ReraGenieLog inGet a buyer report

Home / Browse projects / Mysore, Karnataka / Nithyanandhasagara 4

Registration approved Litigation declared Plotted Development project

Nithyanandhasagara 4

By ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED

RG-KA-55207 · RERA PRM/KA/RERA/1268/378/PR/091123/006392 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 125 documents Report an error

Nithyanandhasagara 4 is a Plotted Development project by ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/091123/006392 on 9 Nov 2023. Possession is promised by 20 Sep 2028.

At a glance

Project

  • NameNithyanandhasagara 4
  • TypePlotted Development
  • Location
    • MYSORE
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1268/378/PR/091123/006392
  • ReraGenie IDRG-KA-55207

Builder

  • NameESS AND ESS INFRASTRUCTUREPRIVATE LIMITED
  • Entity typeCompany
  • CINU70101KA2005PTC037964
  • Authorized SignatoryShreekaanth Daas
  • Managing DirectorShreekaanth Daas
  • DirectorsShreekaanth Daas, Prathibha B
  • Project HeadShreekaanth Daas
  • Other registrations3 more →
  • Declared earlier projects79 →

Key dates

this monthRegisteredNov 2023PromisedSep 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Nov 2023
  • Promised completion20 Sep 2028
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed125 files

Current status

24.4%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners3
LandownerVillageDistrict
Sri D. S. Lakshminarayana Rao--
Smt. H. S. Premavathi--
Sri M. V. Gopinaath--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.18 cr
Cost incurredRs 1.02 cr
Spent of the estimate24.4%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 4.18 crRs 46.51 lakh
On-site expenditure-Salaries of workers-Rs 33.80 lakh
On-site expenditure-Site Overhead-Rs 21.35 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)-Rs 24,766

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerC B Lakshman Rao
Chartered AccountantA Vishwanatha

Litigation declared1

CaseCourtStatus
171IV Additional Senior Civil Judge-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed125

As listed on the registration, under the names the promoter filed them with; the newest 80 of 125 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/091123/006392 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate Issued by Chartered Accountant Form 4.PDF15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF13 Jan 2026
Q3 2025-26 Water supply and sewage board13 Jan 2026
1. P&L Account and Balance Sheet with CA UDINFile: 1 P&L Account and Balance Sheet with CA UDIN.pdf9 Nov 2023
2. Clarification regarding Borrowing DetailsFile: 2 Clarification regarding Borrowing Details.pdf9 Nov 2023
3. Borrowing DetailsFile: 3 Borrowing Details.PDF9 Nov 2023
4. Charted Accountant certificate - Form 1File: 4 Charted Accountant certificate - Form 1.PDF9 Nov 2023
7. EC Sy No.202-1 (27-05-2015 to 28-03-2017)File: 7 EC Sy No 202-1 (27-05-2015 to 28-03-2017).pdf9 Nov 2023
8. JDA for Sy No 207-2File: 8 JDA for Sy No 207-2.pdf9 Nov 2023
9. Plot Wise Area Break up DetailsFile: 9 Plot wise area Break up Details.pdf9 Nov 2023
10. Individual plot Size, Dimension and Area DetailsFile: 10 Individual plot Size, Dimension and Area details.pdf9 Nov 2023
11. Layout Work OrderFile: 11 Layout Work Order.pdf9 Nov 2023
12. CDP MapFile: 12 CDP Map.pdf9 Nov 2023
13. KSPCB Endorsement for other projectsFile: 13 KSPCB Endorsement for other projects.pdf9 Nov 2023
14. Architect's CertificateFile: 14 Architect's Certificate.pdf9 Nov 2023
15. Project Status UpdatedFile: 15 Project Status Updated.pdf9 Nov 2023
16. Common area that is Road, CA, Park and Open spaceFile: 16 Common area that is Road, CA, Park and Open space.pdf9 Nov 2023
17. Source of water supplyFile: 17 Source of water supply.pdf9 Nov 2023
18. Cost DetailsFile: 18 Cost Details.pdf9 Nov 2023
19. Land Cost Calculation SheetFile: 19 Land Cost Calculation Sheet.pdf9 Nov 2023
20. Brief Estimated Cost of ConstructionFile: 20 Brief Estimated Cost of Construction.PDF9 Nov 2023
22. STP - Demarcated DrawingFile: 22 STP - Demarcated Drawing.pdf9 Nov 2023
23. Proforma of Allotment LetterFile: 23 ALLOTMENT LETTER.pdf9 Nov 2023
24. Project SpecificationsFile: 24 Project Specifications.PDF9 Nov 2023
Form 3File: Engineer Certificate Form 3.PDF9 Nov 2023
RTC, survey 198/2-
Mutation, survey 198/2-
Encumbrance Certificate, survey 198/2-
Conversion/Alienation Order, survey 198/2-
Sale/Title/Gift Deed, survey 198/2-
JDA, survey 198/2-
Khatha, survey 198/2-
RTC, survey 202/1-
Mutation, survey 202/1-
Encumbrance Certificate, survey 202/1-
Conversion/Alienation Order, survey 202/1-
Sale/Title/Gift Deed, survey 202/1-
JDA, survey 202/1-
Khatha, survey 202/1-
RTC, survey 207/2-
Mutation, survey 207/2-
Encumbrance Certificate, survey 207/2-
Conversion/Alienation Order, survey 207/2-
Sale/Title/Gift Deed, survey 207/2-
JDA, survey 207/2-
Khatha, survey 207/2-
Registration CertificateFile: Registration Certificate.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Form 1 - Certificate issued by Chartered Account.PDF-
Certificate issued by Engineer Form 3File: Engineer Certificate Form 3.PDF-
Project Chartered Accountant-
Project Engineer-
AffidavitFile: No Case Affidavit.PDF-
Certificate from Chartered AccountFile: Form 1 - Certificate issued by Chartered Account.PDF-
Balance Sheet 2022 - 2023File: 1 Balance Sheet FY 2021-22.pdf-
Balance Sheet 2021 - 2022File: 1 Balance Sheet FY 2021-22.pdf-
Balance Sheet 2020 - 2021File: 1 Balance Sheet FY 2020-21.pdf-
Audited Profit and Loss Statement 2022 - 2023File: 2 Profit and Loss Statement FY 2021-22.pdf-
Audited Profit and Loss Statement 2021 - 2022File: 2 Profit and Loss Statement FY 2021-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: 2 Profit and Loss Account Fy 2020-21.pdf-
Director's Report 2022 - 2023File: 3 Directors Report FY 2021-22.pdf-
Director's Report 2021 - 2022File: 3 Directors Report FY 2021-22.pdf-
Director's Report 2020 - 2021File: 3 Directors Report FY 2020-21.pdf-
Cash Flow Statement 2022 - 2023File: 4 Cash Flow Statement FY 2021-22.pdf-
Cash Flow Statement 2021 - 2022File: 4 Cash Flow Statement FY 2021-22.pdf-
Auditor's Report 2022 - 2023File: 5 Auditors Report FY 2021-22.pdf-
Auditor's Report 2021 - 2022File: 5 Auditors Report FY 2021-22.pdf-
Auditor's Report 2020 - 2021File: 5 Auditors Report FY 2020-21.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: 6 Income Tax Return Acknowledgement FY 2021-22.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: 6 Income Tax Return Acknowledgement FY 2021-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: 6 Income Tax Return Acknowledgement FY 2020-21.pdf-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

22 not delivered by the promised date4 under way, not due yet37 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
JSS 4TH SAGE BLOCK BMadapura Village andAragowdanahalli Village, VarunaHobli, Mysore Taluk, Mysore District.OngoingJun 2028Not due yet
Athmanandhasgara 6Nagawala Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingJun 2027Not due yet
KUBERANANDHASAGARA 12BMaidanahalli Village, Ilwala Hobli,Mysore Taluk & Mysore District.OngoingMar 2027Not due yet
JSS 4TH STAGE BLOCK AMadapura Village, Varuna Hobli,Mysuru Taluk & Mysuru District.OngoingMar 2027Not due yet
SHREE ENCLAVE MYSORE (iT PARK) 5Janthagalli Village, Varuna Hobli, Mysore Taluk, Mysore District.OngoingSep 2026Not delivered
Sukhanandhasagara 4Bommanhalli Village, Ilawala Hobli,Mysore Taluk & Mysore District.OngoingApr 2026Not delivered
Kuberanandhasagara Layout Phase 8Maidhanahalli Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 3Maidhanahalli Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 2Maidhanahalli Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 1Maidhanahalli Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Kuberanandhasagara Layout 11Maidhanahalli Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Kuberanandhasagara Layout 10Maidhanahalli Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 4Nagawala Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 3Nagawala Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 2Nagawala Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 1Nagawala Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara 5CNagawala Village, Ilwala Hobli ,Mysuru Taluk, Mysore District.OngoingDec 2024Not delivered
Athmanandhasagara 5BNagawala Village, Ilwala Hobli ,Mysuru Taluk, Mysore District.OngoingDec 2024Not delivered
Athmanandhasagara 5ANagawala Village, Ilwala Hobli,Mysore Taluk, Mysore District.OngoingDec 2024Not delivered
Stavya LayoutHuyilalu Village, Ilawala Hobli,Mysore Taluk and Mysore District.OngoingMay 2022Not delivered
Sree Sapthamathruka Layout Phase 4Marashettihalli Village, Varuna Hobli,Mysore Taluk, Mysore District.OngoingMay 2022Not delivered
Paramanandhasagara andSukhanandhasagara Layout Phase 1Huyilalu Village, Ilawala Hobli,Mysore Taluk and Mysore District.OngoingMay 2022Not delivered
Paramanandhasagara Layout Phase 2Huyilalu village, Ilwala hobli,, Mysoretaluk & district.OngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 3Huyilalu Village, Ilawala Hobli,Mysore Taluk and Mysore District.OngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 2Huyilalu Village, Ilawala Hobli,Mysore Taluk and Mysore District.OngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 1Huyilalu Village, Ilawala Hobli,Mysore Taluk and Mysore District.OngoingMay 2022Not delivered
Venkatagiri LayoutGoruru Village, Kasaba Hobli, MysoreTaluk, Mysore District.Completed-No date filed
Venkatadri LayoutBelawadi Village, Ilawala Hobli,Mysore Taluk and Mysore District.Completed-No date filed
Svasthi RetreatMarashettihalli Village, Varuna Hobli,Mysuru Taluk & Mysuru District.Completed-No date filed
Sree Sapthamathruka Layout Phase1/AYandahalli Village, Varuna Hobli,Mysore Taluk and Mysore District.Completed-No date filed
Sree Sapthamathruka Layout Phase 3Yandahalli & Madapura Village,Varuna Hobli, Mysore Taluk andMysore District.Completed-No date filed
Sree Sapthamathruka Layout Phase 2Yandahalli & Madapura Village,Varuna Hobli, Mysore Taluk andMysore District.Completed-No date filed
Sree Sapthamathruka Layout Phase 1Yandahalli Village, Varuna Hobli,Mysore Taluk and Mysore District.Completed-No date filed
Sree Sapthamathruka 6Janthagalli Village, Varuna Hobli,Mysuru Taluk & Mysuru District.Completed-No date filed
Sree Sapthamathruka 1BMadapura Village, Varuna Hobli,Mysuru Taluk & Mysuru District.Completed-No date filed
Sourish LayoutMadagalli Village, Ilawala Hobli,Mysore Taluk and Mysore District.Completed-No date filed
Silicon Echo City 2Belawadi Village, Ilwala Hobli,Mysuru Taluk & Mysuru District.Completed-No date filed
Silicon Echo City 1Belawadi Village, Ilwala Hobli,,Mysuru Taluk & Mysuru District.Completed-No date filed
Shreeshaa Hill View 5Sarakari Uttanahalli Village, VarunaHobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Shreesha Hill View Layout Phase 3Sarkari Utthanahalli Village, VarunaHobli, Mysore Taluk and Mysore District.Completed-No date filed

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep Nithyanandhasagara 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

Builder: ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED

ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED has 4 registrations on RERA Karnataka, including JSS 4TH STAGE BLOCK C and Nithyanandhasagara 4. Its filings declare 79 earlier projects, 45 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if Nithyanandhasagara 4 is delayed beyond 20 Sep 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Nithyanandhasagara 4?

The registered promoter entity is ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED, a company as per the filing. Its CIN U70101KA2005PTC037964 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Nithyanandhasagara 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Nithyanandhasagara 4?

The professionals named in the filing: Engineer: C B Lakshman Rao; Chartered Accountant: A Vishwanatha. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nithyanandhasagara 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nithyanandhasagara 4. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nithyanandhasagara 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.