Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
Mar 2028Possession promisedno revision filed
29 of 36Construction stages doneacross 4 buildings; furthest along: Sanitary fittings within the flats, 95%
129 of 300Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

OMNIUM ROYAL VIEW is a Mixed Development project by OMNIUM DEVELOPERS in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/MAA12438/131023 on 13 Oct 2023. Possession is promised by 31 Mar 2028. 171 of the 300 units on this registration are recorded sold or booked, and 29 of 36 construction stages are filed complete.

At a glance

Project

  • NameOMNIUM ROYAL VIEW
  • TypeMixed Development
  • Location
    • OMNIUM ROYAL VIEW
    • OPP. GOLDEN BUNGALOWS
    • NR. PREM-PRAKASH ASHRAM
    • NOBLE NAGAR - AIRPORT ROAD
    • NANA CHILODA
    • Gandhinagar
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/MAA12438/131023
  • ReraGenie IDRG-GJ-11170

Builder

  • NameOMNIUM DEVELOPERS
  • Entity typePARTNERSHIP FIRM

Key dates

this monthRegisteredOct 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusValid until 31 Mar 2028
  • Registered on13 Oct 2023
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed44 files

Current status

57%171 of 300 units booked
90.4%Of the estimated cost spent so far

Figures as on 20 Mar 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK-C---84084
BLOCK-B1+B2---10513118
BLOCK-D---56056
BLOCK-A---42042

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building4

As on 20 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary fittings within the flats, at 95%.

BLOCK-C89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK-B1+B299%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats95%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing95%
BLOCK-D89%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK-A88%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats95%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing95%

Progress on shared amenities19

As on 20 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes90%
Water supplyYes90%
Sewerage (chamber, lines, septic tank, STP)Yes90%
Storm water drainsYes100%
Landscaping and tree plantingYes85%
Street lightingYes90%
Community buildingsYes90%
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalYes100%
Water conservation, rain water harvestingYes50%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingYes100%
Drinking water facilitiesYes100%
Emergency evacuationNoNot applicable
Use of renewable energyYes100%
SecurityYes50%
Letter boxYes50%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,024 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 45.12 cr
Cost incurredRs 40.80 cr
Spent of the estimate90.43%
BuildingWingEstimatedIncurred
BLOCK-B1+B2NARs 15.90 crRs 14.95 cr
BLOCK-CNARs 12.40 crRs 10.80 cr
BLOCK-ANARs 8.60 crRs 7.85 cr
BLOCK-DNARs 8.22 crRs 7.20 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDIPAN R. APPA
EngineerSANDIP G. VADHER

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/AUDA/MAA12438/131023 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)20 Mar 2026
Architect's certificate (Form 1)18 Mar 2026
Engineer's certificate (Form 2)18 Mar 2026
Engineer's certificate annexure18 Mar 2026
Site photograph, BLOCK-C18 Mar 2026
Site photograph, BLOCK-B1+B218 Mar 2026
Site photograph, BLOCK-D18 Mar 2026
Site photograph, BLOCK-A18 Mar 2026
RERA registration certificate13 Oct 2023
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

57%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one has not

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep OMNIUM ROYAL VIEW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gandhinagar1,600+ in Gandhinagar

2 kmOMNIUM ROYAL VIEWOther 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: OMNIUM DEVELOPERS

OMNIUM DEVELOPERS has 1 registration on GujRERA, including OMNIUM ROYAL VIEW. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if OMNIUM ROYAL VIEW is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of OMNIUM ROYAL VIEW?

The registered promoter entity is OMNIUM DEVELOPERS, a partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in OMNIUM ROYAL VIEW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at OMNIUM ROYAL VIEW?

The professionals named in the filing: Architect: DIPAN R. APPA; Engineer: SANDIP G. VADHER. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OMNIUM ROYAL VIEW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OMNIUM ROYAL VIEW. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OMNIUM ROYAL VIEW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.