Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Wardha registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Omkar Nagar is a Residential / Group Housing project by A. V. Infratech in Wardha, Maharashtra, registered with MahaRERA as P50400078532 on 21 Dec 2024. Possession is promised by 31 Mar 2034. 0 of the 169 units on this registration are recorded sold or booked, and 0 of 154 construction stages are filed complete.
At a glance
Project
- NameOmkar Nagar
- TypeResidential / Group Housing
- Location
- Pimpalgaon
- Mouza- Pimpalgaon
- Pimpalgaon (534463)
- Hinganghat
- Wardha
- 442301
- Pincode442301
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50400078532
- ReraGenie IDRG-MH-19580
Builder
- NameA. V. Infratech
- Entity typeOthers
- ProprietorYadav Khatanmal Jeswani
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Dec 2024
- Promised completion31 Mar 2034
- Revised completionNone
- Buildings14 building records
- Documents filed75 files
Current status
Figures as on 4 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -14 | NA | 2 | 0 | 5 | 0 | 5 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 13 | NA | 2 | 0 | 10 | 0 | 10 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -12 | NA | 1 | 0 | 17 | 0 | 17 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block-11 | NA | 1 | 0 | 22 | 0 | 22 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 10 | NA | 1 | 0 | 9 | 0 | 9 |
| Proposed Construction Of Residential Housing Scheme For AHP-PPP Model PMAY Scheme -Block 9 | NA | 1 | 0 | 20 | 0 | 20 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 8 | NA | 1 | 0 | 15 | 0 | 15 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block 7 | NA | 1 | 0 | 20 | 0 | 20 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme-Block 6 | NA | 1 | 0 | 12 | 0 | 12 |
| Proposed construction Of Residential Housing Scheme for AHP-PPP model PMAY Scheme- Block 5 | NA | 1 | 0 | 10 | 0 | 10 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 4 | NA | 1 | 0 | 4 | 0 | 4 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 3 | NA | 1 | 0 | 4 | 0 | 4 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme- Block 2 | NA | 2 | 0 | 12 | 0 | 12 |
| Proposed Construction of Residential Housing Scheme For AHP-PPP model PMAY Scheme-Block 1 | NA | 2 | 2 | 9 | 0 | 9 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building14
As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 154 construction stages are filed complete across 14 buildings. The stage furthest along is Excavation, at 50%.
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -140%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 130%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -121%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 10% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block-1114%
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 35% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 35% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 100%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction Of Residential Housing Scheme For AHP-PPP Model PMAY Scheme -Block 90%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 80%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block 70%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme-Block 60%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed construction Of Residential Housing Scheme for AHP-PPP model PMAY Scheme- Block 50%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme- Block 20%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed Construction of Residential Housing Scheme For AHP-PPP model PMAY Scheme-Block 10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed204
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -14 | 8 | 8 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 13 | 10 | 10 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -12 | 20 | 20 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block-11 | 24 | 24 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 10 | 11 | 11 |
| Proposed Construction Of Residential Housing Scheme For AHP-PPP Model PMAY Scheme -Block 9 | 22 | 22 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 8 | 17 | 17 |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block 7 | 22 | 22 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme-Block 6 | 13 | 13 |
| Proposed construction Of Residential Housing Scheme for AHP-PPP model PMAY Scheme- Block 5 | 11 | 11 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 4 | 5 | 5 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 3 | 5 | 5 |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme- Block 2 | 20 | 20 |
| Proposed Construction of Residential Housing Scheme For AHP-PPP model PMAY Scheme-Block 1 | 16 | 16 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme- Block 2 | NA | Rs 2.23 cr | - |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block-11 | NA | Rs 2.05 cr | - |
| Proposed Construction Of Residential Housing Scheme For AHP-PPP Model PMAY Scheme -Block 9 | NA | Rs 1.86 cr | - |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme - Block 7 | NA | Rs 1.86 cr | - |
| Proposed Construction of Residential Housing Scheme For AHP-PPP model PMAY Scheme-Block 1 | NA | Rs 1.67 cr | Rs 67.20 lakh |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -12 | NA | Rs 1.58 cr | - |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 8 | NA | Rs 1.40 cr | - |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 13 | NA | Rs 1.24 cr | - |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme-Block 6 | NA | Rs 1.12 cr | - |
| Proposed construction Of Residential Housing Scheme for AHP-PPP model PMAY Scheme- Block 5 | NA | Rs 93.19 lakh | - |
| Proposed Construction of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block 10 | NA | Rs 83.87 lakh | - |
| Proposed Construction Of Residential Housing Scheme for AHP-PPP Model PMAY Scheme -Block -14 | NA | Rs 77.51 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Alok Lunia |
| Engineer | Dhiraj D Jeswani Deepak Jeswani |
| Chartered Accountant | CA Abhinav Welekar |
| Chartered Accountant | Apj & Associates |
| Chartered Accountant | Pravin Dhiran & Co. |
| Partner | Role in project |
|---|---|
| A. V. Infratech | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2034
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 new.pdf | 4 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 4 Jun 2026 |
| Withdrawal Update Form 3File: form 3 new.pdf | 4 Jun 2026 |
| Withdrawal Update Form 1File: Form - 1.pdf | 29 May 2026 |
| Withdrawal Update Form 2File: Form - 2.pdf | 29 May 2026 |
| Withdrawal Update Form 3File: Form-3 30-09-2025.pdf | 29 May 2026 |
| Withdrawal Update Form 1File: Form-1 30-06-2025.pdf | 14 Nov 2025 |
| Withdrawal Update Form 1File: Form-1 30-09-2025 N.pdf | 14 Nov 2025 |
| Withdrawal Update Form 2File: Form-2 30-06-2025.pdf | 14 Nov 2025 |
| Withdrawal Update Form 2File: Form-2 30-09-2025.pdf | 14 Nov 2025 |
| Withdrawal Update Form 3File: Form -3 30-06-2025.pdf | 14 Nov 2025 |
| Withdrawal Update Form 3File: Form-3 30-09-2025.pdf | 14 Nov 2025 |
| Form 1File: Self Declaration 31-12-2024.pdf | 4 Jul 2025 |
| Form 2File: Self Declaration 31-12-2024.pdf | 4 Jul 2025 |
| Form 3File: Self Declaration 31-12-2024.pdf | 4 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Self Declaration 31-12-2024.pdf | 4 Jul 2025 |
| Form 5 (FY 2024-2025)File: Form-5 31-03-2025 Sign.pdf | 30 Jun 2025 |
| Form 1File: Form-1 Architect Certificate Sign 31-03-2025.pdf | 21 Jun 2025 |
| Form 3File: Form-3_31-03-2025 Sign.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure-29 31-03-2025.pdf | 21 Jun 2025 |
| Form 2File: Form-2 31-03-2025.pdf | 21 Jun 2025 |
| Copy of the legal title reportFile: 4_Search report pimpalgaon - Copy.pdf | 9 Dec 2024 |
| Proforma of Agreement for saleFile: 9_ATS Signed.pdf | 9 Dec 2024 |
| Other - TechnicalFile: 17_Declaration about one plot.pdf | 14 Nov 2024 |
| Other - TechnicalFile: CC mail.pdf | 14 Nov 2024 |
| Building plan approvalFile: 10_Map 13.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 12.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 11.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 10.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 9.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 8.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 7.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 6.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 5.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 4.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 3.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 2.pdf | 12 Nov 2024 |
| Building plan approvalFile: 10_Map 1.pdf | 12 Nov 2024 |
| Layout approvalFile: 10_Map 1.pdf | 12 Nov 2024 |
| PAN CardFile: PAN Card.pdf | 12 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: 5A_Financial Encumbrance.pdf | 12 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: 5B_Legal Encumbrance.pdf | 12 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 10_Map 1.pdf | 12 Nov 2024 |
| Proforma of Allotment letterFile: 8_Allotment Letter.pdf | 12 Nov 2024 |
| Declaration in FORM BFile: 6_Form B.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 _omkar Nagar.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2.pdf | 12 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 7_CC Building permit Pmay.pdf | 12 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 7_NA Order.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 8.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 1.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 2.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 3.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 4.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 5.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 6.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 7.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 9.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 10.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 11.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 12.pdf | 12 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10_Map 13.pdf | 12 Nov 2024 |
| Other - LegalFile: 20_Sale Deed 1 - Copy.pdf | 12 Nov 2024 |
| Other - LegalFile: 20_sale deed 2 - Copy.pdf | 12 Nov 2024 |
| Declaration about Commencement CertificateFile: 12_DECLARATION ABOUT COMMENCEMENT cERTIFICATE.pdf | 12 Nov 2024 |
| CERSAI detailsFile: 18_Cersai Declaration.pdf | 12 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 14_A_Separate bank account declaration.pdf | 12 Nov 2024 |
| Deviation Report with respect to Allotment letterFile: 15_Deviation to Allotment Letter.pdf | 12 Nov 2024 |
| Details of encumbrances concerned to LegalFile: 5A_Financial Encumbrance.pdf | 12 Nov 2024 |
| Details of encumbrances concerned to LegalFile: 5B_Legal Encumbrance.pdf | 12 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: 13_Deviation to ATS.pdf | 12 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 16_Disclosure of Interest.pdf | 12 Nov 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 14_B_Bank Letter.pdf | 12 Nov 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: 19_Disclosure of Secured Unsecured Loan.pdf | 12 Nov 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Wardha
Computed across the 290+ Wardha projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Omkar Nagar on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mouza- Pimpalgaon290+ in Wardha
Subhash Residency
Abhijit Subhash Bidkar and Amol Subhash Bi
Baramati City
ATUL NAMDEO WANDILE
KESARIYA PARK
RAKESH MOHANRAO MADE
baramati city
MAHESH SHANKARRAO GULHANE
SAHARA TOWN
HARE KRISHNA LAND DEVELOPERS
NANO PARK-2
SAWAN JAGDISH MIHANI
See every Wardha project, with the district possession charts
Builder: A. V. Infratech
A. V. Infratech has 1 registration on MahaRERA, including Omkar Nagar. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Wardha district page.
Frequently asked questions
What are my rights if Omkar Nagar is delayed beyond 31 Mar 2034?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Omkar Nagar?
The registered promoter entity is A. V. Infratech, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Omkar Nagar?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Omkar Nagar?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Omkar Nagar?
The professionals named in the filing: Architect: Alok Lunia; Engineer: Dhiraj D Jeswani Deepak Jeswani; Chartered Accountant: CA Abhinav Welekar; Chartered Accountant: Apj & Associates; Chartered Accountant: Pravin Dhiran & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Omkar Nagar?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback