ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / NEW AVANTI CHSL

Registered No litigation declared Residential / Group Housing project

NEW AVANTI CHSL

By BALAJI ENTERPRISES

RG-MH-30194 · RERA P51800030643 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 19 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 19 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 90%
5 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

NEW AVANTI CHSL is a Residential / Group Housing project by BALAJI ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030643 on 8 Sep 2021. Possession is promised by 31 Oct 2026. The completion date has moved by 19 months from the original filing. 13 of the 18 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameNEW AVANTI CHSL
  • TypeResidential / Group Housing
  • Location
    • DAULAT NAGAR ROAD NO 10
    • BORIVALI EAST
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • RERA no.P51800030643
  • ReraGenie IDRG-MH-30194

Builder

  • NameBALAJI ENTERPRISES
  • Entity typeOthers
  • Named personSHANUP DHARIA
  • Other registrations10 more →
  • Completed3 of 11
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2021First promiseMar 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Sep 2021
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed113 files

Current status

72%13 of 18 units booked
95.7%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEW AVANTI CHSLNA161418018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

NEW AVANTI CHSL: 66% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area475 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
UPASHNA DEVELOPERSBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityBMC
Permissible FSI1475.0
Proposed, not sanctioned1,475 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVILE PARLE, MUMBAI - 400057
Estimated costRs 5.67 cr
Cost incurredRs 5.43 cr
Work done95.66%
BuildingWingEstimatedIncurred
NEW AVANTI CHSLNARs 5.67 crRs 5.43 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHIRAG RAYANI
EngineerCHIRAG MAKANI
Chartered AccountantMIRAL ZATAKIA & ASSOCIATES
Chartered AccountantRAHUL D SINGH & CO
Chartered AccountantMIRAL ZATAKIA
PartnerRole in project
BALAJI ENTERPRISES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800028255Mar 2025 → May 2026

Reason as filed by the promoterWe are making an application to extend the project registration with Maharasht Real Estate Regulatory Authority. We have to revise the project timeline due following reasons- (1) The application for the Further/Amended Intimation of Disapproval (IOD) fo this project was submitted on 16/08/24. This Further/Amended IO underwent an approval process Insting 4 months and was ultimately sanctioned on 14/11/2024.. (2) The Promoter submitted an application for the Further/Amended Commencement Certificate (CC) to the MCGM. The Further/Amended CC was approved on 21/02/2025., (3) The MCGM issued a cessat

EA12062621345Mar 2025 → Oct 2026

Reason as filed by the promoter(1) The application for the Further/Amended Intimation of Disapproval (IOD) for this project was submitted on 16/08/2024.. This Further/Amended IOD underwent an approval process lasting 4 months and was ultimately sanctioned on 14/11/2024 (2) The Promoter submitted an application for the Further/Amended Commencement Certificate (CC) to the MCGM. The Further/Amended CC was approved on 21/02/2025, (3) The MCGM issued a cessation of work order, thereby halting all project activities. This order became effective on 31.12.2024 and remained in force until its withdrawal on 29.01.2025. Consequently,

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf6 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf6 Jun 2026
Withdrawal Update Form 2File: DocScanner 06-Jun-2026 04-34 PM.pdf6 Jun 2026
Withdrawal Update Form 2File: engineer certificate Q4 25-26.pdf6 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf6 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf6 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf21 May 2026
Withdrawal Update Form 2File: FORM 2.pdf21 May 2026
Withdrawal Update Form 3File: FORM 3.pdf21 May 2026
Withdrawal Update Form 1File: 5233 AVANTI RERA FORM I JUNE 2025 (1).pdf9 Oct 2025
Withdrawal Update Form 2File: form 2 new avanti chsl.pdf9 Oct 2025
Withdrawal Update Form 3File: DocScanner 04-Oct-2025 11-22 AM.pdf9 Oct 2025
Form 5 (FY 2021-2022)File: forrm 5 21-22.pdf22 May 2025
Form 1File: FORM 1 12 21.pdf21 May 2025
Form 2File: FORM 2 12 21.pdf21 May 2025
Form 3File: form 3 dec 21.pdf21 May 2025
Form 1File: form 3 dec 21.pdf21 May 2025
Form 2File: FORM 2 12 21.pdf21 May 2025
Form 3File: FORM 1 12 21.pdf21 May 2025
Form 3File: form 3 dec 21.pdf21 May 2025
Form 2File: FORM 2 12 21.pdf21 May 2025
Form 1File: FORM 1 12 21.pdf21 May 2025
Form 1File: FORM 2 12 21.pdf21 May 2025
Form 2File: form 3 dec 21.pdf21 May 2025
Form 3File: FORM 1 12 21.pdf21 May 2025
Form 1File: FORM 1 12 22.pdf21 May 2025
Form 2File: FORM 2 12 22.pdf21 May 2025
Form 3File: form 3 dec 22.pdf21 May 2025
Form 1File: form 3 dec 22.pdf21 May 2025
Form 2File: FORM 1 12 22.pdf21 May 2025
Form 3File: FORM 2 12 22.pdf21 May 2025
Form 1File: form 3 dec 22.pdf21 May 2025
Form 2File: FORM 2 12 22.pdf21 May 2025
Form 3File: FORM 1 12 22.pdf21 May 2025
Form 1File: form 3 dec 22.pdf21 May 2025
Form 2File: FORM 1 12 22.pdf21 May 2025
Form 3File: FORM 2 12 22.pdf21 May 2025
Form 1File: form 3 dec 22.pdf21 May 2025
Form 2File: FORM 2 12 22.pdf21 May 2025
Form 3File: FORM 1 12 22.pdf21 May 2025
Form 1File: form 3 dec 22.pdf21 May 2025
Form 2File: FORM 1 12 22.pdf21 May 2025
Form 3File: FORM 2 12 22.pdf21 May 2025
Form 1File: form 3 dec 22.pdf21 May 2025
Form 2File: FORM 2 12 22.pdf21 May 2025
Form 3File: FORM 1 12 22.pdf21 May 2025
Form 1File: form 3 dec 22.pdf21 May 2025
Form 2File: FORM 1 12 22.pdf21 May 2025
Form 3File: FORM 2 12 22.pdf21 May 2025
Form 1File: form 3 dec 22.pdf21 May 2025
Form 2File: FORM 2 12 22.pdf21 May 2025
Form 3File: FORM 1 12 22.pdf21 May 2025
Form 1File: form 3 dec 22.pdf21 May 2025
Form 2File: FORM 2 12 22.pdf21 May 2025
Form 3File: FORM 1 12 22.pdf21 May 2025
Form 5 (FY 2022-2023)File: CA FORM 5 22-23.pdf21 May 2025
Form 5 (FY 2023-2024)File: CA FORM 5 23-24.pdf21 May 2025
Form 5 (FY 2024-2025)File: CA FORM 5 24-25.pdf21 May 2025
Building plan approvalFile: 2440168Amendletter_signed.pdf21 Apr 2025
Declaration in FORM BFile: NOTORIZED FORM B.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 03 23.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 06 23.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 09 23.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 12 23.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 03 24.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 06 24.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 09 24.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 12 24.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 03 25.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 25.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 24.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 24.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 24.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 23.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 23.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 23.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 23.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 24.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 09 24.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 03 25.pdf21 Apr 2025

How this compares with Mumbai Suburban

72%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 19 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEW AVANTI CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI EAST6,700+ in Mumbai Suburban

Builder: BALAJI ENTERPRISES

BALAJI ENTERPRISES has 11 registrations on MahaRERA, including KRUSHNA SHANTI APARTMENT A WING and ADITYA APPARTMENT. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NEW AVANTI CHSL is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEW AVANTI CHSL?

The registered promoter entity is BALAJI ENTERPRISES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEW AVANTI CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEW AVANTI CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEW AVANTI CHSL?

The professionals named in the filing: Architect: CHIRAG RAYANI; Engineer: CHIRAG MAKANI; Chartered Accountant: MIRAL ZATAKIA & ASSOCIATES; Chartered Accountant: RAHUL D SINGH & CO; Chartered Accountant: MIRAL ZATAKIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEW AVANTI CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEW AVANTI CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEW AVANTI CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.