Red flags

  • Litigation declared, 4 cases
  • Completion date moved by 54 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 54 months from the original
2 of 11Construction stages donefurthest along: Basement (if any), 95%
31 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 163 documents Report an error

ORCHID ARCADE is a Residential / Group Housing project by SWASTIK ANMOL BUILDERS AND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700010098 on 24 Aug 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 54 months from the original filing. 6 of the 37 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameORCHID ARCADE
  • TypeResidential / Group Housing
  • Location
    • PLOT NO.-6
    • BLDG. NO.-F-4
    • SECTOR NO.-10
    • VASHI
    • NAVI MUMBAI
    • Navi Mumbai (M Corp.)
    • Thane
    • 400703
  • Pincode400703
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010098
  • ReraGenie IDRG-MH-87621

Builder

  • NameSWASTIK ANMOL BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnerPRADEEP ARJUN SHINDE

Key dates

this monthRegisteredAug 2017First promiseJun 2024Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Aug 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed163 files

Current status

16%6 of 37 units booked
73.9%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ORCHID ARCADENA171629837

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

ORCHID ARCADE: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)90%
Plinth95%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered29
Open Space11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,267 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Aug 2025

Approvals and building plan

Sanctioning authorityTown Planner, Navi Mumbai Municipal Corporation
Permissible FSI2534.4
Proposed, not sanctioned2,534 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAVIR CENTRE PRIMSSES PLOT NO 77 SECTOR 17 VASHI NAVI MUMBAI
Estimated costRs 4.80 cr
Cost incurredRs 3.55 cr
Work done73.93%
BuildingWingEstimatedIncurred
ORCHID ARCADENARs 4.70 crRs 3.55 cr
-NARs 10.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDIMENSIONS ARCHITECTS PVT LTD
EngineerVINIT CONSULTANTS
EngineerSAMADHAN KISAN RAJGUGU
Chartered AccountantMANHOJ J JANGGLANI
Chartered AccountantBABULAL H PATEL
Chartered AccountantNIKHIL NATEKAR
PartnerRole in project
SWASTIK ANMOL BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05092502517Jun 2024 → Dec 2028

Reason as filed by the promoterCourt Case pending before supreme court with status quo to be maintained.

Litigation declared4

CaseCourtStatus
11380/2015BOMBAY HIGH COURTClosed
12714/2015BOMBAY HIGH COURTClosed
11380,12714/2015BOMBAY HIGH COURTClosed
(CIVIL) Diary No(s). 11724/2024SUPREME COURT OF INDIAOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed163

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 163 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - SWASTIK ANMOL - 31-03-2026.pdf25 May 2026
Withdrawal Update Form 1File: FORM 1 - 30-06-2025.pdf25 May 2026
Withdrawal Update Form 1File: FORM 1 - 30-09-2025.pdf25 May 2026
Withdrawal Update Form 1File: FORM 1 - SWASTIK ANMOL - 31-12-2025.pdf25 May 2026
Withdrawal Update Form 1File: FORM 1 - SWASTIK ANMOL - 31-03-2026.pdf25 May 2026
Withdrawal Update Form 2File: FORM 2 - SWASTIK ANMOL - 31-03-2026.pdf25 May 2026
Withdrawal Update Form 2File: FORM 2 - 30-06-2025.pdf25 May 2026
Withdrawal Update Form 2File: FORM 2 - 30-09-2025.pdf25 May 2026
Withdrawal Update Form 2File: FORM 2 - SWASTIK ANMOL - 31-12-2025.pdf25 May 2026
Withdrawal Update Form 2File: FORM 2 - SWASTIK ANMOL - 31-03-2026.pdf25 May 2026
Withdrawal Update Form 3File: FORM 3.pdf25 May 2026
Withdrawal Update Form 3File: FORM 3 - SWASTIK ANMOL - 30-06-2025.pdf25 May 2026
Withdrawal Update Form 3File: FORM 3 - SWASTIK ANMOL - 30-09-2025.pdf25 May 2026
Withdrawal Update Form 3File: FORM 3 - SWASTIK ANMOL - 31-12-2025.pdf25 May 2026
Withdrawal Update Form 3File: FORM 3 - SWASTIK ANMOL - 31-03-2026.pdf25 May 2026
Form 2A (FY 2024-2025)File: FORM 2A - 2024-25.pdf10 Sep 2025
Form 5 (FY 2024-2025)File: FORM 5 - 2024-25.pdf10 Sep 2025
Form 5 (FY 2020-2021)File: FORM 5 2020-21.pdf10 Sep 2025
Form 5 (FY 2018-2019)File: FORM 5 - 2018-19.pdf3 Sep 2025
Form 5 (FY 2019-2020)File: FORM 5 - 2019 - 20.pdf3 Sep 2025
Form 5 (FY 2021-2022)File: FORM 5 - 2021-22.pdf3 Sep 2025
Form 5 (FY 2022-2023)File: FORM 5 - 2022-23.pdf3 Sep 2025
Form 5 (FY 2023-2024)File: FORM 5 - 2023-24.pdf3 Sep 2025
Form 5 (FY 2017-2018)File: FORM 5 - 2017-18.pdf29 Aug 2025
Form 2A (FY 2023-2024)File: FORM 2A - 2023-24.pdf22 Aug 2025
Form 2A (FY 2017-2018)File: FORM 2A - 2017-18.pdf22 Aug 2025
Form 2A (FY 2018-2019)File: FORM 2A - 2018-19.pdf22 Aug 2025
Form 2A (FY 2019-2020)File: FORM 2A - 2019 - 20.pdf22 Aug 2025
Form 2A (FY 2020-2021)File: FORM 2A - 2020-21.pdf22 Aug 2025
Form 2A (FY 2021-2022)File: FORM 2A - 2021-22.pdf22 Aug 2025
Form 2A (FY 2022-2023)File: FORM 2A - 2022-23.pdf22 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 30-06-2020.pdf21 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 30-06-2020.pdf21 Aug 2025
Form 3File: CA CERTIFICATE - 30-06-2020.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-06-2020.pdf21 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 31-03-2023.pdf21 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 30-03-2023.pdf21 Aug 2025
Form 3File: CA CERTIFICATE - 31-03-2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-03-2023.pdf21 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 30-09-2023.pdf21 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 30-09-2023.pdf21 Aug 2025
Form 3File: CA CERTIFICATE - 30-09-2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-09-2023.pdf21 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 30-09-2017.pdf21 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 30-09-2017.pdf21 Aug 2025
Form 3File: CA CERTIFICATE - 30-09-2017.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-09-2017.pdf21 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 31-03-18.pdf19 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 31-03-2018..pdf19 Aug 2025
Form 3File: CA CERTIFICATE - 31-03-2018.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-03-2018.pdf19 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 30-06-2018.pdf19 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 30-06-2018.pdf19 Aug 2025
Form 3File: CA CERTIFICATE - 30-06-2018.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-06-2018.pdf19 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 30-09-2018 rev.pdf19 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 30-09-2018.pdf19 Aug 2025
Form 3File: CA CERTIFICATE - 30-09-2018.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-09-2018.pdf19 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 31-12-2018.pdf19 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 31-12-2018.pdf19 Aug 2025
Form 3File: CA CERTIFICATE - 31-12-2018.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-12-2018.pdf19 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 31-03-2019.pdf19 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 30-03-2019.pdf19 Aug 2025
Form 3File: CA CERTIFICATE - 31-03-2019.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-03-2019.pdf19 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 30-06-2019.pdf19 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 30-06-2019.pdf19 Aug 2025
Form 3File: CA CERTIFICATE - 30-06-2019.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-06-2019.pdf19 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 30-09-2019.pdf19 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 30-09-2019.pdf19 Aug 2025
Form 3File: CA CERTIFICATE - 30-09-2019.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 30-09-2019.pdf19 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 31-12-2019.pdf19 Aug 2025
Form 2File: ENGINEER CERTIFICATE - 31-12-2019.pdf19 Aug 2025
Form 3File: CA CERTIFICATE - 31-12-2019.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY - 31-12-2019.pdf19 Aug 2025
Form 1File: ARCHITECT CERTIFICATE - 31-03-2020.pdf19 Aug 2025

How this compares with Thane

16%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 54 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ORCHID ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASHI, NAVI MUMBAI7,600+ in Thane

2 kmORCHID ARCADECompleted 13Lapsed / revoked 5Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: SWASTIK ANMOL BUILDERS AND DEVELOPERS

SWASTIK ANMOL BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including ORCHID ARCADE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ORCHID ARCADE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ORCHID ARCADE?

The registered promoter entity is SWASTIK ANMOL BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ORCHID ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ORCHID ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ORCHID ARCADE?

The professionals named in the filing: Architect: DIMENSIONS ARCHITECTS PVT LTD; Engineer: VINIT CONSULTANTS; Engineer: SAMADHAN KISAN RAJGUGU; Chartered Accountant: MANHOJ J JANGGLANI; Chartered Accountant: BABULAL H PATEL; Chartered Accountant: NIKHIL NATEKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ORCHID ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ORCHID ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ORCHID ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.