Home / Browse projects / Pune, Maharashtra / NOTTING HILLS PHASE II

Completed No litigation declared Residential / Group Housing project

NOTTING HILLS PHASE II

By Jaikul Associates

RG-MH-21448 · RERA P52100029445 · Last updated on MahaRERA portal: 13 Feb 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
46 of 55Construction stages doneacross 5 buildings; furthest along: Stilt Floor, 0%
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

NOTTING HILLS PHASE II is a Residential / Group Housing project by Jaikul Associates in Pune, Maharashtra, registered with MahaRERA as P52100029445 on 29 May 2021. The registration is recorded completed; possession was promised by 1 Apr 2024.

At a glance

Project

  • NameNOTTING HILLS PHASE II
  • TypeResidential / Group Housing
  • Location
    • D Y PATIL COLLEGE ROAD
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100029445
  • ReraGenie IDRG-MH-21448

Builder

  • NameJaikul Associates
  • Entity typeOthers
  • Named personsVikas Kulkarni, Sandeep Kulkarni, RISHABH JAIN
  • Other registrations4 more →
  • Completed5 of 5

Key dates

this monthRegisteredMay 2021PromisedApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 May 2021
  • Promised completion1 Apr 2024
  • Revised completionNone
  • Buildings5 building records
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NOTTING HILLS PHASE IINA20000
NOTTING HILLS PHASE IINA20000
NOTTING HILLS PHASE IINA20000
NOTTING HILLS PHASE IINA20000
NOTTING HILLS PHASE IINA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 13 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

46 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Stilt Floor, at 0%.

NOTTING HILLS PHASE II91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NOTTING HILLS PHASE II82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NOTTING HILLS PHASE II82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NOTTING HILLS PHASE II82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NOTTING HILLS PHASE II82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
NOTTING HILLS PHASE II11
NOTTING HILLS PHASE II11
NOTTING HILLS PHASE II11
NOTTING HILLS PHASE II11
NOTTING HILLS PHASE II11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,614 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8758.66
Proposed, not sanctioned7,759 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMODEL COLONY NEAR OM SUPER MARKET SHIVAJI NAGAR PUNE 411016

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVINASH ANNASAHEB PATIL
EngineerMILIND BHOITE
Chartered AccountantBRIJ MANTRI & COMPANY
PartnerRole in project
Jaikul Associates-

Litigation declared2

CaseCourtStatus
29/2009CIVIL JUDGE JUNIOR DIVISION PIMPRI PUNEPENDING FOR EVIDENCE
225/2009HIGH COURT MUMBAIPENDING FOR FINAL HEARING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jun 2023

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: NOTTING HILLS SOCIETY REG CERTIFICATE.pdf13 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C A CERT NOTTING HILL PH II 01112023.pdf10 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: qulity Noting hill ph2.pdf7 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHI CERT NOTTING HILL PH II AND COMPLETION B1 B2.pdf30 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: ARCHI CERT NOTTING HILL PH II AND COMPLETION B1 B2.pdf27 Jun 2023
Other - TechnicalFile: ARCHI CERT NOTTING HILL PH II AND COMPLETION B1 B2.pdf27 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: noting hill ph 2 QUALITY.pdf12 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: JKA Audit ReportNotting Hill 20192020.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT NOTTING HILL PH II 31122022.pdf10 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT NOTTING HILL PH II 31122022.pdf10 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QTY ASSURANCE CERT NOTTING HILL PH II 31122022.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 NOTTING HILL PH II 21112022.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Notting Hill Phase II Quality.pdf14 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: qulity asu noting hill.pdf20 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: qulity noting hill.pdf12 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Notting Hill Phase II form 3.pdf12 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QTY ASSURANCE CERT NOTTING HILL PH II 31122021.pdf6 Jan 2022
CERSAI detailsFile: Jaikul Associates.pdf6 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: noting hill ph.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: qulity notting hill.pdf17 Jul 2021
Copy of the legal title reportFile: TITLE REPORT JAIKUL 24052021 RERA.pdf24 May 2021
Details of encumbrancesFile: SELT DECLARATION JAIKUL 24052021.pdf24 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf14 May 2021
Details of encumbrancesFile: SELF DECLARATION NOTTING HILL PH 2 13052021.pdf13 May 2021
Declaration in FORM BFile: FORM B NOTTING HILL PH 2 13052021.pdf13 May 2021
Layout approvalFile: sec 2 layout copy.pdf12 May 2021
Building plan approvalFile: SECTOR 2 row house plan 1.pdf12 May 2021
Building plan approvalFile: SECTOR 2 row house plan 2.pdf12 May 2021
PAN CardFile: JAIKUL PAN.pdf12 May 2021
Copy of the legal title reportFile: Title Report.pdf12 May 2021
Copy of Layout Approval (in case of layout)File: sec 2 layout copy.pdf12 May 2021
Building Plan Approval / NA Order for plotted developmentFile: SECTOR 2 row house plan 1.pdf12 May 2021
Building Plan Approval / NA Order for plotted developmentFile: SECTOR 2 row house plan 2.pdf12 May 2021
Commencement Certificates / NA Order for plotted developmentFile: CC SEC 2 DT 13052021.pdf12 May 2021
Proforma of Allotment letterFile: Notting Hill agreement draft.pdf12 May 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NOTTING HILLS PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHARHOLI13,700+ in Pune

Builder: Jaikul Associates

Jaikul Associates has 5 registrations on MahaRERA, including KINGSBURY PHASE I and NOTTING HILL PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NOTTING HILLS PHASE II is delayed beyond 1 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NOTTING HILLS PHASE II?

The registered promoter entity is Jaikul Associates, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NOTTING HILLS PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NOTTING HILLS PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NOTTING HILLS PHASE II?

The professionals named in the filing: Architect: AVINASH ANNASAHEB PATIL; Engineer: MILIND BHOITE; Chartered Accountant: BRIJ MANTRI & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NOTTING HILLS PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NOTTING HILLS PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NOTTING HILLS PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.