Ozone Residency

By Blue Ocean Realty

RG-MH-17668 · RERA P51800056206 · Last updated on MahaRERA portal: 4 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 80%
55 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Ozone Residency is a Others project by Blue Ocean Realty in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056206 on 21 May 2024. Possession is promised by 31 Dec 2027. 57 of the 112 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameOzone Residency
  • TypeOthers
  • Location
    • Godavari Mhatre Road
    • Dahisar west
    • Dahisar
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056206
  • ReraGenie IDRG-MH-17668

Builder

  • NameBlue Ocean Realty
  • Entity typePartnership
  • PartnersTarique Yusuf Dhukka, Sameer Kamjad Khan, Kamjad Latif Khan, Yusuf Umer Dhukka, Maaz Ilyas Athania
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 May 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed82 files

Current status

51%57 of 112 units booked
40.4%Work done, per cost certificate

Figures as on 4 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA5568068
Building No 2NA2244044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 80%.

Building No 147%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises36%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 261%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.41%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30
BuildingClosed/CoveredTotal
Building No 11616
Building No 21414

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,887 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Dec 2025
LandownerVillageDistrict
Flora DevelopersAndheriMumbai Suburban
Kamjad Latif KhanAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8000.0
Proposed, not sanctioned1,245 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 1, Ayesha Tower, Plot No 220/8, S V Road, Jogeshwari West, Mumbai 400102
Estimated costRs 41.40 cr
Cost incurredRs 16.70 cr
Work done40.35%
BuildingWingEstimatedIncurred
Building No 1NARs 24.84 crRs 16.70 cr
Building No 2NARs 16.56 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPriyank Bhatt Architects
EngineerUnisteps Consulting
Chartered AccountantPunit Patel & Associates Chartered Accountants
PartnerRole in project
Blue Ocean Realty-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form- 2A ( Quality Assurance Certificate)July 2025 to March 2026.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 01-FY 2026-27.pdf23 Jul 2026
Withdrawal Update Form 2File: Form 02 Q1-FY 26-27.pdf23 Jul 2026
Withdrawal Update Form 3File: Form 03 Q1 FY-2026-27.pdf23 Jul 2026
Withdrawal Update Form 1File: Form 01.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 01 Q4 FY 2025-26.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 02.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 02 Q4 FY 2025-25-26.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 03.pdf20 Jul 2026
Withdrawal Update Form 3File: Final Form 03 Q4 2025-26.pdf20 Jul 2026
Form 1File: Form 1 Q1 25 26 Ozone Residency.pdf26 Nov 2025
Form 2File: Form 2 Q1 25 26 Ozone Residency.pdf26 Nov 2025
Form 3File: Form 3 Q1 25 26 Ozone Residency.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: DOS Q1 25 26 Ozon Residency v1.pdf26 Nov 2025
Form 1File: Form 01 (2).pdf24 Nov 2025
Form 2File: From 02 (1).pdf24 Nov 2025
Form 3File: Form 03 (1).pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30-09-2025 v1.pdf24 Nov 2025
Form 1File: Form-1.pdf24 Jun 2025
Form 2File: Form-2.pdf24 Jun 2025
Form 3File: Form-3.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold inventory.pdf24 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-12-24_compressed.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Compressed.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Disc of Sold Un-Sold Unit.pdf5 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Further CC SALE BUILDING NO 1.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Discloser of Sold-Unsold Unit_11zon.pdf30 Dec 2024
Proforma of Allotment letterFile: Revised AFS_04122024.pdf13 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report for AFS_pdf_11zon.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bldg No-1.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_build 1 and 2_11zon.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 9-12-24.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Structural Eng.pdf12 Dec 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf12 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2-A_11zon.pdf12 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Bldg No-1.pdf25 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Further Cc Bldg No-2.pdf25 Nov 2024
