Home / Browse projects / Pune, Maharashtra / Nexus Emerald
Nexus Emerald
RG-MH-61573 · RERA P52100050035 · Last updated on MahaRERA portal: 22 Jun 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 21 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Nexus Emerald is a Residential / Group Housing project by Vyankatesh Realconstro LLP in Pune, Maharashtra, registered with MahaRERA as P52100050035 on 6 Mar 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 21 months from the original filing. 104 of the 112 units on this registration are recorded sold or booked, and 15 of 22 construction stages are filed complete.
At a glance
Project
- NameNexus Emerald
- TypeResidential / Group Housing
- Location
- Gat No 79
- Borhadewadi
- Haveli
- Pune
- 412105
- Pincode412105
- RERA no.P52100050035
- ReraGenie IDRG-MH-61573
Builder
- NameVyankatesh Realconstro LLP
- Entity typePartnership
- PartnersSatishkumar Ravjibhai Patel, Jigneshkumar Jethalal Makani, Satish Keshav Sonawane, Kaushalkumar Mohanbhai Patel, Anirudha Dattatraya Pradhan, Hanumant Baban Gaikwad, Sanjay Dattatray Pradhan, Laxmikant Sadashiv Kole
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on6 Mar 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Mar 2025)
- Buildings2 building records
- Documents filed166 files
Current status
Figures as on 22 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Unit A | NA | 8 | 7 | 56 | 0 | 56 |
| Unit B | NA | 8 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 98%.
Unit A73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Unit B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed264
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Unit A | 132 | 132 |
| Unit B | 132 | 132 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Ashok Narayan Bhosale | Wakad | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Unit A | NA | Rs 7.70 cr | Rs 7.29 cr |
| Unit B | NA | Rs 7.70 cr | Rs 7.29 cr |
| - | NA | Rs 1.10 cr | Rs 71.50 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Uday Kulkarni |
| Engineer | Ajinkya A Lahigude |
| Engineer | Dipali D Kashid |
| Chartered Accountant | CA Ganesh Sunil Mandalecha Chartered Accountants |
| Chartered Accountant | Djiraj Manoj Baldota |
| Chartered Accountant | Mohamadyasir A Bagwan |
| Chartered Accountant | Shubham S Bora |
| Partner | Role in project |
|---|---|
| Vyankatesh Realconstro LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThat due to revision in rules by Plan Sanction Authority & technical issues there is a delay in completing the project and obtaining completion certificate in the given time.
Reason as filed by the promoterI respectfully request that my application for extension of the project validity up to 30/09/2025 be processed and approved. Although the Occupancy Certificate has already been received on 17/02/2026, the extension is required to complete the correction process on the MahaRERA portal prior to applying for project closure. Since the sanctioned built-up area mentioned in the initial registration differs from the revised approved plans, direct project closure cannot be sought. Further, a query has been raised by MahaRERA regarding the expiry of the project completion date. Accordingly, the extens
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Apr 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed166
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 166 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Completion Certificate - Nexus Emerald with OC confirmation.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: F1.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: F2.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: F3.pdf | 9 Apr 2026 |
| Form 5 (FY 2025-2026)File: Nexus Emerald- FORM - 5.pdf | 9 Apr 2026 |
| Layout approvalFile: Plan 01.pdf | 6 Apr 2026 |
| Building plan approvalFile: Plan 01.pdf | 6 Apr 2026 |
| Building plan approvalFile: Plan 02.pdf | 6 Apr 2026 |
| Building plan approvalFile: Plan 03.pdf | 6 Apr 2026 |
| Building plan approvalFile: Plan 04.pdf | 6 Apr 2026 |
| Building plan approvalFile: Plan 05.pdf | 6 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf | 6 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf | 6 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Dec 2025.pdf | 6 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - 2024-25.pdf | 6 Apr 2026 |
| Withdrawal Update Form 1File: 14 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE 01-10-2025 Sep 25.pdf | 2 Feb 2026 |
| Withdrawal Update Form 2File: 12) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (SEP-2025).pdf | 2 Feb 2026 |
| Withdrawal Update Form 3File: 12) CA CERTIFICATE NEXUS EMERALD DATE 30-09-2025_compressed.pdf | 2 Feb 2026 |
| Form 1File: 4 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-03-2023.pdf | 26 Aug 2025 |
| Form 2File: 2) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-03-2023 (mar-23).pdf | 26 Aug 2025 |
| Form 3File: 2) CA CERTIFICATE NEXUS EMERALD DATE 31-03-2023 (mar-23).pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 1 SOLD UNSOLD VYANKATESH LLP (1-1-2023 to 31-03-2023) QTR-4.pdf | 26 Aug 2025 |
| Form 1File: 5 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2023.pdf | 26 Aug 2025 |
| Form 2File: 3) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-06-2023 (june-23).pdf | 26 Aug 2025 |
| Form 3File: 3) CA CERTIFICATE NEXUS EMERALD DATE 30-06-2023 (june-23).pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 SOLD UNSOLD VYANKATESH LLP (1-4-2023 to 30-06-2023) QTR-1.pdf | 26 Aug 2025 |
| Form 1File: 6 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 14-09-2023.pdf | 26 Aug 2025 |
| Form 2File: 4) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 10-10-2023 (sep-23).pdf | 26 Aug 2025 |
