Registered No litigation declared Residential / Group Housing project

Omkar Nagar

By A. V. Infratech

RG-MH-19580 · RERA P50400078532 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Wardha registration emailed to you, free during the pilot beta.
Mar 2034Possession promisedno revision filed
0 of 154Construction stages doneacross 14 buildings; furthest along: Excavation, 50%
169 of 169Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

Omkar Nagar is a Residential / Group Housing project by A. V. Infratech in Wardha, Maharashtra, registered with MahaRERA as P50400078532 on 21 Dec 2024. Possession is promised by 31 Mar 2034. 0 of the 169 units on this registration are recorded sold or booked, and 0 of 154 construction stages are filed complete.

At a glance

Project

  • NameOmkar Nagar
  • TypeResidential / Group Housing
  • Location
    • Pimpalgaon
    • Mouza- Pimpalgaon
    • Pimpalgaon (534463)
    • Hinganghat
    • Wardha
    • 442301
  • Pincode442301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50400078532
  • ReraGenie IDRG-MH-19580

Builder

  • NameA. V. Infratech
  • Entity typeOthers
  • ProprietorYadav Khatanmal Jeswani

Key dates

this monthRegisteredDec 2024PromisedMar 2034

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Dec 2024
  • Promised completion31 Mar 2034
  • Revised completionNone
  • Buildings14 building records
  • Documents filed75 files

Current status

0%0 of 169 units booked
3.6%Work done, per cost certificate

Figures as on 4 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -14NA20505
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 13NA2010010
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -12NA1017017
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block-11NA1022022
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 10NA10909
Proposed Construction Of Residential Housing Scheme For AHP-PPP Model PMAY Scheme -Block 9NA1020020
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 8NA1015015
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block 7NA1020020
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme-Block 6NA1012012
Proposed construction Of Residential Housing Scheme for AHP-PPP model PMAY Scheme- Block 5NA1010010
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 4NA10404
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 3NA10404
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme- Block 2NA2012012
Proposed Construction of Residential Housing Scheme For AHP-PPP model PMAY Scheme-Block 1NA22909

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building14

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Excavation, at 50%.

Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -140%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 130%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -121%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block-1114%
ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth35%
Stilt Floor0%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 100%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction Of Residential Housing Scheme For AHP-PPP Model PMAY Scheme -Block 90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block 70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme-Block 60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed construction Of Residential Housing Scheme for AHP-PPP model PMAY Scheme- Block 50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme- Block 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Proposed Construction of Residential Housing Scheme For AHP-PPP model PMAY Scheme-Block 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed204

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots204
Open Space204
BuildingOpen SpaceTotal
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -1488
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 131010
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -122020
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block-112424
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 101111
Proposed Construction Of Residential Housing Scheme For AHP-PPP Model PMAY Scheme -Block 92222
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 81717
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block 72222
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme-Block 61313
Proposed construction Of Residential Housing Scheme for AHP-PPP model PMAY Scheme- Block 51111
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 455
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 355
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme- Block 22020
Proposed Construction of Residential Housing Scheme For AHP-PPP model PMAY Scheme-Block 11616

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,622 sq m
Land owned byThe promoter
Named landownersNone
Declared on27 May 2025

Approvals and building plan

Sanctioning authorityMaharashtra Housing And Area Development Authority
Permissible FSI8404.14
Proposed, not sanctioned8,404 sq m
Buildings approved14
Buildings sanctioned14

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHINGANGHAT PLOT NO. 225, 226, MPLH NO.82, NAZUL SHEET NO. 27, BLOCK NO. 11 NEW SHIVAJI WARD HINGANGHAT MAHARASHTRA
Estimated costRs 18.50 cr
Cost incurredRs 67.20 lakh
Work done3.63%
BuildingWingEstimatedIncurred
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme- Block 2NARs 2.23 cr-
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block-11NARs 2.05 cr-
Proposed Construction Of Residential Housing Scheme For AHP-PPP Model PMAY Scheme -Block 9NARs 1.86 cr-
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block 7NARs 1.86 cr-
Proposed Construction of Residential Housing Scheme For AHP-PPP model PMAY Scheme-Block 1NARs 1.67 crRs 67.20 lakh
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -12NARs 1.58 cr-
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 8NARs 1.40 cr-
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 13NARs 1.24 cr-
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme-Block 6NARs 1.12 cr-
Proposed construction Of Residential Housing Scheme for AHP-PPP model PMAY Scheme- Block 5NARs 93.19 lakh-
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 10NARs 83.87 lakh-
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -14NARs 77.51 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAlok Lunia
EngineerDhiraj D Jeswani Deepak Jeswani
Chartered AccountantCA Abhinav Welekar
Chartered AccountantApj & Associates
Chartered AccountantPravin Dhiran & Co.
PartnerRole in project
A. V. Infratech-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2034

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 new.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf4 Jun 2026
Withdrawal Update Form 3File: form 3 new.pdf4 Jun 2026
Withdrawal Update Form 1File: Form - 1.pdf29 May 2026
Withdrawal Update Form 2File: Form - 2.pdf29 May 2026
Withdrawal Update Form 3File: Form-3 30-09-2025.pdf29 May 2026
Withdrawal Update Form 1File: Form-1 30-06-2025.pdf14 Nov 2025
Withdrawal Update Form 1File: Form-1 30-09-2025 N.pdf14 Nov 2025
Withdrawal Update Form 2File: Form-2 30-06-2025.pdf14 Nov 2025
Withdrawal Update Form 2File: Form-2 30-09-2025.pdf14 Nov 2025
Withdrawal Update Form 3File: Form -3 30-06-2025.pdf14 Nov 2025
Withdrawal Update Form 3File: Form-3 30-09-2025.pdf14 Nov 2025
Form 1File: Self Declaration 31-12-2024.pdf4 Jul 2025
Form 2File: Self Declaration 31-12-2024.pdf4 Jul 2025
Form 3File: Self Declaration 31-12-2024.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Self Declaration 31-12-2024.pdf4 Jul 2025
Form 5 (FY 2024-2025)File: Form-5 31-03-2025 Sign.pdf30 Jun 2025
Form 1File: Form-1 Architect Certificate Sign 31-03-2025.pdf21 Jun 2025
Form 3File: Form-3_31-03-2025 Sign.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure-29 31-03-2025.pdf21 Jun 2025
Form 2File: Form-2 31-03-2025.pdf21 Jun 2025
Copy of the legal title reportFile: 4_Search report pimpalgaon - Copy.pdf9 Dec 2024
Proforma of Agreement for saleFile: 9_ATS Signed.pdf9 Dec 2024
Other - TechnicalFile: 17_Declaration about one plot.pdf14 Nov 2024
Other - TechnicalFile: CC mail.pdf14 Nov 2024
Building plan approvalFile: 10_Map 13.pdf12 Nov 2024
Building plan approvalFile: 10_Map 12.pdf12 Nov 2024
Building plan approvalFile: 10_Map 11.pdf12 Nov 2024
Building plan approvalFile: 10_Map 10.pdf12 Nov 2024
Building plan approvalFile: 10_Map 9.pdf12 Nov 2024
Building plan approvalFile: 10_Map 8.pdf12 Nov 2024
Building plan approvalFile: 10_Map 7.pdf12 Nov 2024
Building plan approvalFile: 10_Map 6.pdf12 Nov 2024
Building plan approvalFile: 10_Map 5.pdf12 Nov 2024
Building plan approvalFile: 10_Map 4.pdf12 Nov 2024
Building plan approvalFile: 10_Map 3.pdf12 Nov 2024
Building plan approvalFile: 10_Map 2.pdf12 Nov 2024
Building plan approvalFile: 10_Map 1.pdf12 Nov 2024
Layout approvalFile: 10_Map 1.pdf12 Nov 2024
PAN CardFile: PAN Card.pdf12 Nov 2024
Details of encumbrances concerned to FinanceFile: 5A_Financial Encumbrance.pdf12 Nov 2024
Details of encumbrances concerned to FinanceFile: 5B_Legal Encumbrance.pdf12 Nov 2024
Copy of Layout Approval (in case of layout)File: 10_Map 1.pdf12 Nov 2024
Proforma of Allotment letterFile: 8_Allotment Letter.pdf12 Nov 2024
Declaration in FORM BFile: 6_Form B.pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1.pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 _omkar Nagar.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2.pdf12 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 7_CC Building permit Pmay.pdf12 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 7_NA Order.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 8.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 1.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 2.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 3.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 4.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 5.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 6.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 7.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 9.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 10.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 11.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 12.pdf12 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10_Map 13.pdf12 Nov 2024
Other - LegalFile: 20_Sale Deed 1 - Copy.pdf12 Nov 2024
Other - LegalFile: 20_sale deed 2 - Copy.pdf12 Nov 2024
Declaration about Commencement CertificateFile: 12_DECLARATION ABOUT COMMENCEMENT cERTIFICATE.pdf12 Nov 2024
CERSAI detailsFile: 18_Cersai Declaration.pdf12 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 14_A_Separate bank account declaration.pdf12 Nov 2024
Deviation Report with respect to Allotment letterFile: 15_Deviation to Allotment Letter.pdf12 Nov 2024
Details of encumbrances concerned to LegalFile: 5A_Financial Encumbrance.pdf12 Nov 2024
Details of encumbrances concerned to LegalFile: 5B_Legal Encumbrance.pdf12 Nov 2024
Deviation Report with respect to model copy of AgreementFile: 13_Deviation to ATS.pdf12 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 16_Disclosure of Interest.pdf12 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 14_B_Bank Letter.pdf12 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: 19_Disclosure of Secured Unsecured Loan.pdf12 Nov 2024

How this compares with Wardha

0%of this project is bookeddistrict median 0%
5%of Wardha projects moved their completion datethis one has not
18%of Wardha registrations have lapsed or been cancelledthis one is on the register

Computed across the 290+ Wardha projects on ReraGenie, from their own filings.

Keep Omkar Nagar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mouza- Pimpalgaon290+ in Wardha

Builder: A. V. Infratech

A. V. Infratech has 1 registration on MahaRERA, including Omkar Nagar. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Wardha district page.

Frequently asked questions

What are my rights if Omkar Nagar is delayed beyond 31 Mar 2034?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Omkar Nagar?

The registered promoter entity is A. V. Infratech, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Omkar Nagar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Omkar Nagar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Omkar Nagar?

The professionals named in the filing: Architect: Alok Lunia; Engineer: Dhiraj D Jeswani Deepak Jeswani; Chartered Accountant: CA Abhinav Welekar; Chartered Accountant: Apj & Associates; Chartered Accountant: Pravin Dhiran & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Omkar Nagar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Omkar Nagar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Omkar Nagar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.