ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / NIRVANA NAGARI-I

Registered No litigation declared Plotted project

NIRVANA NAGARI-I

By NIRVANA INFRA CREATION PROJECTS PRIVATE LIMITED

RG-MH-44728 · RERA P50500025295 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 120 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2031Possession promisedmoved 120 months from the original
19 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 259 documents Report an error

NIRVANA NAGARI-I is a Plotted project by NIRVANA INFRA CREATION PROJECTS PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500025295 on 5 Apr 2020. Possession is promised by 30 Mar 2031. The completion date has moved by 120 months from the original filing. 11 of the 30 units on this registration are recorded sold or booked.

At a glance

Project

  • NameNIRVANA NAGARI-I
  • TypePlotted
  • Location
    • P H NO 45
    • TEHSIL HINGNA
    • Sukali(gupchup)
    • Hingna
    • Nagpur
    • 441110
  • Pincode441110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500025295
  • ReraGenie IDRG-MH-44728

Builder

  • NameNIRVANA INFRA CREATION PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsPRASHANT SUBHASH NARKHEDE, SURESH LAXMANRAO BEHARE

Key dates

this monthRegisteredApr 2020First promiseMar 2021Revised toMar 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2020
  • Promised completion30 Mar 2031
  • Revised completionRevised to 30 Mar 2031 (originally 30 Mar 2021)
  • BuildingsNot stated in filing
  • Documents filed259 files

Current status

37%11 of 30 units booked
70.3%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,700 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Aug 2025

Approvals and building plan

Sanctioning authorityOffice of Collector, Nagpur City
Permissible FSI9437.81
Proposed, not sanctioned9,438 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2-8 POONAM PRIDE TRIMUTRI NAGAR KHAMLA ROAD NAGPUR- 440025
Estimated costRs 1.14 cr
Cost incurredRs 80.12 lakh
Work done70.28%
BuildingWingEstimatedIncurred
-NARs 1.14 crRs 80.12 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPAWAN RAVIPRASAD GUPTA
ArchitectASHWIN A DARWHEKAR
EngineerASHWIN A DARWHEKAR
Chartered AccountantDHEERAJ RAMESH KOCHAR
Chartered AccountantMOHIT JANGID
PartnerRole in project
NIRVANA INFRA CREATION PROJECTS PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500011477Mar 2021 → Mar 2026

Reason as filed by the promoterDue to ensuing Covid pandemic since around past over 18 months it has hampered the regular supply of labour and material at the project site. Due to covid pandemic management and its other staff were heavily infected and took much more time to recover. Due to covid pandemic lockdown the documentation and other administrative work was held up for longer time.

EA20032620306Mar 2021 → Mar 2031

Reason as filed by the promoter* Requirement by NMRDA to revise Town Planning MAP as the Authority of National High-Way has changed it's proposal of 60 Mtrs National High-way with new proposal of 36 Mtrs High-Way from the layout. * The Real Estate Project is situated in a remote area and hence faced significant challanges due to limited cusomter bookings resulting in a lower than anticipated response from prospective buyers.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2031