Declaration about Commencement CertificateFile: CC Bldg No-1.pdf25 Nov 2024
Layout approvalFile: Closure docu_Combined pdf.pdf21 Nov 2024
Building plan approvalFile: IOA BLDG NO1 SALE 30072024.pdf21 Nov 2024
Building plan approvalFile: IOA BLDG NO2 (REHAB) 30072024_Compressed.pdf21 Nov 2024
Copy of Layout Approval (in case of layout)File: Closure docu_Combined pdf.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA BLDG NO1 SALE 30072024.pdf21 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA BLDG NO2 (REHAB) 30072024_Compressed.pdf21 Nov 2024
Declaration about Commencement CertificateFile: Declaration on CC_V1_TRIAL_compressed.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Q-4 23-24.pdf10 May 2024
Declaration about Commencement CertificateFile: Decl of CC.pdf8 May 2024
Proforma of Allotment letterFile: Allotment Letter_V1_Final_Compressed.pdf18 Mar 2024
Other - LegalFile: Order 50.pdf15 Mar 2024
Other - TechnicalFile: Order 50.pdf15 Mar 2024
Proforma of Agreement for saleFile: RERA Agreement (1) NEW.pdf7 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report_AFS NEWW (1).pdf7 Feb 2024
Other - TechnicalFile: Declaration for one plot one registration.pdf7 Feb 2024
Layout approvalFile: Bldg No-1.pdf4 Feb 2024
Layout approvalFile: Bldg No-2 Com.pdf4 Feb 2024
Building plan approvalFile: Bldg No-1.pdf4 Feb 2024
Building plan approvalFile: Bldg No-2 Com.pdf4 Feb 2024
PAN CardFile: Bkue Ocean Realty Pan.pdf4 Feb 2024
Copy of the legal title reportFile: Title Rport by.pdf4 Feb 2024
Details of encumbrances concerned to FinanceFile: Non-Encumbrance_finance_V1.pdf4 Feb 2024
Details of encumbrances concerned to FinanceFile: Non-Encumbrance_legal_V1.pdf4 Feb 2024
Details of encumbrances concerned to LegalFile: Non-Encumbrance_finance_V1.pdf4 Feb 2024
Details of encumbrances concerned to LegalFile: Non-Encumbrance_legal_V1.pdf4 Feb 2024
Copy of Layout Approval (in case of layout)File: Bldg No-1.pdf4 Feb 2024
Copy of Layout Approval (in case of layout)File: Bldg No-2 Com.pdf4 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg No-1.pdf4 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg No-2 Com.pdf4 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 14651 Bldg No-1.pdf4 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 14665 Bldg No-2.pdf4 Feb 2024
Declaration in FORM BFile: Form B Affidavit Cum Declaration.pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_v1 as on 15jan.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf4 Feb 2024
CERSAI detailsFile: CERSAI details_V1.pdf4 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Tarique Dhukka Disclosure of Interest of othe Project.pdf4 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sameer Kamjad Khan Disclosure of Interest of othe Project.pdf4 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Kamjad Khan Disclosure of Interest of othe Project.pdf4 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Yusuf Dhukka Disclosure of Interest of othe Project.pdf4 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Maaz Athania Disclosure of Interest of othe Project.pdf4 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 13 Declaration About Seperate Account.pdf4 Feb 2024

How this compares with Mumbai Suburban

51%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ozone Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dahisar west6,700+ in Mumbai Suburban

2 kmOzone ResidencyCompleted 70Lapsed / revoked 47Other 116Dot size: filed unitsN

Filed coordinates, straight-line distance. 233 registered projects within 2 km.

Builder: Blue Ocean Realty

Blue Ocean Realty has 2 registrations on MahaRERA, including Ozone Residency and Ozone Heritage. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ozone Residency is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ozone Residency?

The registered promoter entity is Blue Ocean Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ozone Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ozone Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ozone Residency?

The professionals named in the filing: Architect: Priyank Bhatt Architects; Engineer: Unisteps Consulting; Chartered Accountant: Punit Patel & Associates Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ozone Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ozone Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ozone Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.