Home / Browse projects / Nashik, Maharashtra / OMKAR TOWERS
OMKAR TOWERS
RG-MH-13812 · RERA P51600028753 · Last updated on MahaRERA portal: 30 Jun 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 3 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OMKAR TOWERS is a Others project by OMKAR BUIDCON in Nashik, Maharashtra, registered with MahaRERA as P51600028753 on 30 Mar 2021. The registration is recorded completed; possession was promised by 30 Sep 2026.
At a glance
Project
- NameOMKAR TOWERS
- TypeOthers
- Location
- MERI RASBIHARI LINK ROAD
- OPP AUDUMBER LAWNS
- Nashik (M Corp.)
- Nashik
- 422001
- Pincode422001
- RERA no.P51600028753
- ReraGenie IDRG-MH-13812
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Mar 2021
- Promised completion30 Sep 2026
- Revised completionNone
- Buildings1 building record
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| OMKAR TOWERS | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.
OMKAR TOWERS: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed364
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SURESH PATEL |
| Engineer | SUNIL PATEL |
| Chartered Accountant | NANDKISHOR D PATIL |
| Partner | Role in project |
|---|---|
| OMKAR BUIDCON | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Mar 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Jun 2025
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A FY 24-25.pdf | 30 Jun 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: EMAIL FROM NMC.pdf | 7 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q4 FY 24-25.pdf | 11 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLECTION CERTIFICATE TOWER.pdf | 9 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY MARCH 25.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q3 FY 24-25.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY DEC 24.pdf | 28 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A NEW FY 2023-2024.pdf | 28 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 23-2024 OMKAR TOWER.pdf | 28 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q2 FY 24-25.pdf | 8 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY TOWER SEP 24.pdf | 17 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: OMKAR TOWER DISCLOSER OF INVENTORY JUNE 24.pdf | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q4 FY 23-24.pdf | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q1 FY 24-25.pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY MARCH 24.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q3 FY 23-24.pdf | 27 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY DEC 23.pdf | 21 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 22-23 OMKAR TOWERS.pdf | 12 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q2 FY 23-24.pdf | 11 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSER OF INVENTORY SEP 23.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A NEW.pdf | 24 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q2 FY 22-23.pdf | 24 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q3 FY 22-23.pdf | 24 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q4 FY 22-23.pdf | 24 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SELF CLARIFICATION Q1 FY 23-24.pdf | 24 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY JUNE 23.pdf | 23 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A NEW.pdf | 9 May 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY march 23.pdf | 18 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY DEC 22.pdf | 15 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY SEP 22 DONE.pdf | 6 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CA CERTIFICATE OMKAR TOWER.PDF | 18 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory march 22 (2).pdf | 12 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory june 22 (2).pdf | 12 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: OMKAR TOWER FORM 5 ruT FY 20-21.PDF | 19 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A DEC 21_compressed.pdf | 25 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: INVENTORY TOWER DEC 21.pdf | 25 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A JUNE 21_compressed.pdf | 2 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 A SEP 21_compressed.pdf | 2 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: INVENTORY TOWERS RERA 30-06-2021_compressed.pdf | 2 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: INVENTORY TOWERS RERA 30-09-21_compressed.pdf | 2 Nov 2021 |
| Building plan approvalFile: BUILDING PLAN 1.pdf | 8 Mar 2021 |
| Building plan approvalFile: BUILDING PLAN 2.pdf | 8 Mar 2021 |
| Copy of the legal title reportFile: TITLE REPORT TOWERS_compressed.pdf | 8 Mar 2021 |
| Details of encumbrancesFile: NO ENCUMBRANCE.pdf | 8 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 1.pdf | 8 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 2.pdf | 8 Mar 2021 |
| Declaration in FORM BFile: FORM V B.pdf | 8 Mar 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Suresh.pdf | 8 Mar 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE.pdf | 8 Mar 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CER.PDF | 8 Mar 2021 |
| Proforma of Allotment letterFile: Allotment Letter-Omkar Towers.pdf | 8 Mar 2021 |
| Layout approvalFile: LAY OUT PLAN.pdf | 6 Mar 2021 |
| PAN CardFile: OMKAR BUILDCON-PAN CARD.pdf | 6 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: LAY OUT PLAN.pdf | 6 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: TOWERS COMMENCEMENT_compressed.pdf | 6 Mar 2021 |
| Proforma of Allotment letterFile: Omkar Towers-Rera Draft.pdf | 6 Mar 2021 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| OMKAR PRIDE APT | Rameshwar nagar sobha bachhav layout near kalanagar Dindori road Mashrul Meri | 20 | Completed | May 2017 | May 2017 |
| OMKAR RESIDENCY APT | NEAR A T PAWAR ASHRAM SHALA BOARGAD | 37 | Completed | Feb 2015 | Feb 2015 |
| OMKAR NIWAS APT | PRABHAT NAGAR DINDORI ROAD MHASRUL | 12 | Completed | Jan 2015 | Jan 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep OMKAR TOWERS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OPP AUDUMBER LAWNS4,100+ in Nashik
LOTUS CAPITAL
BORA REALTY LLP
SHREE KALIKA PLAZA
DEEPAK KALYANJI CHANDE
Shreeji Celestia
SHREEJI LIFE SPACE
BUSINESS PLUS
MANGO ESTTATE
Iconic Business Center Dwarka
BAGAD PROPERTIES
NAKSHTRA AVENUE
SHYAM DEVELOPERS
See every Nashik project, with the district possession charts
Builder: OMKAR BUIDCON
OMKAR BUIDCON has 3 registrations on MahaRERA, including OMKAR DEEP and OMKAR PARK. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if OMKAR TOWERS is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OMKAR TOWERS?
The registered promoter entity is OMKAR BUIDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OMKAR TOWERS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for OMKAR TOWERS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OMKAR TOWERS?
The professionals named in the filing: Architect: SURESH PATEL; Engineer: SUNIL PATEL; Chartered Accountant: NANDKISHOR D PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OMKAR TOWERS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback