ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Nithyam Phase II

Completed No litigation declared Others project

Nithyam Phase II

By G and S Associates

RG-MH-63670 · RERA P52100052791 · Last updated on MahaRERA portal: 20 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
16 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
130 of 453Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

Nithyam Phase II is a Others project by G and S Associates in Pune, Maharashtra, registered with MahaRERA as P52100052791 on 25 Sep 2023. The registration is recorded completed; possession was promised by 31 Dec 2027. 323 of the 453 units on this registration are recorded sold or booked, and 16 of 33 construction stages are filed complete.

At a glance

Project

  • NameNithyam Phase II
  • TypeOthers
  • Location
    • Gat No. 1 to 5
    • Charholi Kh
    • Khed
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052791
  • ReraGenie IDRG-MH-63670

Builder

  • NameG and S Associates
  • Entity typePartnership
  • PartnersNilesh Popatlal Gada, Popatlal Hirji Shah
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2023PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Sep 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed77 files

Current status

71%323 of 453 units booked

Figures as on 20 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nithyam Phase II - Wing C1NA121214312155
Nithyam Phase II - Wing C2NA121214312155
Nithyam Phase II - Wing C3NA12121430143

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

Nithyam Phase II - Wing C154%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Nithyam Phase II - Wing C267%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Nithyam Phase II - Wing C365%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 20 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2025
LandownerVillageDistrict
Hiraman Ramdas PagadeChakan (CT)Pune
Mahesh Vasant PagadeChakan (CT)Pune
Yogesh Ganpat PagadeChakan (CT)Pune
Dnyaneshwar DashrathChakan (CT)Pune
Subhash Bajirao PagadeChakan (CT)Pune

Approvals and building plan

Sanctioning authorityPMAY
Permissible FSI16816.31
Proposed, not sanctioned16,816 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSuhrud 28 Gulabnagar Dhankavadi Pune 411043

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCOM
ArchitectArconaid Consultants Pvt Ltd
EngineerAmit Ravindra Bandal
EngineerAkhil Shaikh
EngineerAnkush Bagade
EngineerPurushottam Dimble
Chartered AccountantParesh Sabadra
Chartered AccountantRSPH & Associates
Chartered AccountantShah Khandelwal Jain and Associates
PartnerRole in project
G and S Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Full Completion Certificate Nithyam Phase II.pdf20 Sep 2025
Form 1File: AR - Nithyam phase -2.pdf13 Sep 2025
Form 2File: ER.pdf13 Sep 2025
Form 3File: CA final.pdf13 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold 14-05-25.pdf13 Sep 2025
Form 1File: Architect Certificate March25.pdf23 Jul 2025
Form 2File: Engg Nithyam II March 25.pdf23 Jul 2025
Form 3File: Final CA Cert_Nithyam II_ March 25.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclsoure march25.pdf23 Jul 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Nithyam p II.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Cert_Nithyam II Sept 24 client sign.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enggi Certificate Nityam Phase II.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Nithyam Phase II , 2023-24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Final.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Final.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24 final Signed copy.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Final.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24 final Signed copy.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Final.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Nithyam Phase II.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate date March 24.pdf27 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate March 24.pdf27 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 24.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Sept23.pdf1 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Dec23.pdf1 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Sept23.pdf1 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate - Dec23.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- sept23.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Dec 23.pdf1 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD - UNSOLD NITHYAM PHASE II (1).pdf27 Oct 2023
Copy of the legal title reportFile: Title Report.pdf8 Sep 2023
Declaration about Commencement CertificateFile: Form D.pdf8 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration-Nithyam Phase II_1 (2 files merged).pdf8 Sep 2023
Other - LegalFile: CC.pdf8 Sep 2023
Other - TechnicalFile: CC.pdf8 Sep 2023
Layout approvalFile: master plan_rotated (1).pdf29 Aug 2023
Building plan approvalFile: master plan_rotated (1).pdf29 Aug 2023
Building plan approvalFile: parking layout.pdf29 Aug 2023
Building plan approvalFile: Ground Floor.pdf29 Aug 2023
Building plan approvalFile: plan 1.pdf29 Aug 2023
Building plan approvalFile: plan 2.pdf29 Aug 2023
Building plan approvalFile: plan 3.pdf29 Aug 2023
Building plan approvalFile: plan 4.pdf29 Aug 2023
Building plan approvalFile: plan 5.pdf29 Aug 2023
Building plan approvalFile: Plan 6.pdf29 Aug 2023
Building plan approvalFile: Plan 7.pdf29 Aug 2023
Building plan approvalFile: Plan 7.pdf29 Aug 2023
Details of encumbrances concerned to FinanceFile: No Whomsoever It May Concern.pdf29 Aug 2023
Details of encumbrances concerned to LegalFile: No Whomsoever It May Concern.pdf29 Aug 2023
Copy of Layout Approval (in case of layout)File: master plan_rotated (1).pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: master plan_rotated (1).pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: parking layout.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Ground Floor.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 1.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 2.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 3.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 4.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: plan 5.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf29 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf29 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg certificate (1).pdf29 Aug 2023
CERSAI detailsFile: CERSAI details.pdf29 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Nithyam PII_Signed.pdf29 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations-Nithyam Phase II.pdf29 Aug 2023
Proforma of Agreement for saleFile: UNIT AGREEMENT DRAFT PHASE II NITHYAM - C1 C2 C3 changes as per requirement.pdf29 Aug 2023
PAN CardFile: Firm Pan Card.pdf24 Aug 2023
Details of encumbrances concerned to FinanceFile: No Encumbrances ConceredTo Legal.pdf24 Aug 2023
Details of encumbrances concerned to LegalFile: No Encumbrances ConceredTo Legal.pdf24 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC PMAY 21 Aug.pdf24 Aug 2023
Declaration in FORM BFile: Form - B- Developer.pdf24 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest.pdf24 Aug 2023
Proforma of Allotment letterFile: Model Form Of Allotment Letter.pdf24 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviations Of The Allotment.pdf24 Aug 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf24 Aug 2023

How this compares with Pune

71%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nithyam Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Charholi Kh13,700+ in Pune

2 kmNithyam Phase IICompleted 61Lapsed / revoked 25Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: G and S Associates

G AND S ASSOCIATES has 4 registrations on MahaRERA, including KSHITHI and NITHYAM. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nithyam Phase II is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nithyam Phase II?

The registered promoter entity is G and S Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nithyam Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nithyam Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nithyam Phase II?

The professionals named in the filing: Architect: ARCOM; Architect: Arconaid Consultants Pvt Ltd; Engineer: Amit Ravindra Bandal; Engineer: Akhil Shaikh; Engineer: Ankush Bagade; Engineer: Purushottam Dimble. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nithyam Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nithyam Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nithyam Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.