Home / Browse projects / Pune, Maharashtra / NISARG

Registered No litigation declared Residential / Group Housing project

NISARG

By WAJE & HARPALE PATIL BUILDERS

RG-MH-16536 · RERA P52100026279 · Last updated on MahaRERA portal: 16 Jan 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 40 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 40 months from the original
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

NISARG is a Residential / Group Housing project by WAJE & HARPALE PATIL BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100026279 on 4 Sep 2020. Possession is promised by 31 Dec 2027. The completion date has moved by 40 months from the original filing.

At a glance

Project

  • NameNISARG
  • TypeResidential / Group Housing
  • Location
    • URULI DEVACHI
    • Haveli
    • Pune
    • 412308
  • Pincode412308
  • RERA no.P52100026279
  • ReraGenie IDRG-MH-16536

Builder

  • NameWAJE & HARPALE PATIL BUILDERS
  • Entity typePartnership
  • PartnersYUVRAJ SUBHASH WAJE, SANTOSH MARUTI HARPLAE

Key dates

this monthRegisteredSep 2020First promiseAug 2024Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Sep 2020
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 7 Aug 2024)
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NISARG WING A AND WING BNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

NISARG WING A AND WING B: 72% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed209

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots209
Closed/Covered51
Open Space158

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,848 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
VILAS NARAYAN ADSULURULI DEVACHIPune
PRAKASH NARAYAN ADSULURULI DEVACHIPune
BALASAHEB LAXMAN ADSULURULI DEVACHIPune
POPAT LAXMAN ADSULURULI DEVACHIPune
RAMESH MAHADEV (MAHADU) ADSULURULI DEVACHIPune
PANDHARINATH YADAV ADSULURULI DEVACHIPune

Approvals and building plan

Permissible FSI3690.7
Proposed, not sanctioned3,691 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHEKRAI NAGAR, FURSUNGI, PUNE 412308

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
WAJE & HARPALE PATIL BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025516Aug 2024 → Dec 2027

Reason as filed by the promoterThe Promoter is not able to Complete the Work and also the promoter is not able to sale all Units in the given time Period due to COVID Pandemic and other reasons. The promoter has obtained the Consent for Extension of Project for more than 51% of allottees to whom the units are sold and uploded the Consent Letter with Application for Extension. Requesting you to kindly grant further Extension of the Project. As on date the promoter is making the all the project expenses.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Form 1 M21.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 Form 1 M22.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 Form 1 M23.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Form 1 M24.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Form 1 Jun24.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 Form 1 Sep 24.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 07 Form 1 Dec 24.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01 Form 3 M21.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 07 Form 3 Dec 24.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 06 Form 3 Sep 24.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 05 Form 3 Jun 24.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 Form 3 M24.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 03 Form 3 M23.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 02 Form 3 M22.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 07 Form 2 Dec24.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 Form 2 Sep 24.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 Form 2 Jun24.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 Form 2 M23.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Form 2 M22.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 Form 2 M21.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 Form 2 M24.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A M21.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A M21.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: 02 Disclosure of inventory.pdf16 Jan 2025
CERSAI detailsFile: 04 Undertaking for CERSAI.pdf16 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 09 Format A BOM.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A M22.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 05 Disclosure of Interest Santosh Harpale.pdf16 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 05 Disclosure of Interest Yuvraj Waje.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A M23.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2023.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A m24.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2024.pdf16 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 09 Format B BOM.pdf16 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: 07 Disclosure of Secured Unsecured.pdf16 Jan 2025
Details of encumbrances concerned to FinanceFile: Finance Encumbrance Declaration.pdf12 Dec 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Declaration.pdf12 Dec 2024
Proforma of Allotment letterFile: Allotment Letter_compr.pdf12 Dec 2024
Declaration in FORM BFile: FIRM FORM B_compre.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 sep 2024 Signed_compressed.pdf12 Dec 2024
Declaration about Commencement CertificateFile: Declaration About Commencement .pdf12 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Details - Firm Format A.pdf12 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation report AFS.pdf12 Dec 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance Declaration.pdf12 Dec 2024
Details of encumbrances concerned to LegalFile: Finance Encumbrance Declaration.pdf12 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report AFS.pdf12 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disc of Int in other entity Annxure A.pdf12 Dec 2024
Building plan approvalFile: 1-3.pdf17 Aug 2023
Building plan approvalFile: 2-3.pdf17 Aug 2023
Building plan approvalFile: 3-3.pdf17 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 1-3.pdf17 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 2-3.pdf17 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 3-3.pdf17 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT LETTER REVISION.pdf17 Aug 2023
Layout approvalFile: FINAL PLAN_compressed_compressed.pdf1 Sep 2020
Building plan approvalFile: scan0565_Page_1.pdf1 Sep 2020
Building plan approvalFile: scan0565_Page_2.pdf1 Sep 2020
Building plan approvalFile: scan0565_Page_3.pdf1 Sep 2020
Building plan approvalFile: scan0565_Page_4.pdf1 Sep 2020
Building plan approvalFile: scan0565_Page_5.pdf1 Sep 2020
Copy of the legal title reportFile: SEARCH REPORT-7-19_compressed (5).pdf1 Sep 2020
Details of encumbrancesFile: ENCUMBRANCES CER_compressed.pdf1 Sep 2020
Copy of Layout Approval (in case of layout)File: FINAL PLAN_compressed_compressed.pdf1 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: scan0565_Page_1.pdf1 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: scan0565_Page_2.pdf1 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: scan0565_Page_3.pdf1 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: scan0565_Page_4.pdf1 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: scan0565_Page_5.pdf1 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed_compressed.pdf1 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - Nisarg.PDF1 Sep 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca cer_compressed.pdf1 Sep 2020
Proforma of Allotment letterFile: ALLOTMNT LETTER.pdf1 Sep 2020
Proforma of Allotment letterFile: RERA DRAFT 29-8-2020 --------------------.pdf1 Sep 2020
PAN CardFile: Firm Pan Card.pdf23 Aug 2020
Declaration in FORM BFile: FORM B.pdf23 Aug 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect cer - nisarg.pdf23 Aug 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 40 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NISARG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near URULI DEVACHI13,700+ in Pune

Builder: WAJE & HARPALE PATIL BUILDERS

WAJE & HARPALE PATIL BUILDERS has 1 registration on MahaRERA, including NISARG. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NISARG is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NISARG?

The registered promoter entity is WAJE & HARPALE PATIL BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NISARG?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NISARG?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in NISARG?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NISARG. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NISARG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.