Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NEST ELITE is a Residential / Group Housing project by LANDGE BORHADE REALTORS in Pune, Maharashtra, registered with MahaRERA as P52100078822 on 13 Jan 2025. Possession is promised by 31 Dec 2027. 7 of the 66 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.
At a glance
Project
- NameNEST ELITE
- TypeResidential / Group Housing
- Location
- BORHADEWADI ROAD
- MOSHI
- Borhadewadi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100078822
- ReraGenie IDRG-MH-23510
Builder
- NameLANDGE BORHADE REALTORS
- Entity typePartnership
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on13 Jan 2025
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed63 files
Current status
Figures as on 2 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B BUILDING | NA | 3 | 3 | 3 | 0 | 3 |
| A BUILDING | NA | 14 | 14 | 63 | 0 | 63 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 75%.
B BUILDING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A BUILDING26%
| Activity | Progress |
|---|---|
| Excavation | 75% |
| Basement (if any) | 75% |
| Podiums (if any) | 0% |
| Plinth | 75% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| B BUILDING | 3 | 3 |
| A BUILDING | 51 | 51 |
Land and ownership17
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHITAL RAMESH SASTE | Borhadewadi | Pune |
| SULBAI RAMCHANDRA SASTE | Moshi | Pune |
| CHANGUNABAI PRABHAKAR TAPKIR | Moshi | Pune |
| ULHAS DNYANOBA BORHADE | Borhadewadi | Pune |
| SHRIPATI DNYANOBA BORHADE | Borhadewadi | Pune |
| SARIKA SUNIL WAGASKAR | Borhadewadi | Pune |
| SANDIP BHIMRAO BORHADE | Moshi | Pune |
| SACHIN BHIMRAO BORHADE | Moshi | Pune |
| DILIP BABURAO BORHADE | Borhadewadi | Pune |
| SHRIKRUSHAN GULAB BORHADE | Borhadewadi | Pune |
| MIRABAI GULAB BORHADE | Borhadewadi | Pune |
| Tarabai Bhimrao Borhade | Borhadewadi | Pune |
| RAHUL SHRIPATI BORHADE | Borhadewadi | Pune |
| ANKUSH BABURO BORHADE | Borhadewadi | Pune |
| SAMBHAJI BABURAO BORHADE | Borhadewadi | Pune |
| SUDHIR BABURAO BORHADE | Borhadewadi | Pune |
| KALURAM BABURAO BORHADE | Borhadewadi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Chartered Accountant | Mohmedyasir A Bagwan |
| Chartered Accountant | CA Shubham S Bora |
| Partner | Role in project |
|---|---|
| LANDGE BORHADE REALTORS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Form 5 25-26.pdf | 2 Jun 2026 |
| Form 1File: Form 1 31032026.pdf | 20 Apr 2026 |
| Form 2File: Form 2 31032026.pdf | 20 Apr 2026 |
| Form 3File: Form 3 31032026_compressed.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold.pdf | 20 Apr 2026 |
| Form 1File: Form 1.pdf | 24 Jan 2026 |
| Form 2File: Form 2.pdf | 24 Jan 2026 |
| Form 3File: Form 3.pdf | 24 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of sold booked inventory 3.pdf | 24 Jan 2026 |
| Form 1File: Form 1 .pdf | 13 Oct 2025 |
| Form 2File: Form 2.pdf | 13 Oct 2025 |
| Form 3File: Form 3 1.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of sold booked inventory .pdf | 13 Oct 2025 |
| Form 5 (FY 2024-2025)File: Nest Eilte 24-25.pdf | 29 Sep 2025 |
| Form 1File: Form 1.pdf | 20 Jul 2025 |
| Form 2File: Form 2.pdf | 20 Jul 2025 |
| Form 3File: Form 3.pdf | 20 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of sold booked inventory 2.pdf | 20 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 8 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 May 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of sold booked inventory.pdf | 8 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTANTS CERTIFICATE 2.pdf | 6 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: C C Verification Email.pdf | 6 Jan 2025 |
| Other - FinanceFile: Self Declaration Reagarding Opening of 3 Rera Bank Accounts Declaration cum Undertaking.pd | 6 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: AFS 06-01-2025.pdf | 6 Jan 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B opening of Rera Designated Bank Accounts.pdf | 6 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Concerned To Finance .pdf | 24 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrances Concerned To Legal.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf | 24 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFIACATE.pdf | 24 Dec 2024 |
| CERSAI detailsFile: Undertaking For Cersai Report.pdf | 24 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 24 Dec 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances Concerned To Finance .pdf | 24 Dec 2024 |
| Details of encumbrances concerned to LegalFile: No Encumbrances Concerned To Legal.pdf | 24 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Other Real Estate Organizations 1.pdf | 24 Dec 2024 |
| Building plan approvalFile: 07 Building B plan.pdf | 20 Dec 2024 |
| Building plan approvalFile: 06 Section Plan.pdf | 20 Dec 2024 |
| Building plan approvalFile: 05 Front Elevation Section Plan _organized.pdf | 20 Dec 2024 |
| Building plan approvalFile: 04 Typical Floor Plans.pdf | 20 Dec 2024 |
| Building plan approvalFile: 04 Typical Floor Plans.pdf | 20 Dec 2024 |
| Building plan approvalFile: 03 Parking Floor Plan.pdf | 20 Dec 2024 |
| Building plan approvalFile: 02 Basement Floor Plan.pdf | 20 Dec 2024 |
| Layout approvalFile: 01 Layout Plan.pdf | 20 Dec 2024 |
| PAN CardFile: FIRM.pdf | 20 Dec 2024 |
| Copy of the legal title reportFile: Rera Draft Landge Borhade Realtors Search Report Nov 2024.pdf | 20 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: 01 Layout Plan.pdf | 20 Dec 2024 |
| Proforma of Allotment letterFile: Model Form of Allotment Letter.pdf | 20 Dec 2024 |
| Declaration in FORM BFile: STAMP PAPER FORM B MUMBAI MAHA RERA.pdf | 20 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 05 Front Elevation Section Plan _organized.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 02 Basement Floor Plan.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 03 Parking Floor Plan.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 04 Typical Floor Plans.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 04 Typical Floor Plans.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 06 Section Plan.pdf | 20 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 07 Building B plan.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Discolsure Of Sold Booked Inventory.pdf | 20 Dec 2024 |
| Declaration about Commencement CertificateFile: Declaration About commencement certificate.pdf | 20 Dec 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report For Allotment Letter.pdf | 20 Dec 2024 |
| Other - TechnicalFile: Declaration cum Undertaking.pdf | 20 Dec 2024 |
| Proforma of Agreement for saleFile: nest elite.pdf | 20 Dec 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure For Secured Unsecured Finance Availed For The Project .pdf | 20 Dec 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NEST ELITE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOSHI13,700+ in Pune
Filed coordinates, straight-line distance. 170 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: LANDGE BORHADE REALTORS
LANDGE BORHADE REALTORS has 1 registration on MahaRERA, including NEST ELITE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if NEST ELITE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NEST ELITE?
The registered promoter entity is LANDGE BORHADE REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NEST ELITE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NEST ELITE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NEST ELITE?
The professionals named in the filing: Chartered Accountant: Mohmedyasir A Bagwan; Chartered Accountant: CA Shubham S Bora. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEST ELITE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback