Building 2.pdf22 Jul 2017
Building plan approvalFile: 11a)Building Plan Approval (IOD) Building 1.pdf22 Jul 2017
Layout approvalFile: 14)Copy of Layout Approval.pdf22 Jul 2017
PAN CardFile: 2)Parinee Realty Pvt Ltd-PAN.pdf22 Jul 2017
Copy of the legal title reportFile: 8)Legal title report.pdf22 Jul 2017
Details of encumbrancesFile: 3)Details of Encumbrances Adney.pdf22 Jul 2017
Copy of Layout Approval (in case of layout)File: 14)Copy of Layout Approval.pdf22 Jul 2017
Building Plan Approval (IOD)File: 11a)Building Plan Approval (IOD) Building 1.pdf22 Jul 2017
Building Plan Approval (IOD)File: 11b)Building Plan Approval (IOD) Building 2.pdf22 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 7a) Full CC - Building 1.pdf22 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 7b) Full CC - Building 2.pdf22 Jul 2017
Declaration in FORM BFile: 1) Declaration in Form B_Parinee Adney.pdf22 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5)Certificates of Engineer (Form 2).pdf22 Jul 2017
Certificates of CA (Form 3)File: Certificate of CA (FORM 3) - Adney.pdf22 Jul 2017
Proforma of Allotment letterFile: 12)Proforma of the allotment letter and agreement for sale.pdf22 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ANANDVILLAPLOT NO. 65 Z LINKING ROAD SANTACRUZ WEST VILLAGE BANDRA TALUKA ANDHERI MUMBAI.17CompletedSep 2012Late, Dec 2012
SUDEEPPLOT NO 61 NUTAN LAXMI CHSL NS ROAD NO 8 JVPD VILLE PARLE WEST MUMBAI10CompletedMar 2012Late, May 2012
KRISHLINSUB PLOT NO 13 NUTAN LAXMI CHSL NS ROAD NO 10 JVPD VILLE PARLE WEST MUMBAI10CompletedMar 2010Late, Apr 2010

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Parinee Adney on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near I C Colony6,700+ in Mumbai Suburban

2 kmParinee AdneyCompleted 65Lapsed / revoked 52Other 107Dot size: filed unitsN

Filed coordinates, straight-line distance. 224 registered projects within 2 km.

Builder: PARINEE REALTY PRIVATE LIMITED

PARINEE REALTY PRIVATE LIMITED has 3 registrations on MahaRERA, including Parinee Adney and Parinee i. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Parinee Adney is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Parinee Adney?

The registered promoter entity is PARINEE REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Parinee Adney?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Parinee Adney?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Parinee Adney?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Parinee Adney?

The professionals named in the filing: Architect: Dot Architects; Engineer: GOKANI CONSULTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Parinee Adney?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Parinee Adney. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Parinee Adney to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.