ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Panama Highstreet

Registered No litigation declared Mixed project

Panama Highstreet

By MS PANAMA SUNARCH DEVELOPERS

RG-MH-45379 · RERA P52100053454 · Last updated on MahaRERA portal: 2 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 70%
30 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Panama Highstreet is a Mixed project by MS PANAMA SUNARCH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100053454 on 6 Nov 2023. Possession is promised by 31 Dec 2027. 4 of the 34 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NamePanama Highstreet
  • TypeMixed
  • Location
    • HOLAKARWADI ROAD
    • HANDEWADI CHOWK
    • OUATADE HANDEWADI
    • Haveli
    • Pune
    • 411023
  • Pincode411023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053454
  • ReraGenie IDRG-MH-45379

Builder

  • NameMS PANAMA SUNARCH DEVELOPERS
  • Entity typePartnership
  • PartnersGAUTAM BALASAHEB LADKAT, NEELIMA GAUTAM LADKAT
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Nov 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

12%4 of 34 units booked
28.1%Work done, per cost certificate

Figures as on 2 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Panama HighstreetNA55142034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.

Panama Highstreet: 25% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYesNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed115

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots115
Open Space115

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,645 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Aug 2025

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI2520.25
Proposed, not sanctioned2,448 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIMAN NAGAR PUNE
Estimated costRs 2.73 cr
Cost incurredRs 76.90 lakh
Work done28.13%
BuildingWingEstimatedIncurred
Panama HighstreetNARs 2.20 crRs 76.90 lakh
-NARs 53.64 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK a architecture
EngineerMR SUHEL DIWAN
Chartered AccountantAmit A Somani
PartnerRole in project
MS PANAMA SUNARCH DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A-31032024.pdf2 Apr 2026
Building plan approvalFile: Panama Highstreet-Revised Sanction Plans 2026.pdf26 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 for 24-25 HighStreet.pdf26 Mar 2026
Form 526 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 for 2023-2024.pdf11 Mar 2026
Form 2A (FY 2024-2025)File: Quality assurance certificate PH march 25.PDF19 Feb 2026
Withdrawal Update Form 1File: Architect certificate Dec 2025.pdf29 Jan 2026
Withdrawal Update Form 2File: Engineer certificate Dec 2025.pdf29 Jan 2026
Withdrawal Update Form 3File: CA certificate 8012026.pdf29 Jan 2026
Withdrawal Update Form 1File: 250930 - RERA Certificate (Form-1)-july to Sept 25.pdf19 Nov 2025
Withdrawal Update Form 1File: 250930 - RERA Certificate (Form-1)-july to Sept 25.pdf19 Nov 2025
Withdrawal Update Form 2File: Eng certificate July to Sept 25.pdf19 Nov 2025
Withdrawal Update Form 2File: Eng certificate July to Sept 25.pdf19 Nov 2025
Withdrawal Update Form 3File: PANAMA HIGHSTREET CA SIGNED FORM 3 SEP25_compressed.pdf19 Nov 2025
Withdrawal Update Form 3File: PANAMA HIGHSTREET CA SIGNED FORM 3 SEP25_compressed.pdf19 Nov 2025
Form 1File: Architech certificate PH march 25.PDF18 Jul 2025
Form 2File: Engg certificate PH march 25.PDF18 Jul 2025
Form 3File: Form 3- Q1-2025-Highstreet.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory - Q1-2025.pdf18 Jul 2025
Form 1File: ARCHITECT.PDF18 Jul 2025
Form 2File: Form 2A Elite Space.PDF18 Jul 2025
Form 3File: CA Carti.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Q4-2024.pdf18 Jul 2025
Form 1File: ARCHITECT.PDF18 Jul 2025
Form 2File: Eng.pdf18 Jul 2025
Form 3File: CA Carti.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate PH march 25.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate PH march 25.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate PH march 25.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Elite Space.PDF6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT.PDF16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Carti.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certi.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Elite space.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240630 - RERA Certificate Form-1-Arch Certificate.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 240630 - RERA Certificate Form-2- Eng Certificate (2).pdf21 Oct 2024
Proforma of Agreement for saleFile: Draft Agreement Elite Space.pdf27 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report for Agreement to Sale.pdf27 Oct 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrances Report .pdf17 Oct 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrances Report .pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Draft Agreement Elite Space.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Elite Space.pdf11 Oct 2023
Copy of the legal title reportFile: Title report Format A Elite Space.pdf4 Oct 2023
Proforma of Allotment letterFile: Allotment Letter.pdf3 Oct 2023
Building plan approvalFile: Upper nd Lower Groung floor plan Elite Space.pdf26 Sep 2023
Building plan approvalFile: Section Plan Elite space.pdf26 Sep 2023
Details of encumbrances concerned to FinanceFile: Self Declaration regarding Encumbrances.pdf26 Sep 2023
Details of encumbrances concerned to LegalFile: Self Declaration regarding Encumbrances.pdf26 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Upper nd Lower Groung floor plan Elite Space.pdf26 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Section Plan Elite space.pdf26 Sep 2023
CERSAI detailsFile: CERSAI report.pdf26 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for the real estate project.pdf26 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Elite Space.pdf20 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Elite Space.pdf20 Sep 2023
Layout approvalFile: Master Lay Out Elite Space.pdf8 Sep 2023
PAN CardFile: PAN-PSD.pdf8 Sep 2023
Copy of Layout Approval (in case of layout)File: Master Lay Out Elite Space.pdf8 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate Elite Space 3072023.pdf8 Sep 2023
Declaration about Commencement CertificateFile: Declartion abt Commencement certificate.pdf8 Sep 2023
Declaration in FORM BFile: FORM B Rera Elite Space.pdf8 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Form 1.pdf8 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclose of Sold or Booked Inventory.pdf8 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration abt interest in other real estate organization GBL.pdf8 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration abt interest in other real estate organization NGL.pdf8 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment letter.pdf8 Sep 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SILVER STONE-Amenity buildingVillage Autade Handewadi107CompletedDec 2024Mar 2020

How this compares with Pune

12%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Panama Highstreet on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HANDEWADI CHOWK13,700+ in Pune

2 kmPanama HighstreetCompleted 44Lapsed / revoked 22Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: MS PANAMA SUNARCH DEVELOPERS

MS PANAMA SUNARCH DEVELOPERS has 1 registration on MahaRERA, including Panama Highstreet. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Panama Highstreet is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Panama Highstreet?

The registered promoter entity is MS PANAMA SUNARCH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Panama Highstreet?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Panama Highstreet?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Panama Highstreet?

The professionals named in the filing: Architect: VK a architecture; Engineer: MR SUHEL DIWAN; Chartered Accountant: Amit A Somani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Panama Highstreet?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Panama Highstreet. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Panama Highstreet to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.