Documents filed259

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 259 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1_FY2025-26_Q4.pdf15 Jul 2026
Withdrawal Update Form 2File: Form2_Q4_FY2025-26.pdf15 Jul 2026
Withdrawal Update Form 3File: FORM 3_FY2025-26_Q4_Attested.pdf15 Jul 2026
Withdrawal Update Form 1File: Form-1_FY 2025-26_Q3.pdf27 Feb 2026
Withdrawal Update Form 2File: Form2_Q3_FY2025-26.pdf27 Feb 2026
Withdrawal Update Form 3File: FORM 3_FY2025-26_Q3.pdf27 Feb 2026
Withdrawal Update Form 1File: Form-1_FY 2025-26_Q2.pdf15 Nov 2025
Withdrawal Update Form 2File: Form2_Q2_FY2025-26.pdf15 Nov 2025
Withdrawal Update Form 3File: FORM 3_FY2025-26_Q2.pdf15 Nov 2025
Form 2A (FY 2021-2022)File: Form 2A_SystemGenerated_FY2021-22_Pg-1.pdf29 Oct 2025
Form 2A (FY 2020-2021)File: Form 2A_SystemGenerated_FY2020-21.pdf29 Oct 2025
Form 2A (FY 2022-2023)File: Form 2A_SystemGenerated_FY2022-23_Pg-1.pdf29 Oct 2025
Form 2A (FY 2023-2024)File: Form 2A_SystemGenerated_FY2023-24_Pg-1.pdf29 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A_SystemGenerated_FY2024-25_Pg-1.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: form 5 nirvana 2024-25.pdf13 Oct 2025
Declaration and undertaking (Annexure A)File: OrderNo50-2024_Declaration Cum Undertaking_page-0001.pdf11 Oct 2025
Commencement certificateFile: Circular- 32_commencement Certificate.pdf7 Oct 2025
Withdrawal Update Form 1File: Form1_Q1_FY2023-24.pdf2 Oct 2025
Withdrawal Update Form 1File: Form1_Q2_FY2023-24.pdf2 Oct 2025
Withdrawal Update Form 1File: Form1_Q3_FY2023-24.pdf2 Oct 2025
Withdrawal Update Form 1File: Form1_Q4_FY2023-24.pdf2 Oct 2025
Withdrawal Update Form 1File: Form1_Q1_FY2024-25.pdf2 Oct 2025
Withdrawal Update Form 1File: Form1_Q2_FY2024-25.pdf2 Oct 2025
Withdrawal Update Form 1File: Form1_Q3_FY2024-25.pdf2 Oct 2025
Withdrawal Update Form 1File: Form1_Q4_FY2024-25.pdf2 Oct 2025
Withdrawal Update Form 1File: Form1_Q1_FY2025-26.pdf2 Oct 2025
Withdrawal Update Form 2File: Form2_Q1_FY2023-24_1.pdf2 Oct 2025
Withdrawal Update Form 2File: Form2_Q2_FY2023-24_1.pdf2 Oct 2025
Withdrawal Update Form 2File: Form2_Q3_FY2023-24_1.pdf2 Oct 2025
Withdrawal Update Form 2File: Form2_Q4_FY2023-24_1.pdf2 Oct 2025
Withdrawal Update Form 2File: Form2_Q1_FY2024-25_1.pdf2 Oct 2025
Withdrawal Update Form 2File: Form2_Q2_FY2024-25_1.pdf2 Oct 2025
Withdrawal Update Form 2File: Form2_Q3_FY2024-25_1.pdf2 Oct 2025
Withdrawal Update Form 2File: Form2_Q4_FY2024-25_1.pdf2 Oct 2025
Withdrawal Update Form 2File: Form2_Q1_FY2025-26_1.pdf2 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2023-24_Q1 signed.pdf2 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2023-24_Q2 signed.pdf2 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2023-24_Q3 signed.pdf2 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2023-24_Q4 signed.pdf2 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2024-25_Q1 signed.pdf2 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2024-25_Q2 SIGNED.pdf2 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2024-25_Q3 signed.pdf2 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2024-25_Q4 signed.pdf2 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2025-26_Q1 signed.pdf2 Oct 2025
Withdrawal Update Form 1File: Form1_Q2_FY 2021-22.pdf1 Oct 2025
Withdrawal Update Form 1File: Form1-Q3_FY2021-22.pdf1 Oct 2025
Withdrawal Update Form 1File: Form1-Q3_FY2021-22.pdf1 Oct 2025
Withdrawal Update Form 1File: Form1_Q4_FY2021-22.pdf1 Oct 2025
Withdrawal Update Form 1File: Form1_Q1_FY2022-23.pdf1 Oct 2025
Withdrawal Update Form 1File: Form1_Q2_FY2022-23.pdf1 Oct 2025
Withdrawal Update Form 1File: Form1_Q2_FY2022-23.pdf1 Oct 2025
Withdrawal Update Form 1File: Form1_Q3_FY2022-23.pdf1 Oct 2025
Withdrawal Update Form 1File: Form1_Q4_FY2022-23.pdf1 Oct 2025
Withdrawal Update Form 2File: Form2_Q2_FY2021-22_1.pdf1 Oct 2025
Withdrawal Update Form 2File: Form2_Q2_FY2021-22_1.pdf1 Oct 2025
Withdrawal Update Form 2File: Form2_Q3_FY2021-22_1.pdf1 Oct 2025
Withdrawal Update Form 2File: Form2_Q4_FY2021-22_1.pdf1 Oct 2025
Withdrawal Update Form 2File: Form2_Q1_FY2022-23_1.pdf1 Oct 2025
Withdrawal Update Form 2File: Form2_Q2_FY2022-23_1.pdf1 Oct 2025
Withdrawal Update Form 2File: Form2_Q2_FY2022-23_1.pdf1 Oct 2025
Withdrawal Update Form 2File: Form2_Q3_FY2022-23_1.pdf1 Oct 2025
Withdrawal Update Form 2File: Form2_Q4_FY2022-23_1.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2021-22_Q2 SIGNED.pdf1 Oct 2025
Withdrawal Update Form 3File: Form1-Q3_FY2021-22.pdf1 Oct 2025
Withdrawal Update Form 3File: Form1-Q3_FY2021-22.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2021-22_Q4 final signed.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2022-23_Q1 signed.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2022-23_Q2 signed.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2022-23_Q2 signed.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2022-23_Q3 signed.pdf1 Oct 2025
Withdrawal Update Form 3File: FORM 3_FY2022-23_Q4 signed.pdf1 Oct 2025
Withdrawal Update Form 1File: Form1_Q1_FY 2021-22.pdf29 Sep 2025
Withdrawal Update Form 1File: Form-1_FY2020-21_Q4.pdf29 Sep 2025
Withdrawal Update Form 2File: Form2_Q1_FY2021-22_1.pdf29 Sep 2025
Withdrawal Update Form 2File: Form2_Q4_FY2020-21_1.pdf29 Sep 2025
Withdrawal Update Form 3File: FORM 3_FY2021-22_Q1signed.pdf29 Sep 2025
Withdrawal Update Form 3File: FORM 3_FY2020-21_Q4 signed.pdf29 Sep 2025
Withdrawal Update Form 1File: Form-1_Q1_05-04-2020 To 30-06-2020_.pdf28 Sep 2025
Withdrawal Update Form 1File: Form-1_Q2_FY2020-21.pdf28 Sep 2025
Withdrawal Update Form 1File: Form-1_Q3_FY2020-21.pdf28 Sep 2025

How this compares with Nagpur

37%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 120 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIRVANA NAGARI-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TEHSIL HINGNA2,800+ in Nagpur

2 kmNIRVANA NAGARI-ICompleted 4Lapsed / revoked 3Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: NIRVANA INFRA CREATION PROJECTS PRIVATE LIMITED

NIRVANA INFRA CREATION PROJECTS PRIVATE LIMITED has 1 registration on MahaRERA, including NIRVANA NAGARI-I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if NIRVANA NAGARI-I is delayed beyond 30 Mar 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRVANA NAGARI-I?

The registered promoter entity is NIRVANA INFRA CREATION PROJECTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRVANA NAGARI-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRVANA NAGARI-I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRVANA NAGARI-I?

The professionals named in the filing: Architect: PAWAN RAVIPRASAD GUPTA; Architect: ASHWIN A DARWHEKAR; Engineer: ASHWIN A DARWHEKAR; Chartered Accountant: DHEERAJ RAMESH KOCHAR; Chartered Accountant: MOHIT JANGID. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRVANA NAGARI-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRVANA NAGARI-I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRVANA NAGARI-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.