| Form 3File: 4) CA CERTIFICATE NEXUS EMERALD DATE 10-10-2023.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 SOLD UNSOLD VYANKATESH LLP (1-7-2023 to 30-09-2023) QTR-2.pdf | 26 Aug 2025 |
| Form 1File: 7 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2023.pdf | 26 Aug 2025 |
| Form 2File: 5) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE 30-12-2023 (dec-23).pdf | 26 Aug 2025 |
| Form 3File: 5) CA CERTIFICATE NEXUS EMERALD DATE 31-12-2023 (dec-23).pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 SOLD UNSOLD VYANKATESH LLP (1-10-2023 to 31-12-2023) QTR-3.pdf | 26 Aug 2025 |
| Form 1File: 8 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-03-2024.pdf | 26 Aug 2025 |
| Form 2File: 6) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March - 2024).pdf | 26 Aug 2025 |
| Form 3File: 6) CA CERTIFICATE NEXUS EMERALD DATE 31-03-2024.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 SOLD UNSOLD VYANKATESH LLP (1-1-2024 to 31-03-2024) QTR-4.pdf | 26 Aug 2025 |
| Form 1File: 9 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2024.pdf | 26 Aug 2025 |
| Form 2File: 7) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (June - 2024).pdf | 26 Aug 2025 |
| Form 3File: 7 CA CERTIFICATE NEXUS EMERALD DATE 30 06 2024.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 6 SOLD UNSOLD VYANKATESH LLP (1-4-2024 to 30-06-2024) QTR-1.pdf | 26 Aug 2025 |
| Form 1File: 10 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-09-2024.pdf | 26 Aug 2025 |
| Form 2File: 8) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Sep - 2024).pdf | 26 Aug 2025 |
| Form 3File: 8 CA CERTIFICATE NEXUS EMERALD DATE 30 09 2024.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 7 SOLD UNSOLD VYANKATESH LLP (1-7-2024 to 30-09-2024) QTR-2.pdf | 26 Aug 2025 |
| Form 1File: 11 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2024.pdf | 26 Aug 2025 |
| Form 2File: 9) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Dec - 2024).pdf | 26 Aug 2025 |
| Form 3File: 9) CA CERTIFICATE NEXUS EMERALD DATE 31-12-2024_compressed.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 8 SOLD UNSOLD VYANKATESH LLP (1-10-2024 to 31-12-2024) QTR-3.pdf | 26 Aug 2025 |
| Form 1File: 12 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE 05-04-2025 MARCH-25.pdf | 26 Aug 2025 |
| Form 2File: 10) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March 2025).pdf | 26 Aug 2025 |
| Form 3File: 10) CA CERTIFICATE NEXUS EMERALD DATE 31-03-2025_compressed.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 9 SOLD UNSOLD VYANKATESH LLP (1-1-2025 to 31-03-2025) QTR-4.pdf | 26 Aug 2025 |
| Form 1File: 13 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE 25-07-2025 JUNE-25.pdf | 26 Aug 2025 |
| Form 2File: 11) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (June 2025).pdf | 26 Aug 2025 |
| Form 3File: 11) CA CERTIFICATE NEXUS EMERALD DATE 30-06-2025_compressed.pdf | 26 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: 10 SOLD UNSOLD VYANKATESH LLP (1-4-2025 to 30-06-2025) QTR-1.pdf | 26 Aug 2025 |
| Form 5 (FY 2022-2023)File: 1) FORM - 5 DATE - 31-01-2024 FY 22-23.pdf | 26 Aug 2025 |
| Form 5 (FY 2023-2024)File: 2) FORM - 5 DATE - 01-01-2023 to 31-03-2024.pdf | 26 Aug 2025 |
| Form 5 (FY 2024-2025)File: 3) FORM - 5 (01-04-2024 to 31-03-2025) Date 07-08-2025.pdf | 26 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 16) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE 05042025.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (March 2025).pdf | 2 May 2025 |
| Declaration in FORM BFile: Form B.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03_compressed.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_compressed.pdf | 21 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 21-02-2023.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 10-02-2023.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE-31-03-2025 (WORK PROGRESSING REPORT).pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2024.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-09-2024.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2024.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-12-2023.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 30-06-2023.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 14-09-2023.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 31-03-2024.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7) VYANKATESH REALCONSTRO LLP ARC CERTIFICATE DATE 21-02-2023.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9) CA CERTIFICATE NEXUS EMERALD DATE 31-12-2024_compressed.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9) ENGINEER CERTIFICATE VYANKATESH REALCONSTRO LLP DATE (Dec - 2024).pdf | 15 Apr 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 166 filed documents as one ZIP, foldered, with a manifest
Keep Nexus Emerald on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borhadewadi13,700+ in Pune
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Vyankatesh Realconstro LLP
Vyankatesh Realconstro LLP has 1 registration on MahaRERA, including Nexus Emerald. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Nexus Emerald is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Nexus Emerald?
The registered promoter entity is Vyankatesh Realconstro LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Nexus Emerald?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Nexus Emerald?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Nexus Emerald?
The professionals named in the filing: Architect: Uday Kulkarni; Engineer: Ajinkya A Lahigude; Engineer: Dipali D Kashid; Chartered Accountant: CA Ganesh Sunil Mandalecha Chartered Accountants; Chartered Accountant: Djiraj Manoj Baldota; Chartered Accountant: Mohamadyasir A Bagwan. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Nexus Emerald?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback