Completed No litigation declared Residential / Group Housing project

NEW CUFFE PARADE - LODHA DIORO AND ELISIUM

By MACROTECH DEVELOPERS LIMITED

RG-MH-09784 · RERA P51900000314 · Last updated on MahaRERA portal: 6 Jun 2024

Source: official MahaRERA filing

Red flags

  • 38 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2019Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
38Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

NEW CUFFE PARADE - LODHA DIORO AND ELISIUM is a Residential / Group Housing project by MACROTECH DEVELOPERS LIMITED in ., 400022, registered with MahaRERA as P51900000314 on 15 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2019. The completion date has moved by 12 months from the original filing. 38 complaints are on record with the regulator.

At a glance

Project

  • NameNEW CUFFE PARADE - LODHA DIORO AND ELISIUM
  • TypeResidential / Group Housing
  • Location
    • .
    • 400022
  • Pincode400022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900000314
  • ReraGenie IDRG-MH-09784

Builder

  • NameMACROTECH DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • ChairpersonsRAJENDRA NARPATMAL LODHA, RAJENDRA NARPATMAL LODHA
  • Other registrations140 more →
  • Completed126 of 141
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017First promiseJun 2018Revised toJun 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2017
  • Promised completion30 Jun 2019
  • Revised completionRevised to 30 Jun 2019 (originally 30 Jun 2018)
  • Buildings2 building records
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LODHA DIORO 41st Floor to 43rd FloorNA40000
LODHA ELISIUM 41st to 43rd FloorNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

LODHA DIORO 41st Floor to 43rd Floor82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
LODHA ELISIUM 41st to 43rd Floor82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 6 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Closed ParkingsYes100%

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered106
BuildingClosed/CoveredTotal
LODHA DIORO 41st Floor to 43rd Floor5353
LODHA ELISIUM 41st to 43rd Floor5353

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,607 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6278.7
Proposed, not sanctioned6,279 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDADAR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS DESAI & ASSOCIATES
EngineerK C SHAH CONSULTANTS
Chartered AccountantB B JAIN & ASSOCIATES
Chartered AccountantMSKA & ASSOCIATES
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900000601Jun 2018 → Jun 2019

Reason as filed by the promoterAs per the letter attached

Complaints filed with MahaRERA38

Case no.ComplainantRespondentFiled
CC006000000000012Sanjay PhulwariaLodha Developers Pvt. Ltd.26/10/2017
CC006000000001739PRAVIN MALSHI SHAHBELLISSIMO CROWN BUILDMART PVT LTD11/11/2017
CC006000000001273AAKASH GUPTABELLISSIMO CROWN BUILDMART PVT LTD(LODHA DEVELOPERS PVT LTD)01/11/2017
CC006000000056889SANJAY PHULWARIA AND PAROMITA PHULWARIAM/S LODHA DEVELOPERS LTD12/11/2018
CC006000000056939M/S. SORALITE REALTY LLPM/S LODHA DEVELOPERS LTD19/11/2018
CC006000000057011RAMONA ADIL VESUVALAM/S LODHA DEVELOPERS LTD26/11/2018
CC006000000057094RUPINDER SINGH ARORAM/S. LODHA DEVELOPERS LTD06/12/2018
CC006000000057136VIPUL JASWANTLAL SANGHAVI AND JASWANATLAL NANALAL SANGHAVIM/S LODHA DEVELOPERS LTD06/12/2018
CC006000000057204MRS VEENAKUMARI SEHGAL AND MR. LALIT SEHGALM/S LODHA DEVELOPERS LTD06/12/2018
CC006000000057206FALGUNI HEMANT SHETH AND HEMANT DEVIDAS SHETHM/S. LODHA DEVELOPERS LTD24/12/2018
CC006000000057207MRS USHA ASHOK JOHARI AND MR. PRASUN ASHOK JOHARIM/S. LODHA DEVELOPERS LTD24/12/2018
CC006000000057370ROYSTON MACHADO & ZANIA MACHADOM/S. LODHA DEVELOPERS LTD24/12/2018
CC006000000057423NIMESH INDRAVADAN SHAHM/S. LODHA DEVELOPERS LTD24/12/2018
CC006000000057442VISHNU BANWANI & NAFISA BANWANIM/S. LODHA DEVELOPERS LTD27/12/2018
CC006000000057444PAURUS DARUWALAM/S. LODHA DEVELOPERS LTD27/12/2018
CC006000000057445BHAVESH DOSHI & NEEPA dOSHIM/S. LODHA DEVELOPERS LTD27/12/2018
CC006000000057447SHAMMY JOSEPH AND NIMMI JOSEPHM/S. LODHA DEVELOPERS LTD27/12/2018
CC006000000057450RAKESH DAMODAR SHETTYM/S. LODHA DEVELOPERS LTD27/12/2018
CC006000000078557SHALINI SHUKLA AND ANOTHERM/S. LODHA DEVELOPERS LTD.09/04/2019
CC006000000078845AAMIR KHANM/S. LODHA DEVELOPERS LTD25/04/2019
CC006000000171937VIVEK GUPTAM/S. LODHA CROWN BUILDMART PVT LTD16/01/2020
CC006000000192200VIJAY RAMNIKLAL MEHTAM/S. LODHA DEVELOPERS16/01/2020
CC006000000056771Mr. Parminder Singh Thapar and Mrs. Roshna ThaparBellissimmo Crown Buildmart Private Limited (earlier known as Lodha Crown Buildmart Pvt. Ltd)30/10/2018
CC006000000054829KAMLESH SHAMBHULAL MAGHNANILODHA DEVELOPERS LIMITED08/06/2018
CC006000000057582ATLANTIS IT SOLUTION PRIVATE LIMITEDLODHA DEVELOPERS LIMITED (formerly known as Lodha Crown Buildmart Private Limited)12/01/2019
CC006000000057917Arzana Sharukh Daruwalla and Sharukh Hoshi DaruwallaLODHA DEVELOPERS PRIVATE LIMITED ( FORMERLY KNOWN AS LODHA CROWN BUILDMART PRIVATE LIMITED)04/02/2019
CC0060000000554401. DULICHAND BAID and 2. SUSHILA BAIDLODHA CROWN BUILDMART PVT. LTD.20/07/2018
CC006000000057378Gul MukheyLodha Crown Buildmart Private Limited20/12/2018
CC006000000057592Ramona MahtaniLodha Crown Buildmart Pvt. Ltd.08/01/2019
CC006000000057698Vishal BakshiLodha Crown Buildmart Private Limited22/01/2019
CC006000000056196Aditya ThakurLodha Crown Buildmart Pvt Ltd (Lodha Developers Pvt Ltd)17/09/2018
CC006000000057426Smt. Sujata Satish BoraLodha Developers Limited24/12/2018
CC006000000078405ABHAY KUMARLODHA DEVELOPERS LIMITED08/03/2019
CC006000000078572Neelam KaurLodha Developers Limited20/03/2019
CC006000000089796Sameer Masood Divker and Rafiya Sameer DivkerMarcotech Developers Limited27/06/2019
CC006000000078859vijay tilakLodha crown Buildmart pvt ltd12/04/2019
CC006000000078452Farzad Sheriar JehaniLodha Developers Limited12/03/2019
CC006000000375058Sujeet SinghMACROTECH DEVELOPERS LIMITED03/04/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jul 2021

