BUSINESS PLUS

By MANGO ESTTATE

RG-MH-13265 · RERA P51600024000 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 15 months from the original
7 of 11Construction stages donefurthest along: Internal walls, 98%
179 of 182Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 172 documents Report an error

BUSINESS PLUS is a Commercial project by MANGO ESTTATE in Nashik, Maharashtra, registered with MahaRERA as P51600024000 on 14 Jan 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 15 months from the original filing. 3 of the 182 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameBUSINESS PLUS
  • TypeCommercial
  • Location
    • MUMBAI NAKA
    • NEAR HOTEL SANDIP NASHIK
    • Nashik (M Corp.)
    • Nashik
    • 422001
  • Pincode422001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600024000
  • ReraGenie IDRG-MH-13265

Builder

  • NameMANGO ESTTATE
  • Entity typePartnership
  • PartnersSUNIL HARINARAYAN JAJU, VINAY PRAKASH SANKLECHA, MINAL TUSHAR SANKLECHA, YASH RAJIV SHAH, PRADYUMNA MUKUND KOKIL

Key dates

this monthRegisteredJan 2020First promiseSep 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jan 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Sep 2025)
  • Buildings1 building record
  • Documents filed172 files

Current status

2%3 of 182 units booked
98.0%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUSINESS PLUSNA1070182182

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

BUSINESS PLUS: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes97%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes75%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed199

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots199
Closed/Covered183
Open Space16

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,050 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Sep 2025
LandownerVillageDistrict
ANIL LAXMAN JANMALINashikNashik
BHIMASHANKAR LAXMAN JANMALINashikNashik
DEVENDRA JAGANATH JANMALINashikNashik
DINKAR LAXMAN JANMALINashikNashik
JAYANT JAGANATH JANMALINashikNashik
PUSHAPA JAGANATH JANMALINashikNashik
SHRIKRUSHANA LAXMAN JANMALINashikNashik

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI15562.1
Proposed, not sanctioned12,786 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHOSALA MILITERY SCHOL COLLEGE ROAD NASHIK
Estimated costRs 35.00 cr
Cost incurredRs 34.31 cr
Work done98.03%
BuildingWingEstimatedIncurred
BUSINESS PLUSNARs 33.00 crRs 32.35 cr
-NARs 2.00 crRs 1.96 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT M KUMATH M KUMATH
EngineerLALIT POPATLAL CHHAJED POPATLAL CHHAJED
Chartered AccountantKARAN MAHALE
Chartered AccountantSANKET SANGALE S SANGALE
PartnerRole in project
MANGO ESTTATE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27102518176Sep 2025 → Dec 2026

Reason as filed by the promoterALMOST PROJECT 98% READY REASON FOR DELAY The delay in the completion of the project has been primarily due to unforeseen circumstances beyond our control, which have significantly impacted our construction schedule and overall progress

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed172

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 172 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 .pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 .pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 .pdf20 Jul 2026
Withdrawal Update Form 1File: From 1.pdf13 May 2026
Withdrawal Update Form 2File: From 2.pdf13 May 2026
Withdrawal Update Form 3File: From 3.pdf13 May 2026
Withdrawal Update Form 1File: FRom 1.pdf23 Feb 2026
Withdrawal Update Form 1File: Architect certificate.pdf23 Feb 2026
Withdrawal Update Form 1File: FRom 1.pdf23 Feb 2026
Withdrawal Update Form 2File: From 2.pdf23 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf23 Feb 2026
Withdrawal Update Form 2File: From 2.pdf23 Feb 2026
Withdrawal Update Form 3File: Form 3 .pdf23 Feb 2026
Withdrawal Update Form 3File: Mango Form 3.pdf23 Feb 2026
Withdrawal Update Form 3File: Form 3 .pdf23 Feb 2026
Withdrawal Update Form 1File: Architect Certificate1.pdf27 Nov 2025
Withdrawal Update Form 1File: Architect Certificate1.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineers Certificate.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineers Certificate.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 Mango Esttate3_compressed.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 Mango Esttate3_compressed.pdf27 Nov 2025
Form 2A (FY 2024-2025)File: Form-2A Engineers Certificate.pdf19 Nov 2025
Withdrawal Update Form 1File: Architect Certificate.pdf27 Oct 2025
Withdrawal Update Form 2File: Eingeer Certificate.pdf27 Oct 2025
Withdrawal Update Form 3File: From 3 compressed.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Mango Esttate .pdf4 Oct 2025
Withdrawal Update Form 1File: Architect certificate.pdf29 Sep 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf29 Sep 2025
Withdrawal Update Form 3File: Mango Form 3.pdf29 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold - Mango Esttate_compressed.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mango from 3 final.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Mango Sold Unsold.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 mango esttate (2)_compressed.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 .pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mango Esttate (Q1) Architect Certificate.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mango Esttate (Q1) Engineer Certificate.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: mango Sold Unsold.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: mango Form 3_compressed.pdf12 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form -2A.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance certificate.pdf1 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate1.pdf1 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Q4.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q4.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Q3.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 31 12 2023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mango Form 3_compressed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mango Architect Certificate.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate .pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Mango Sold Unsold.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mango-1-7.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Mango-8-14.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Mango Estates Signed.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: Mango Estates - Sold Inventory.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca Certificate1.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca certificate2.pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mango Architect.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: mango Enginer.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer s Certificate.pdf16 Sep 2023
Disclosure of sold/ booked inventoryFile: Mango Esttate Sold Unsold Disclosure Signed_compressed.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mango Esttate.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mango Esttate1.pdf16 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf23 Feb 2023
Disclosure of sold/ booked inventoryFile: Mango Esttate Sold Unsold Inventory_compressed.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mango Esttate Form 3_compressed-1-4.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mango Esttate Form 3_compressed-5-8.pdf23 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mango Esttate Form 3_compressed-9-11.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 30 09 2022.pdf25 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERTIFICATE.pdf25 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mango Esttate (Form 3)_compressed-1-4.pdf25 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mango Esttate (Form 3)_compressed-5-8.pdf25 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mango Esttate (Form 3)_compressed-9-11.pdf25 Dec 2022

How this compares with Nashik

2%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 15 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BUSINESS PLUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR HOTEL SANDIP NASHIK4,100+ in Nashik

2 kmBUSINESS PLUSCompleted 197Lapsed / revoked 42Other 108Dot size: filed unitsN

Filed coordinates, straight-line distance. 347 registered projects within 2 km.

Builder: MANGO ESTTATE

MANGO ESTTATE has 1 registration on MahaRERA, including BUSINESS PLUS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if BUSINESS PLUS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BUSINESS PLUS?

The registered promoter entity is MANGO ESTTATE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BUSINESS PLUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BUSINESS PLUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BUSINESS PLUS?

The professionals named in the filing: Architect: SUMIT M KUMATH M KUMATH; Engineer: LALIT POPATLAL CHHAJED POPATLAL CHHAJED; Chartered Accountant: KARAN MAHALE; Chartered Accountant: SANKET SANGALE S SANGALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BUSINESS PLUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BUSINESS PLUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BUSINESS PLUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.