ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / PALI PALMS

Registration lapsed No litigation declared Residential / Group Housing project

PALI PALMS

By SSD HOLDINGS LLP

RG-MH-63330 · RERA P51800011792 · Last updated on MahaRERA portal: 15 Apr 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
8 of 11Construction stages donefurthest along: Internal walls, 90%
1Complaints at MahaRERAon this registration
Jump to the 29 documents Report an error

PALI PALMS is a Residential / Group Housing project by SSD HOLDINGS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011792 on 31 Aug 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 42 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePALI PALMS
  • TypeResidential / Group Housing
  • Location
    • 16th Road
    • Bandra West
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011792
  • ReraGenie IDRG-MH-63330

Builder

  • NameSSD HOLDINGS LLP
  • Entity typePartnership
  • PartnersSANJAY JAGWANI, AMIT JAGWANI, MAHESH JAGWANI, SUNIL DOULTANI, KUMAR MORDANI
  • Declared earlier projects1 →

Key dates

40 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed29 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PALI PALMSNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

PALI PALMS: 97% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 15 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered1
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area874 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2944.83
Proposed, not sanctioned2,945 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTURNER ROAD BANDRA WEST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPUSHKAR & CONSULTANTS
EngineerDoultani & Associates
Chartered AccountantRMA & Co
PartnerRole in project
SSD HOLDINGS LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010043Dec 2019 → Dec 2022

Reason as filed by the promoter1. We, SSD Holdings LLP, promoter of PALI PALMS, registered office address 7th Floor, Notan Plaza, Turner Road, Bandra West, Mumbai- 400050, hereby apply for extension u/s 7 (3) of the registered project bearing vide no P51800011792, with more than 2/3rd consent of the Association of allottees. 2. That the Project ‘Pali Palms’ (hereinafter referred to as the project) was registered with MAHARERA on 31.08.2017, bearing Registration no. P51800011792 which was scheduled to expire on 31.12.2019, by certificate dated 18.5.2020 stand valid till 30.6.2021. 3. That we do hereby make a request for exte

EXT51800005080Dec 2019 → Dec 2020

Reason as filed by the promoter1. The project is sanctioned under DCR (14) of Development Control Rules and is approved by Slum Rehabilitation Authority, Mumbai. The construction of the building Pali Palms, situated on Plot having CTS No. F/575A, F/579 & F/580 comprising of ground plus 2 podium plus 14 floors has been completed as per approved plans. 2. However, under the scheme, completion and handover of 26 PTC (Permanent Transit Camps) to Slum Rehabilitation Authority, Maharashtra has to be completed. The responsibility for constructing the PTC is on Koel Developers LLP on piece of land situated at 85,85/1 to 85/58 & 86,

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000141074VISHAL MALIKSSD HOLDINGS LLP27/09/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed29

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SSD HOLDINGS LLP 2021-2022.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1 (1).pdf3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: (2).pdf3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: (3).pdf3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: (4).pdf3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: (4).pdf3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: (6).pdf3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: (7).pdf3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: (8).pdf3 Jul 2021
Declaration about Commencement CertificateFile: Declaration of CC Under Circular 32.pdf30 Jun 2021
Disclosure of sold/ booked inventoryFile: Disclosure for SoldUnsold Inventory.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SSD Form 5 - 2018-19.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: SSD Form 5 - 2019-20.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SSD Form 5 - 2020-21.pdf30 Jun 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Pali Palms CHS Registration Certificate.pdf30 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf12 Oct 2018
PAN CardFile: SSD Holdings LLP.pdf2 Oct 2018
Certificates of CA (Form 5)File: CA Certificate Form 5.pdf2 Oct 2018
Layout approvalFile: AMENDED PLAN AND SRA LETTER.pdf31 Jul 2017
Building plan approvalFile: INTIMATION OF APPROVAL.pdf31 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf31 Jul 2017
Details of encumbrancesFile: NO ENCRUMBANCE CERTIFICATE.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: AMENDED PLAN AND SRA LETTER.pdf31 Jul 2017
Building Plan Approval (IOD)File: INTIMATION OF APPROVAL.pdf31 Jul 2017
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHETECT CERTIFICATE.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA FORM 3.pdf31 Jul 2017
Proforma of Allotment letterFile: DRAFT SALE AGREEMENT.PDF31 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAPPHIRECORNER OF S V ROAD AND 1ST ROAD KHAR W MUMBAI 40005216CompletedOct 2011Oct 2011

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 42 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PALI PALMS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bandra West6,700+ in Mumbai Suburban

2 kmPALI PALMSCompleted 97Lapsed / revoked 50Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 282 registered projects within 2 km.

Builder: SSD HOLDINGS LLP

SSD HOLDINGS LLP has 1 registration on MahaRERA, including PALI PALMS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that PALI PALMS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PALI PALMS is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PALI PALMS?

The registered promoter entity is SSD HOLDINGS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PALI PALMS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PALI PALMS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PALI PALMS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PALI PALMS?

The professionals named in the filing: Architect: PUSHKAR & CONSULTANTS; Engineer: Doultani & Associates; Chartered Accountant: RMA & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PALI PALMS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PALI PALMS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PALI PALMS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.