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Sold Unsold - NEW CUFFE PARADE - LODHA DIORO AND ELISIUM 41st to 43rd Floor - P519000003146 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - NEW CUFFE PARADE - LODHA DIORO AND ELISIUM - P51900000314 - Dec23.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: NEW CUFFE PARADE - LODHA DIORO AND ELISIUM 41st to 43rd Floor P51900000314.pdf22 Dec 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Certificate-Elisium.pdf13 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Certificate-Dioro.pdf13 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 77 NCP DIORO,ELISIUM(40 FLOORS).pdf15 Oct 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Dioro Elisium Final.pdf2 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NCP_OCv1.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 78 NCP Dioro Elisium.pdf27 Oct 2020
Layout approvalFile: Layout Plan_14092020.pdf14 Sep 2020
Copy of Layout Approval (in case of layout)File: Layout Plan_14092020.pdf14 Sep 2020
Form 2AFile: NCP Dioro and Elsium 41 to 43 Floor.pdf25 Aug 2020
Certificates of CA (Form 5)File: NCP Dioro Elisium.pdf30 Sep 2019
Details of encumbrancesFile: NCP Dioro Elisium.pdf19 Aug 2019
Form 2AFile: DIORO ELISIUM.pdf27 Jun 2019
OtherFile: LDL to MDL.pdf28 May 2019
Details of encumbrancesFile: NCP Dioro Elisium.pdf25 Feb 2019
Details of encumbrancesFile: NCP Dioro Elisium.pdf16 Nov 2018
Copy of the legal title reportFile: 11_Supplemental Report on Title dated 19_09_2018.pdf13 Nov 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: DIORO.pdf13 Nov 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: ELISIUM.pdf13 Nov 2018
Certificates of CA (Form 5)File: LODHA DIORO ELISIUM.pdf1 Oct 2018
Details of encumbrancesFile: Lodha Dioro Elisium.pdf13 Aug 2018
Layout approvalFile: Key Plan block plan.pdf13 Jul 2018
Building plan approvalFile: Key Plan block plan.pdf13 Jul 2018
Building plan approvalFile: 41st floor dioro elisium enchante.pdf13 Jul 2018
Building plan approvalFile: 42nd floor dioro elisium enchante.pdf13 Jul 2018
Building plan approvalFile: 43rd floor dioro elisium enchante.pdf13 Jul 2018
Copy of Layout Approval (in case of layout)File: Key Plan block plan.pdf13 Jul 2018
Building Plan Approval (IOD)File: Key Plan block plan.pdf13 Jul 2018
Building Plan Approval (IOD)File: 41st floor dioro elisium enchante.pdf13 Jul 2018
Building Plan Approval (IOD)File: 42nd floor dioro elisium enchante.pdf13 Jul 2018
Building Plan Approval (IOD)File: 43rd floor dioro elisium enchante.pdf13 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: 1.pdf13 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: 2.pdf13 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: 3.pdf13 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: 4.pdf13 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: 5.pdf13 Jul 2018
Copy of the legal title reportFile: NCP all TR Upto 28_03_18.pdf30 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NCP DIORO ELISIUM.pdf6 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DIORO ELISIUM_FORM 1.pdf5 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LODHA DIORO ELISIUM.pdf5 Apr 2018
Details of encumbrancesFile: NCP Dioro Elisium.pdf30 Mar 2018
Certificates of CA (Form 3)File: NCP Dioro Elisium.pdf29 Mar 2018
Certificates of CA (Form 3)File: dioro elisium.pdf28 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: Amended C C 02 03 2017 NCP.pdf19 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: CC 01092017.pdf19 Jan 2018
Proforma of Allotment letterFile: ATS (NCP) - v3 - 2 November 2017.pdf6 Nov 2017
Layout approvalFile: Tower Dioro Elisium.pdf11 Jul 2017
Copy of Layout Approval (in case of layout)File: Tower Dioro Elisium.pdf11 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lodha Dioro and Elisium Form 1 Part one.pdf11 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lodha Dioro and Elisium Form 1 Part two.pdf11 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Lodha Dioro and Elisium.pdf11 Jul 2017
Certificates of CA (Form 3)File: Lodha Dioro and Elisium Form 3.pdf11 Jul 2017
Details of encumbrancesFile: Encumbrances Lodha Dioro and Elisium.pdf10 Jul 2017
Building plan approvalFile: 77.pdf8 Jul 2017
Building plan approvalFile: 78.pdf8 Jul 2017
Building plan approvalFile: 80.pdf8 Jul 2017
Building plan approvalFile: 81.pdf8 Jul 2017
Building plan approvalFile: 82.pdf8 Jul 2017
Building plan approvalFile: 132.pdf8 Jul 2017
PAN CardFile: BELLISSIMO CROWN PAN CARD.pdf8 Jul 2017
Copy of the legal title reportFile: Merged File (Final).pdf8 Jul 2017
Building Plan Approval (IOD)File: 77.pdf8 Jul 2017
Building Plan Approval (IOD)File: 78.pdf8 Jul 2017
Building Plan Approval (IOD)File: 80.pdf8 Jul 2017
Building Plan Approval (IOD)File: 81.pdf8 Jul 2017
Building Plan Approval (IOD)File: 82.pdf8 Jul 2017
Building Plan Approval (IOD)File: 132.pdf8 Jul 2017
Declaration in FORM BFile: dioro and elisium.pdf8 Jul 2017
Proforma of Allotment letterFile: ATS Allotment Letter Amenities.pdf8 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, Thane140Mar 2022CompletedFeb 2026Jun 2024

Keep NEW CUFFE PARADE - LODHA DIORO AND ELISIUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near .

2 kmNEW CUFFE PARADE - LODHACompleted 20Lapsed / revoked 7Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: MACROTECH DEVELOPERS LIMITED

Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if NEW CUFFE PARADE - LODHA DIORO AND ELISIUM is delayed beyond 30 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEW CUFFE PARADE - LODHA DIORO AND ELISIUM?

The registered promoter entity is MACROTECH DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEW CUFFE PARADE - LODHA DIORO AND ELISIUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NEW CUFFE PARADE - LODHA DIORO AND ELISIUM?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NEW CUFFE PARADE - LODHA DIORO AND ELISIUM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEW CUFFE PARADE - LODHA DIORO AND ELISIUM?

The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEW CUFFE PARADE - LODHA DIORO AND ELISIUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEW CUFFE PARADE - LODHA DIORO AND ELISIUM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEW CUFFE PARADE - LODHA DIORO AND ELISIUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.