Home / Browse projects / Pune, Maharashtra / Nisarg Vatika Phase II
Nisarg Vatika Phase II
RG-MH-04923 · RERA P52100020731 · Last updated on MahaRERA portal: 29 Sep 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Nisarg Vatika Phase II is a Others project by Nisarg Ventures in Pune, Maharashtra, registered with MahaRERA as P52100020731 on 7 May 2019. The registration is recorded completed; possession was promised by 30 Dec 2022.
At a glance
Project
- NameNisarg Vatika Phase II
- TypeOthers
- Location
- Dehu Alandi BRT Road
- Borhadewadi
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100020731
- ReraGenie IDRG-MH-04923
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 May 2019
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings1 building record
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NIsarg Vatika Phase II | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
NIsarg Vatika Phase II: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 29 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed21
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Kaluram Arjun Borate | Pimpri Chinchawad (M Corp.) | Pune |
| Nivrutti Arjun Borate | Pimpri Chinchawad (M Corp.) | Pune |
| Vitthal Arjun Borate | Pimpri Chinchawad (M Corp.) | Pune |
| Sanjana Kantilal Borate | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Yojana Architects prop N D Joshi |
| Engineer | Sajid G Bagwan |
| Chartered Accountant | Muttha & Lahoti |
| Partner | Role in project |
|---|---|
| Nisarg Ventures | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Aug 2022
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf | 29 Sep 2023 |
| Status of ConveyanceFile: AnyScanner_06_23_2023.pdf | 23 Jun 2023 |
| Proforma of Agreement for saleFile: Nisarg Vatika Ph-II Draft pdf.pdf | 22 Jun 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Nisarg Vatika Ph-2 Society Registration Certificate.pdf | 17 Jun 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Nisarg Ventures.PDF | 29 Mar 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Nisarg Ventures Form 04 (1).PDF | 8 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NISARG VATIKA PHASE II- FORM 5.PDF | 30 Sep 2022 |
| Other - TechnicalFile: NISARG VATIKA PHASE II- FORM 5.PDF | 28 Sep 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMP CERT V-II.pdf | 8 Aug 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMP CERT 1 VATIKA -II.pdf | 8 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.PDF | 20 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 NISARG VENTURES PHASE II.pdf | 20 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 NISARG VENTURES PHASE II.pdf | 13 Oct 2021 |
| Layout approvalFile: A.pdf | 8 Jul 2021 |
| Layout approvalFile: B.pdf | 8 Jul 2021 |
| Layout approvalFile: C.pdf | 8 Jul 2021 |
| Layout approvalFile: D.pdf | 8 Jul 2021 |
| Layout approvalFile: E.pdf | 8 Jul 2021 |
| Layout approvalFile: F.pdf | 8 Jul 2021 |
| Layout approvalFile: G.pdf | 8 Jul 2021 |
| Layout approvalFile: I.pdf | 8 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: A.pdf | 8 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: B.pdf | 8 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: C.pdf | 8 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: D.pdf | 8 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: E.pdf | 8 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: F.pdf | 8 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: G.pdf | 8 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: I.pdf | 8 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 8 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: FORMAT OF DISCLOSURE OF SOLD BOOKED INVENTORY-converted.pdf | 28 May 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 NISARG VENTURES PHASE II.pdf | 5 Feb 2021 |
| Layout approvalFile: lay out plan_compressed.pdf | 22 Jul 2019 |
| Layout approvalFile: Plan No 1.pdf | 22 Jul 2019 |
| Layout approvalFile: Plan No 1.pdf | 22 Jul 2019 |
| Layout approvalFile: Plan No 2.pdf | 22 Jul 2019 |
| Layout approvalFile: PLan No 3.pdf | 22 Jul 2019 |
| Layout approvalFile: Plan No 4.pdf | 22 Jul 2019 |
| Layout approvalFile: Plan No 5.pdf | 22 Jul 2019 |
| Layout approvalFile: Plan No 6.pdf | 22 Jul 2019 |
| Layout approvalFile: Plan No 7.pdf | 22 Jul 2019 |
| Layout approvalFile: Plan No 8.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: lay out plan_compressed.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: Plan No 1.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: Plan No 1.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: Plan No 2.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: PLan No 3.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: Plan No 4.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: Plan No 5.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: Plan No 6.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: Plan No 7.pdf | 22 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: Plan No 8.pdf | 22 Jul 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf | 22 Jul 2019 |
| Building plan approvalFile: Layout_compressed.pdf | 2 May 2019 |
| Layout approvalFile: Layout_compressed.pdf | 2 May 2019 |
| Layout approvalFile: Floor Plan_compressed.pdf | 2 May 2019 |
| Layout approvalFile: Floor Plan 2_compressed.pdf | 2 May 2019 |
| Layout approvalFile: Plan 3_compressed.pdf | 2 May 2019 |
| PAN CardFile: PAN CARD.pdf | 2 May 2019 |
| Copy of the legal title reportFile: Search report.pdf | 2 May 2019 |
| Details of encumbrancesFile: Self Declaration.pdf | 2 May 2019 |
| Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf | 2 May 2019 |
| Copy of Layout Approval (in case of layout)File: Floor Plan_compressed.pdf | 2 May 2019 |
| Copy of Layout Approval (in case of layout)File: Floor Plan 2_compressed.pdf | 2 May 2019 |
| Copy of Layout Approval (in case of layout)File: Plan 3_compressed.pdf | 2 May 2019 |
| Building Plan Approval (IOD)File: Layout_compressed.pdf | 2 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 2 May 2019 |
| Declaration in FORM BFile: Promoter Aff B Form.pdf | 2 May 2019 |
| Declaration in FORM BFile: Aff Co Promoter B Form.pdf | 2 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect certificate.pdf | 2 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf | 2 May 2019 |
| Certificates of CA (Form 3)File: FORM 3 CA Ceriticate.pdf | 2 May 2019 |
| Proforma of Allotment letterFile: Draft Agreement and Allotment Letter.pdf | 2 May 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Nisarg Vatika | Gat No 245 Borhadewadi Pune | 45 | Completed | Jun 2019 | May 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
Keep Nisarg Vatika Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borhadewadi13,700+ in Pune
Filed coordinates, straight-line distance. 209 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Nisarg Ventures
Nisarg Ventures has 2 registrations on MahaRERA, including Nisarg Vatika and Nisarg Vatika Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Nisarg Vatika Phase II is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Nisarg Vatika Phase II?
The registered promoter entity is Nisarg Ventures, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Nisarg Vatika Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Nisarg Vatika Phase II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Nisarg Vatika Phase II?
The professionals named in the filing: Architect: Yojana Architects prop N D Joshi; Engineer: Sajid G Bagwan; Chartered Accountant: Muttha & Lahoti. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Nisarg Vatika Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback