Home / Browse projects / Pune, Maharashtra / Nexus Gulmohar H

Registered No litigation declared Residential / Group Housing project

Nexus Gulmohar H

By Diamond Nexus Associates

RG-MH-73512 · RERA P52100052529 · Last updated on MahaRERA portal: 24 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 8 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 8 months from the original
8 of 11Construction stages donefurthest along: Installation of Lifts, 99%
5 of 178Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Nexus Gulmohar H is a Residential / Group Housing project by Diamond Nexus Associates in Pune, Maharashtra, registered with MahaRERA as P52100052529 on 8 Sep 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 8 months from the original filing. 173 of the 178 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameNexus Gulmohar H
  • TypeResidential / Group Housing
  • Location
    • Airport Road
    • Charholi Budruk
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100052529
  • ReraGenie IDRG-MH-73512

Builder

  • NameDiamond Nexus Associates
  • Entity typePartnership
  • PartnersHardik Pravinbhai Patel, Narottam Meghajibhai Patel, Rasik Narsingh Chauhan, Bharat Narsingh Patel, Rupali Vishwas Darade
  • Other registrations3 more →
  • Completed3 of 4

Key dates

this monthRegisteredSep 2023First promiseApr 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Sep 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Apr 2026)
  • Buildings1 building record
  • Documents filed109 files

Current status

97%173 of 178 units booked
97.3%Work done, per cost certificate

Figures as on 24 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nexus Gulmohar Building HNA16151780178

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 99%.

Nexus Gulmohar Building H: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Progress on shared amenities15

As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered106

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,458 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Raghunath Ramchandra BhujbalCHARHOLIPune
Somanath Baban BhujbalCHARHOLIPune
Dattatray Baban BhujbalCHARHOLIPune
Dashrath Baban BhujbalCHARHOLIPune
Dnyaneshwar Appa BhujbalCHARHOLIPune

Approvals and building plan

Sanctioning authorityPimpari Chinchwad Muncipal Coporation
Permissible FSI13492.42
Proposed, not sanctioned13,492 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndrayani Nagar Bhosari Pune 411039
Estimated costRs 34.35 cr
Cost incurredRs 33.43 cr
Work done97.3%
BuildingWingEstimatedIncurred
Nexus Gulmohar Building HNARs 31.35 crRs 30.73 cr
-NARs 3.00 crRs 2.70 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDream Space Architects
EngineerAadhar Engineers
Chartered AccountantCA Dhiraj Manoj Baldota
Chartered AccountantMohmedyasir A Bagwan
Chartered AccountantSS Bora & Co
PartnerRole in project
Diamond Nexus Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17062621400Apr 2026 → Dec 2026

Reason as filed by the promoterThe project completion has been delayed due to circumstances beyond the control of the promoter. The project was adversely affected by delays in statutory approvals, disruption in availability of labor and construction materials, and interruptions caused by external factors. In addition, unforeseen administrative and operational challenges impacted the planned construction schedule. Despite these difficulties, the promoter has continued construction activities and remains fully committed to completing the project at the earliest. The extension is sought to ensure timely completion with require

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 13) WING H ARCHITECT CERTIICATE DATE - 30-06-2026.pdf24 Jul 2026
Withdrawal Update Form 2File: 13 WING H ENGINEER CERTIFICATE DATE 30-06-2026.pdf24 Jul 2026
Withdrawal Update Form 3File: 13) CA CERTIFICATE WING H 30-06-2026_compressed.pdf24 Jul 2026
Withdrawal Update Form 1File: 13) WING H ARCHITECT CERTIICATE DATE - 30-06-2026.pdf18 Jul 2026
Withdrawal Update Form 2File: F2.pdf18 Jul 2026
Withdrawal Update Form 3File: 13) CA CERTIFICATE WING H 30-06-2026_compressed.pdf18 Jul 2026
Withdrawal Update Form 1File: F1.pdf17 Jun 2026
Withdrawal Update Form 2File: F2.pdf17 Jun 2026
Withdrawal Update Form 3File: F3.pdf17 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 Gulmohar H 24-25.pdf24 Apr 2026
Form 5 (FY 2025-2026)File: Nexus Gulmohar H Wing Form 5 25-26.pdf24 Apr 2026
Withdrawal Update Form 1File: Architect letter Q1.pdf22 Apr 2026
Withdrawal Update Form 1File: F1.pdf22 Apr 2026
Withdrawal Update Form 1File: F1.pdf22 Apr 2026
Withdrawal Update Form 2File: Engineer letter Q1.pdf22 Apr 2026
Withdrawal Update Form 2File: F2.pdf22 Apr 2026
Withdrawal Update Form 2File: F2.pdf22 Apr 2026
Withdrawal Update Form 3File: Ca certificate Q1.pdf22 Apr 2026
Withdrawal Update Form 3File: Ca certificate Q1.pdf22 Apr 2026
Withdrawal Update Form 3File: F3.pdf22 Apr 2026
Form 1File: 2) WING H ARCHITECT CERTIICATE DATE - 30-09-2023.pdf4 Sep 2025
Form 2File: 2) WING H ENGINEER CERTIFICATE DATE 30-09-2023.pdf4 Sep 2025
Form 3File: 2) CA CERTIFICATE WING H DATE 30-09-2023_compressed.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: 1 SOLD UNSOLD DNA (WING H) (1-7-2023 to 30-09-2023) QTR-2_0001.pdf4 Sep 2025
Form 1File: 3) WING H ARCHITECT CERTIICATE DATE - 31-12-2023.pdf4 Sep 2025
Form 2File: 3) WING H ENGINEER CERTIFICATE DATE 31-12-2023.pdf4 Sep 2025
Form 3File: 3) CA CERTIFICATE WING H DATE 30-12-2023_compressed.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: 2 SOLD UNSOLD DNA (WING H) (1-10-2023 to 31-12-2023) QTR-3_0001.pdf4 Sep 2025
Form 1File: 4) WING H ARCHITECT CERTIICATE DATE - 31-03-2024.pdf4 Sep 2025
Form 2File: 4) WING H ENGINEER CERTIFICATE DATE 31-03-2024.pdf4 Sep 2025
Form 3File: 4) CA CERTIFICATE WING H DATE 30-03-2024_compressed.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: 3 SOLD UNSOLD DNA (WING H) (1-01-2024 to 31-03-2024) QTR-4_0001.pdf4 Sep 2025
Form 1File: 5) WING H ARCHITECT CERTIICATE DATE - 30-06-2024.pdf4 Sep 2025
Form 2File: 5) WING H ENGINEER CERTIFICATE DATE 30-06-2024.pdf4 Sep 2025
Form 3File: 5) CA CERTIFICATE WING H DATE 30-06-2024_compressed.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: 4 SOLD UNSOLD DNA (WING H) (01-04-2024 to 30-06-2024) QTR-1_0001.pdf4 Sep 2025
Form 1File: 6) WING H ARCHITECT CERTIICATE DATE - 30-09-2024.pdf4 Sep 2025
Form 2File: 6) WING H ENGINEER CERTIFICATE DATE 30-09-2024.pdf4 Sep 2025
Form 3File: 6) CA CERTIFICATE WING H DATE 31-09-2024 (10-12-2024)_compressed.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: 5 SOLD UNSOLD DNA (WING H) (01-07-2024 to 30-09-2024) QTR-2_0001.pdf4 Sep 2025
Form 1File: 7) WING H ARCHITECT CERTIICATE DATE - 31-12-2024.pdf4 Sep 2025
Form 2File: 7) WING H ENGINEER CERTIFICATE DATE 31-12-2024.pdf4 Sep 2025
Form 3File: 7) CA CERTIFICATE WING H DATE 31-12-2024.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: 6 SOLD UNSOLD DNA (WING H) (01-10-2024 to 31-12-2024) QTR-3_0001.pdf4 Sep 2025
Form 1File: 8) WING H ARCHITECT CERTIICATE DATE - 31-03-2025.pdf4 Sep 2025
Form 2File: 8) WING H ENGINEER CERTIFICATE DATE 31-03-2025.pdf4 Sep 2025
Form 3File: 8) CA CERTIFICATE WING H DATE 31-03-2025_compressed.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: 7 SOLD UNSOLD DNA (WING H) (01-01-2025 to 31-03-2025) QTR-4_0001.pdf4 Sep 2025
Form 1File: 9) WING H ARCHITECT CERTIICATE DATE - 30-06-2025.pdf4 Sep 2025
Form 2File: 9) WING H ENGINEER CERTIFICATE DATE 30-06-2025.pdf4 Sep 2025
Form 3File: 9) CA CERTIFICATE WING H DATE 17-07-2025 JUNE 25_compressed.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: 8 SOLD UNSOLD DNA (WING H) (01-04-2025 to 30-06-2025) QTR-1_0001.pdf4 Sep 2025
Form 5 (FY 2023-2024)File: 1) Form - 5 Date 08-09-2023 to 31-03-2024.pdf4 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8) WING H ARCHITECT CERTIICATE DATE - 31-03-2025.pdf13 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7) CA CERTIFICATE WING H DATE 31-12-2024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7) WING H ARCHITECT CERTIICATE DATE - 31-12-2024.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7) WING H ENGINEER CERTIFICATE DATE 31-12-2024.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2) CA CERTIFICATE WING H DATE 30-09-2023_compressed.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3) CA CERTIFICATE WING H DATE 30-12-2023_compressed.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4) CA CERTIFICATE WING H DATE 30-03-2024_compressed.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5) CA CERTIFICATE WING H DATE 30-06-2024_compressed.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6) CA CERTIFICATE WING H DATE 31-09-2024 (10-12-2024)_compressed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6) WING H ENGINEER CERTIFICATE DATE 30-09-2024.pdf17 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6) WING H ENGINEER CERTIFICATE DATE 30-09-2024.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6) WING H ENGINEER CERTIFICATE DATE 30-09-2024.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5) WING H ARCHITECT CERTIICATE DATE - 30-06-2024.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2) WING H ENGINEER CERTIFICATE DATE 30-09-2023.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3) WING H ENGINEER CERTIFICATE DATE 31-12-2023.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4) WING H ENGINEER CERTIFICATE DATE 31-03-2024.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5) WING H ENGINEER CERTIFICATE DATE 30-06-2024.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4) WING H ARCHITECT CERTIICATE DATE - 31-03-2024.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1) WING H ARCHITECT CERTIICATE DATE 05-06-2023.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2) WING H ARCHITECT CERTIICATE DATE - 30-09-2023.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3) WING H ARCHITECT CERTIICATE DATE - 31-12-2023.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1) WING H ENGINEER CERTIFICATE DATE 05-06-2023_0001.pdf27 Jul 2024
Layout approvalFile: 1_page-0001 (1)_11zon (1).pdf19 Jun 2023
Building plan approvalFile: 2_page-0001 (2).pdf19 Jun 2023
Building plan approvalFile: 20.pdf19 Jun 2023
Building plan approvalFile: 21.pdf19 Jun 2023
Building plan approvalFile: 22.pdf19 Jun 2023

How this compares with Pune

97%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 8 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nexus Gulmohar H on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Charholi Budruk13,700+ in Pune

Builder: Diamond Nexus Associates

DIAMOND NEXUS ASSOCIATES has 4 registrations on MahaRERA, including NEXUS GULMOHAR WING A and B and NEXUS GULMOHAR WING C. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nexus Gulmohar H is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nexus Gulmohar H?

The registered promoter entity is Diamond Nexus Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nexus Gulmohar H?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nexus Gulmohar H?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nexus Gulmohar H?

The professionals named in the filing: Architect: Dream Space Architects; Engineer: Aadhar Engineers; Chartered Accountant: CA Dhiraj Manoj Baldota; Chartered Accountant: Mohmedyasir A Bagwan; Chartered Accountant: SS Bora & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nexus Gulmohar H?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nexus Gulmohar H. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nexus Gulmohar H to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one