Or get an email each time it changes, with the project watch
Red flags
- 5 complaints at MahaRERA
- Completion date moved by 54 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Nisarga Residency is a Residential / Group Housing project by Namoh Nature Group Builders & Developers in Ratnagiri, Maharashtra, registered with MahaRERA as P52800014956 on 15 Jan 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 54 months from the original filing. 5 complaints are on record with the regulator.
At a glance
Project
- NameNisarga Residency
- TypeResidential / Group Housing
- Location
- Khatatewadi Road
- Kherdi
- Kherdi (CT)
- Chiplun
- Ratnagiri
- 415604
- Pincode415604
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52800014956
- ReraGenie IDRG-MH-41710
Builder
- NameNamoh Nature Group Builders & Developers
- Entity typePartnership
- PartnerSandeep Yashwant Kadam
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jan 2018
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 27 Jun 2022)
- Buildings4 building records
- Documents filed48 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Nisarga Residency Wing - A | NA | 6 | 0 | 0 | 0 | 0 |
| Nisarga Residency Wing - B | NA | 6 | 0 | 0 | 0 | 0 |
| Nisarga Residency Wing - C | NA | 6 | 0 | 0 | 0 | 0 |
| Nisarga Residency Wing - D | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 21 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
29 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 90%.
Nisarga Residency Wing - A51%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 10% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Nisarga Residency Wing - B74%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Nisarga Residency Wing - C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Nisarga Residency Wing - D91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 21 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Nisarga Residency Wing - A | 8 | 8 |
| Nisarga Residency Wing - B | 4 | 4 |
| Nisarga Residency Wing - C | 2 | 2 |
| Nisarga Residency Wing - D | 8 | 8 |
Land and ownership9
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Santosh Anant Dabholkar | Kherdi (CT) | Ratnagiri |
| Sandeep Anant Dabholkar | Kherdi (CT) | Ratnagiri |
| Rajaram Krushnaji Dabholkar | Kherdi (CT) | Ratnagiri |
| Manohar Balkrishna Dabholkar | Kherdi (CT) | Ratnagiri |
| Dattaram Balkrishna Dabholkar | Kherdi (CT) | Ratnagiri |
| Vilas Balkrishna Dabholkar | Kherdi (CT) | Ratnagiri |
| Sagar Subhash Dabholkar | Kherdi (CT) | Ratnagiri |
| Sanket Subhash Dabholkar | Kherdi (CT) | Ratnagiri |
| Suvarna Subhash Dabholkar | Kherdi (CT) | Ratnagiri |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ravindra Patil |
| Partner | Role in project |
|---|---|
| Namoh Nature Group Builders & Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Health issue and financial problem work was slow
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000197003 | Viddesh Vijay Shinde | Pravin Shinde | 13/05/2021 |
| CC006000000251727 | Viddesh Shinde | Pravin Shinde | 13/09/2022 |
| CC12503150 | Vilas Nathu Bagul | Namoh Nature Group Builders & Developers | 07/09/2025 |
| CC12503152 | Anil Nathu Bagul | Namoh Nature Group Builders & Developers | 07/09/2025 |
| CC12503153 | sudhanshu dwarkanath vanage | Namoh Nature Group Builders & Developers | 07/09/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Jan 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jan 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jan 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed48
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Mar 2023.pdf | 21 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Dec 2023.pdf | 21 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Mar 2023.pdf | 21 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Dec 2023.pdf | 21 Feb 2024 |
| Certificates of CA (Form 3)File: CA Certificate March 2023.pdf | 21 Feb 2024 |
| Certificates of CA (Form 3)File: CA Certificate Dec 2023.pdf | 21 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 21 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch 1.pdf | 24 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch 2.pdf | 24 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 1.pdf | 24 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng 2.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate Form 2A.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Form 2A.pdf | 24 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold 1.pdf | 24 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold 4.pdf | 24 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200258582316_For_Asset_Based_Search_24_01_2023_23_44_30_833.pdf | 24 Jan 2023 |
| Certificates of CA (Form 3)File: Form_3_March_2022_Namoh_Nature_Group.pdf | 24 Jan 2023 |
| Certificates of CA (Form 3)File: Form_3_September_2022_Namoh_Nature_Group.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Namoh Nature_19-20.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Namo nature 20-21.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Namoh Nature 21-22.pdf | 24 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 16 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 16 Oct 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 16 Oct 2018 |
| Certificates of CA (Form 5)File: Namo Nature_Form 5.pdf | 2 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 10 May 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 10 May 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 10 May 2018 |
| Layout approvalFile: Blueprint 2.pdf | 7 Jan 2018 |
| Building plan approvalFile: Blueprint 1.pdf | 7 Jan 2018 |
| Building plan approvalFile: Blueprint 2.pdf | 7 Jan 2018 |
| PAN CardFile: PAN Card.pdf | 7 Jan 2018 |
| Copy of the legal title reportFile: Search Report 36 (20).pdf | 7 Jan 2018 |
| Copy of the legal title reportFile: Search Report 36 (21).pdf | 7 Jan 2018 |
| Details of encumbrancesFile: Encumbrance Certificate.pdf | 7 Jan 2018 |
| Copy of Layout Approval (in case of layout)File: Blueprint 2.pdf | 7 Jan 2018 |
| Building Plan Approval (IOD)File: Blueprint 1.pdf | 7 Jan 2018 |
| Building Plan Approval (IOD)File: Blueprint 2.pdf | 7 Jan 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 7 Jan 2018 |
| Declaration in FORM BFile: Form B (Promotor).pdf | 7 Jan 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 7 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 7 Jan 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 7 Jan 2018 |
| Proforma of Allotment letterFile: Proforma Sale Agreement.pdf | 7 Jan 2018 |
| OtherFile: POA 36 (20) 1.pdf | 7 Jan 2018 |
| OtherFile: POA 36 (20).pdf | 7 Jan 2018 |
| OtherFile: POA 36 (21).pdf | 7 Jan 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 48 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Nisarga Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kherdi1,100+ in Ratnagiri
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
DISHA HEIGHTS
DISHA ASSOCIATES
City Pride
D Square Builders & Developers
EKTA HEIGHTS
Ekta Developers
VENUDHAM RESIDENCY
Vrunda Vinay Date
TARANGAN
MAHESH BALA PAWAR
RUSHANG RESIDENCY
Rakesh Rajaram Chalke
See every Ratnagiri project, with the district possession charts
Builder: Namoh Nature Group Builders & Developers
Namoh Nature Group Builders & Developers has 1 registration on MahaRERA, including Nisarga Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What are my rights if Nisarga Residency is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Nisarga Residency?
The registered promoter entity is Namoh Nature Group Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Nisarga Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Nisarga Residency?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Nisarga Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Nisarga Residency?
The professionals named in the filing: Architect: Ravindra Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Nisarga Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback