Home / Browse projects / Raigarh, Maharashtra / NIRMAL SUNDER RESIDENCY

Completed No litigation declared Mixed project

NIRMAL SUNDER RESIDENCY

By SHREE SAIBABA DEVELOPERS

RG-MH-35323 · RERA P52000050543 · Last updated on MahaRERA portal: 16 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 11Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
19 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

NIRMAL SUNDER RESIDENCY is a Mixed project by SHREE SAIBABA DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000050543 on 21 Apr 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 16 of the 35 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameNIRMAL SUNDER RESIDENCY
  • TypeMixed
  • Location
    • THAKRE ROAD
    • NANA MASTER NAGAR KARJAT
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000050543
  • ReraGenie IDRG-MH-35323

Builder

  • NameSHREE SAIBABA DEVELOPERS
  • Entity typePartnership
  • PartnersMURLIDHAR SADASHIV PANCHAL, PRASHANT GAJANAN AMBAVANE, SAYED AZHAR HUSSAINI
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2023First promiseDec 2025Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed99 files

Current status

46%16 of 35 units booked
83.4%Work done, per cost certificate

Figures as on 16 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NIRMAL SUNDER RESIDENCYNA7730434

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

NIRMAL SUNDER RESIDENCY82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 16 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered1
Open Space6

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area774 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
PRASHANT GAJANAN AMBAVANEwengaonRaigarh
MURLIDHAR SADASHIV PANCHALDahiwali T. WarediRaigarh
SAYED AZHAR HUSSAINIAnjapRaigarh

Approvals and building plan

Sanctioning authorityKarjat Municipal Council
Permissible FSI1733.57
Proposed, not sanctioned1,734 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBMT RESIDENCY SHOP NO 3 GROUND FLOOR AMARAI ROAD KARJAT DIST RAIGAD PIN 410201
Estimated costRs 2.81 cr
Cost incurredRs 2.34 cr
Work done83.36%
BuildingWingEstimatedIncurred
NIRMAL SUNDER RESIDENCYNARs 2.23 crRs 2.05 cr
-NARs 57.75 lakhRs 28.88 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMADHAV PARANJAPE
ArchitectDESIGN MARK ARCHITECTURAL PLANNERS & CONSTULTING CIVIL ENGINEERS
EngineerRAJESH THAKARE
EngineerRajesh Thakare & Associates CONSULTING STRUCTURAL ENGINEERS & CHARTERED ENGINEERS
Chartered AccountantMANGESH VINAYAK CHITALE
Chartered AccountantNiraj Oswal & Co
Chartered AccountantRonak J Kothari & Associates
PartnerRole in project
SHREE SAIBABA DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA10122518594Dec 2025 → Dec 2026

Reason as filed by the promoterWe, Shree Saibaba Developers, hereby declare the following with respect to the project “NIRMAL SUNDER RESIDENCY” bearing registration number P52000050543 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the Occupat

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jun 2026

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Nirmal Sundar Residency OC and plan.pdf16 Jun 2026
Completion CertificateFile: Nirmal Sundar Residency OC and plan.pdf16 Jun 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf7 May 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf7 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf7 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf7 May 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf7 May 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf7 May 2026
Withdrawal Update Form 1File: Form 1 December 2025.pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2 December 2025.pdf17 Feb 2026
Withdrawal Update Form 3File: Form 3 December 2025.pdf17 Feb 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf10 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 24-25_11zon.pdf10 Dec 2025
Form 1File: Form 1 June 2023.pdf9 Dec 2025
Form 2File: Form 2 June 2023.pdf9 Dec 2025
Form 3File: Form 3.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 as on June 2023.pdf9 Dec 2025
Form 1File: Form 1 September 2023.pdf9 Dec 2025
Form 2File: Form 2 September 2023.pdf9 Dec 2025
Form 3File: Form 3.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 as on September 2023.pdf9 Dec 2025
Form 1File: Form 1 December 2023.pdf9 Dec 2025
Form 2File: Form 2 December 2023.pdf9 Dec 2025
Form 3File: Form 3.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 as on December 2023.pdf9 Dec 2025
Form 1File: Form 1 March 2024.pdf9 Dec 2025
Form 2File: Form 2 March 2024.pdf9 Dec 2025
Form 3File: Form 3.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 as on March 2024.pdf9 Dec 2025
Form 1File: Form 1 June 2024.pdf9 Dec 2025
Form 2File: Form 2 June 2024.pdf9 Dec 2025
Form 3File: Form 3.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 as on June 2024.pdf9 Dec 2025
Form 1File: Form 1 September 2024.pdf9 Dec 2025
Form 2File: Form 2 September 2024.pdf9 Dec 2025
Form 3File: Form 3.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 as on September 2024.pdf9 Dec 2025
Form 1File: Form 1 December 2024.pdf9 Dec 2025
Form 2File: Form 2 December 2024.pdf9 Dec 2025
Form 3File: Form 3.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 as on December 2024.pdf9 Dec 2025
Form 1File: Form 1 March 2025.pdf9 Dec 2025
Form 2File: Form 2 March 2025.pdf9 Dec 2025
Form 3File: Form 3.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 as on March 2025.pdf9 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf9 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf9 Dec 2025
Withdrawal Update Form 1File: Form 1 for June 2025.pdf11 Nov 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 as on September 2025.pdf11 Nov 2025
Withdrawal Update Form 2File: Form 2 for June 2025.pdf11 Nov 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 as on September 2025.pdf11 Nov 2025
Withdrawal Update Form 3File: Form 3 for June 2025.pdf11 Nov 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 as on September 2025.pdf11 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 august.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 December.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 August 2024.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30 06 2024.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 September.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Nov 2023
Details of encumbrances concerned to FinanceFile: encumbrance finance.pdf18 Apr 2023
Details of encumbrances concerned to LegalFile: encumbrance finance.pdf18 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN-2.pdf5 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN-3.pdf5 Apr 2023
Other - TechnicalFile: format d.pdf5 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PLINTH LEVEL_compressed-2.pdf3 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN-1.pdf3 Apr 2023
Other - TechnicalFile: PLINTH LEVEL_compressed-2.pdf3 Apr 2023
Copy of the legal title reportFile: nirmal title.pdf14 Feb 2023
Declaration in FORM BFile: form b P.pdf14 Feb 2023
Building plan approval or NA orderFile: LAY OUT AND NA ORDER.pdf9 Nov 2022
Layout approvalFile: LAYOUT PLAN.pdf9 Nov 2022
Details of encumbrances concerned to FinanceFile: legal encumbrance.pdf9 Nov 2022
Details of encumbrances concerned to LegalFile: legal encumbrance.pdf9 Nov 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf9 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: LAY OUT AND NA ORDER.pdf9 Nov 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SUNDER KALPANA RIVER86 BAM MALA NEAR SHIVAM GARDEN VILLAGE AKURLE TAL.KARJAT DIST.RAIGAD1CompletedJan 2014Late, Jul 2017

How this compares with Raigarh

46%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIRMAL SUNDER RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NANA MASTER NAGAR KARJAT5,900+ in Raigarh

2 kmNIRMAL SUNDER RESIDENCYCompleted 59Lapsed / revoked 43Other 51Dot size: filed unitsN

Filed coordinates, straight-line distance. 153 registered projects within 2 km.

Builder: SHREE SAIBABA DEVELOPERS

SHREE SAIBABA DEVELOPERS has 1 registration on MahaRERA, including NIRMAL SUNDER RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if NIRMAL SUNDER RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIRMAL SUNDER RESIDENCY?

The registered promoter entity is SHREE SAIBABA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIRMAL SUNDER RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIRMAL SUNDER RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIRMAL SUNDER RESIDENCY?

The professionals named in the filing: Architect: MADHAV PARANJAPE; Architect: DESIGN MARK ARCHITECTURAL PLANNERS & CONSTULTING CIVIL ENGINEERS; Engineer: RAJESH THAKARE; Engineer: Rajesh Thakare & Associates CONSULTING STRUCTURAL ENGINEERS & CHARTERED ENGINEERS; Chartered Accountant: MANGESH VINAYAK CHITALE; Chartered Accountant: Niraj Oswal & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIRMAL SUNDER RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIRMAL SUNDER RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIRMAL SUNDER RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.