Home / Browse projects / Mumbai Suburban, Maharashtra / PAREKH CELESTE
PAREKH CELESTE
RG-MH-64816 · RERA P51800047291 · Last updated on MahaRERA portal: 9 Feb 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PAREKH CELESTE is a Residential / Group Housing project by YASH AKAR DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047291 on 17 Oct 2022. The registration is recorded completed; possession was promised by 30 Apr 2027. 39 of the 76 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.
At a glance
Project
- NamePAREKH CELESTE
- TypeResidential / Group Housing
- Location
- PIRAMAL NAGAR
- OFF S V ROAD
- GOREGAON WEST
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800047291
- ReraGenie IDRG-MH-64816
Builder
- NameYASH AKAR DEVELOPERS LLP
- Entity typePartnership
- PartnersRAMESH PAREKH, YASH PAREKH, MEENA PAREKH
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Oct 2022
- Promised completion30 Apr 2027
- Revised completionNone
- Buildings2 building records
- Documents filed70 files
Current status
Figures as on 9 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PAREKH CELESTE A WING | NA | 14 | 14 | 26 | 0 | 26 |
| PAREKH CELESTE B WING | NA | 14 | 14 | 50 | 0 | 50 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 9 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
PAREKH CELESTE A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PAREKH CELESTE B WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 9 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| PAREKH CELESTE A WING | 12 | 12 |
| PAREKH CELESTE B WING | 28 | 28 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| PRESTIGE PIRAMAL CHSL | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PAREKH CELESTE A WING | NA | Rs 7.33 cr | Rs 11.43 cr |
| PAREKH CELESTE B WING | NA | Rs 7.33 cr | Rs 11.43 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KETAN VAIDYA ASSOCIATES |
| Engineer | CLINT DOS SANTOS |
| Engineer | JACOB D'SOUZA |
| Chartered Accountant | P C GAHLANI & CO |
| Chartered Accountant | PRADEEP GAGLANI |
| Chartered Accountant | nehali doshi |
| Partner | Role in project |
|---|---|
| YASH AKAR DEVELOPERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: 2461796_OC_signed.pdf | 9 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate- Yash Akar Developers LLP.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: PAREKH CELESTE FPRM 2 DEC 25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: Signed CA Certificate Yash aakar dec 25.pdf | 7 Feb 2026 |
| Withdrawal Update Form 1File: form 1 (architect certificate) - Yash Akar.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: sept form 2.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: ca form 3.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: form 1 (architect certificate) - Yash Akar (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: FORM2.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: CA FORM 3.pdf | 3 Feb 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed form 3 yash akar.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Parekh Celeste Form 2.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Certificate FORM 1.pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 - PAREKH CELESTE.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Parekh Celeste .pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 17 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf | 17 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Parekh Celeste form 2.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 15 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER FORM 2A - PAREKH CELESTE.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER Form 2 - PAREKH CELESTE.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Parekh Celeste.pdf | 13 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Parekh Celeste.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER- PAREKH CELESTE - Form 2.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Yash Akar Developers LLP.pdf | 14 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2- PAREKH CELESTE (July to Sept).pdf | 14 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Yash Akar Developers LLP.pdf | 14 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final- Parekh Celeste.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2- PAREKH CELESTE (3).pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 celeste.pdf | 17 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form-5 celeste.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2- PAREKH CELESTE (1).pdf | 18 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 15 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: yah akar developers LLP form-3.pdf | 14 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - PAREH CELESTE copy.pdf | 16 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: parekh celeste form 2.pdf | 16 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf | 13 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Yash Akar Developers LLP.pdf | 13 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Table.pdf | 8 Oct 2022 |
| Copy of the legal title reportFile: LEGAL TITLE CERTIFICATE.pdf | 3 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal.pdf | 3 Oct 2022 |
| Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal.pdf | 3 Oct 2022 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 3 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Yash Akar (1).pdf | 3 Oct 2022 |
| Declaration in FORM BFile: Form-B Promoter.pdf | 1 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf | 1 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement.pdf | 1 Sep 2022 |
| Layout approvalFile: IOD Plans Full FSI_00001.pdf | 30 Aug 2022 |
| Layout approvalFile: IOD Plans Full FSI_00002.pdf | 30 Aug 2022 |
| Layout approvalFile: IOD Plans Full FSI_00003.pdf | 30 Aug 2022 |
| Layout approvalFile: IOD Plans Full FSI_00004.pdf | 30 Aug 2022 |
| Building plan approvalFile: IOD Certificate.pdf | 30 Aug 2022 |
| PAN CardFile: Yash Akar LLP Pan Card.pdf | 30 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: IOD Plans Full FSI_00001.pdf | 30 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: IOD Plans Full FSI_00002.pdf | 30 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: IOD Plans Full FSI_00003.pdf | 30 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: IOD Plans Full FSI_00004.pdf | 30 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD Certificate.pdf | 30 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: First CC.pdf | 30 Aug 2022 |
| Declaration about Commencement CertificateFile: Parekh Celeste - Format D.pdf | 30 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 (1).pdf | 30 Aug 2022 |
| Proforma of Allotment letterFile: Final Allotment Letter as per RERA.pdf | 30 Aug 2022 |
| Proforma of Allotment letterFile: AFS of Yash Aakar (Prestige Piramal)- new RERA Format (AFS) (2) (1).pdf | 30 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Parekh Celeste - Format A.pdf | 30 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
Keep PAREKH CELESTE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GOREGAON WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 446 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: YASH AKAR DEVELOPERS LLP
YASH AKAR DEVELOPERS LLP has 1 registration on MahaRERA, including PAREKH CELESTE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if PAREKH CELESTE is delayed beyond 30 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PAREKH CELESTE?
The registered promoter entity is YASH AKAR DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PAREKH CELESTE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PAREKH CELESTE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PAREKH CELESTE?
The professionals named in the filing: Architect: KETAN VAIDYA ASSOCIATES; Engineer: CLINT DOS SANTOS; Engineer: JACOB D'SOUZA; Chartered Accountant: P C GAHLANI & CO; Chartered Accountant: PRADEEP GAGLANI; Chartered Accountant: nehali doshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PAREKH CELESTE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback