Home / Browse projects / Nagpur, Maharashtra / New Savera-1

Registered No litigation declared Plotted project

New Savera-1

By New Savera Land Developers & Builders

RG-MH-82902 · RERA P50500056394 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
9 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

New Savera-1 is a Plotted project by New Savera Land Developers & Builders in Nagpur, Maharashtra, registered with MahaRERA as P50500056394 on 31 May 2024. Possession is promised by 31 Mar 2027. 16 of the 25 units on this registration are recorded sold or booked.

At a glance

Project

  • NameNew Savera-1
  • TypePlotted
  • Location
    • Godhani Road
    • Mouza- Godhni
    • Godhani (Railway)
    • Nagpur (Rural)
    • Nagpur
    • 441203
  • Pincode441203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500056394
  • ReraGenie IDRG-MH-82902

Builder

  • NameNew Savera Land Developers & Builders
  • Entity typePartnership
  • PartnerSunil Purushottam Palekar

Key dates

this monthRegisteredMay 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 May 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed91 files

Current status

64%16 of 25 units booked

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes50%
Street LightingYes45%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,670 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jun 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 1 and 2, House No 105, Ground Floor, Kolte layout, godhani railway, Nagpur 441123

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Waghmare
ArchitectNiraj Baingane
EngineerS P Sawarkar
EngineerNiraj Baigane
Chartered AccountantCA Abhinav Welekar Welekar
Chartered AccountantAPJ & Associates
Chartered Accountantpravin Dhiran & Company
PartnerRole in project
New Savera Land Developers & Builders-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1_Form 1.pdf30 Apr 2026
Withdrawal Update Form 2File: 2_Form 2.pdf30 Apr 2026
Withdrawal Update Form 3File: Form-3 31-12-2025.pdf30 Apr 2026
Withdrawal Update Form 1File: Form-1 31-12-2025.pdf18 Feb 2026
Withdrawal Update Form 2File: Form-2 31-12-2025.pdf18 Feb 2026
Withdrawal Update Form 3File: Form-3 31-12-2025.pdf18 Feb 2026
Withdrawal Update Form 1File: Form-1 30-09-2025.pdf3 Nov 2025
Withdrawal Update Form 2File: Form-2 30-09-2025.pdf3 Nov 2025
Withdrawal Update Form 3File: Form -3 30-09-2025 Sign.pdf3 Nov 2025
Form 5 (FY 2024-2025)File: Form-5 31-03-2025 Sign.pdf3 Sep 2025
Form 2A (FY 2024-2025)File: 2A-31-03-2025_New savera.pdf21 Aug 2025
Withdrawal Update Form 1File: Form-1 30-06-2025.pdf20 Aug 2025
Withdrawal Update Form 1File: Form-1 30-06-2025.pdf20 Aug 2025
Withdrawal Update Form 2File: Form-2 30-06-2025.pdf20 Aug 2025
Withdrawal Update Form 2File: Form-2 30-06-2025.pdf20 Aug 2025
Withdrawal Update Form 3File: Form -3 30-06-2025 Sign.pdf20 Aug 2025
Withdrawal Update Form 3File: Form -3 30-06-2025 Sign.pdf20 Aug 2025
Withdrawal Update Form 1File: Form-1 30-06-2025.pdf1 Aug 2025
Withdrawal Update Form 2File: Form-2 30-06-2025.pdf1 Aug 2025
Withdrawal Update Form 3File: Form -3 30-06-2025 Sign.pdf1 Aug 2025
Withdrawal Update Form 1File: Form-1_31-03-2025.pdf30 Jul 2025
Withdrawal Update Form 2File: Form-2_31-3-2025.pdf30 Jul 2025
Withdrawal Update Form 3File: Form 3_ 31-3-2025 - Copy.pdf30 Jul 2025
Withdrawal Update Form 1File: Form-1_31-03-2025.pdf1 Jul 2025
Withdrawal Update Form 2File: Form-2_31-3-2025.pdf1 Jul 2025
Withdrawal Update Form 3File: Form 3_ 31-3-2025 - Copy.pdf1 Jul 2025
Form 1File: Form 1-31-12-2024.pdf13 Jun 2025
Form 2File: Form-2_ 31-12-2024.pdf13 Jun 2025
Form 3File: Form 3_ 31-12-2024.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29- 31-12-2024.pdf13 Jun 2025
Form 1File: Form-1_31-03-2025.pdf13 Jun 2025
Form 2File: Form-2_31-3-2025.pdf13 Jun 2025
Form 3File: Form 3_ 31-3-2025.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29_ 31-3-2025.pdf13 Jun 2025
Form 1File: Form-1 30-06-2024.pdf12 Jun 2025
Form 2File: Form-2 30-06-2024.pdf12 Jun 2025
Form 3File: Form-3 30-06-2024.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29- 30-6-2024.pdf12 Jun 2025
Form 1File: Form-1_ 30-9-2024.pdf12 Jun 2025
Form 2File: Form-2 30-09-2024.pdf12 Jun 2025
Form 3File: Form-3 30-09-2024.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Annexure 29- 30-9-2024.pdf12 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate 30-9-2024.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate 31-3-2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-31-12-2024.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ 31-12-2024.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ 31-3-2025.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFIATE 31-12-2024.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFIATE1 31-03-2025.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE_ 31-12-2024.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE_31-3-2025.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Annexure 29- 30-6-2024.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Annexure 29- 30-9-2024.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Annexure 29- 31-12-2024.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Annexure 29_ 31-3-2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-06-2024.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-06-2024.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2024.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-06-2024.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-09-2024.pdf14 Jan 2025
Other - LegalFile: गोधनी_319_3_Satbara (1).pdf14 May 2024
Other - LegalFile: savera005 - Copy.pdf13 May 2024
Layout approvalFile: 10_Map.pdf1 May 2024
Building plan approval or NA orderFile: 7_NA.pdf1 May 2024
Building plan approval or NA orderFile: 7_Final Sanctioned letter.pdf1 May 2024
PAN CardFile: New savera land developers bulders PAN.pdf1 May 2024
Copy of the legal title reportFile: 4_Search Report.pdf1 May 2024
Details of encumbrances concerned to FinanceFile: 5A_ Financial Encumbrance.pdf1 May 2024
Details of encumbrances concerned to FinanceFile: 5B_Legal Encumbrance.pdf1 May 2024
Details of encumbrances concerned to LegalFile: 5A_ Financial Encumbrance.pdf1 May 2024
Details of encumbrances concerned to LegalFile: 5B_Legal Encumbrance.pdf1 May 2024
Copy of Layout Approval (in case of layout)File: 10_Map.pdf1 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_NA.pdf1 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_Final Sanctioned letter.pdf1 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 7_NA.pdf1 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 7_Final Sanctioned letter.pdf1 May 2024
Declaration about Commencement CertificateFile: 12_Declaration about commencemct certificate.pdf1 May 2024
Declaration in FORM BFile: 6_Form B.pdf1 May 2024
Disclosure of sold/ booked inventoryFile: 11_Annexure 29.pdf1 May 2024
CERSAI detailsFile: 17_Cersai declaration.pdf1 May 2024

How this compares with Nagpur

64%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep New Savera-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mouza- Godhni2,800+ in Nagpur

2 kmNew Savera-1Completed 14Lapsed / revoked 4Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 42 registered projects within 2 km.

Builder: New Savera Land Developers & Builders

New Savera Land Developers & Builders has 1 registration on MahaRERA, including New Savera-1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if New Savera-1 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of New Savera-1?

The registered promoter entity is New Savera Land Developers & Builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in New Savera-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for New Savera-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at New Savera-1?

The professionals named in the filing: Architect: Sachin Waghmare; Architect: Niraj Baingane; Engineer: S P Sawarkar; Engineer: Niraj Baigane; Chartered Accountant: CA Abhinav Welekar Welekar; Chartered Accountant: APJ & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in New Savera-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About New Savera-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save New Savera-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.