Home / Browse projects / Pune, Maharashtra / NB CRYSTAL B PHASE III

Registration lapsed No litigation declared Residential / Group Housing project

NB CRYSTAL B PHASE III

By Nanasaheb Bhintade Spacess Pvt Ltd

RG-MH-70039 · RERA P52100034836 · Last updated on MahaRERA portal: 18 Oct 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

NB CRYSTAL B PHASE III is a Residential / Group Housing project by Nanasaheb Bhintade Spacess Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100034836 on 28 Apr 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameNB CRYSTAL B PHASE III
  • TypeResidential / Group Housing
  • Location
    • old Pune Mumbai Highway
    • Near Podar International School
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034836
  • ReraGenie IDRG-MH-70039

Builder

  • NameNanasaheb Bhintade Spacess Pvt Ltd
  • Entity typeCompany
  • Managing DirectorAnant Shivram Bhintade
  • DirectorsSunil Anant Bhintade, Anil Anantrao Bhintade, Malati Anant Bhintade
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

10 months past promisethis monthRegisteredApr 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C wingNA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

C wing: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes50%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,121 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9592.61
Proposed, not sanctioned9,593 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS No 63-2B Indralok Apt Pune Satara Road Natubaug Parvati Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrakash H Kanhekar
EngineerMalikarjun M Karguppi
Chartered AccountantA B Dahotre & Co Chartered Accountants
Chartered AccountantPRASAD SADVILKAR & ASSOCIATES CHARTERED ACCOUNTANTS
PartnerRole in project
Nanasaheb Bhintade Spacess Pvt Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 NB CRYSTAL PH III.pdf18 Oct 2025
Form 2File: NB CRYSTAL PHASE III FORM 2.pdf18 Oct 2025
Form 3File: Q2 FINAL Crystal Phase III - FORM 3 Chartered Accountant Certificate with UDIN.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory report.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 N B Crystal B Phase III.pdf3 Oct 2025
Form 1File: FORM 1 - NB CRYSTAL PH III.pdf2 Aug 2025
Form 2File: FORM 2 - NB CRYSTAL PH III.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory - NB Crystal PH III.pdf2 Aug 2025
Form 3File: Q1 FINAL Crystal Phase III - FORM 3 Chartered Accountant Certificate with UDIN.pdf2 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 NB Crystal Phase III.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory Crystal Phase III.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 NB Crystal Phase III.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FINAL Crystal Phase III - FORM 3 Chartered Accountant Certificate with UDIN (1).pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Crystal Phase III.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: N B crystal B phase 3.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FINAL Crystal Phase III - FORM 3 Chartered Accountant Certificate with UDIN.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Phase III.pdf20 Jan 2025
Proforma of Agreement for saleFile: Agreement Draft.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - NB CRYSTAL PHASE III.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: INVENTORY - NB CRYSTAL III.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - NB CRYSTAL PHASE III.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - NB CRYSTAL PHASE III.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: N B Crystal Phase III Form 5 FY 2023-24.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - NB CRYSTAL PHASE III.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - NB CRYSTAL PHASE III.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory details.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - NB CRYSTAL PHASE III.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - NB CRYSTAL PHASE III.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A NB Crystal Phase III.pdf5 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - NB CRYSTAL PHASE III.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - NB CRYSTAL PHASE III.pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory details.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - NB CRYSTAL PHASE III.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 NB CRYSTAL PHASE III.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory details.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NB CRYSTAL PHASE III.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 NB CRYSTAL PHASE III.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Crystal Phase III 22-23 form 5.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 NB Crystal Phase III.pdf1 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 NB Crystal Phase III.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form 2 NB Crystal Phase III.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-2 CA signed final crystal Phase III_compressed (1).pdf28 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory details_compressed.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Crystal phase 3 form 3.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: crystal III MARCH-23.pdf10 Aug 2023
Disclosure of sold/ booked inventoryFile: Slod Unsold Inventory.pdf9 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31_12_22 Phase 3.pdf4 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NB Crystal A Phase III.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: N B Crystal Phase III Form 3 Q-4 FY 22-23_.pdf6 Jul 2023
Building plan approvalFile: Temp00022.PDF24 Jun 2023
Building plan approvalFile: Temp00023.PDF24 Jun 2023
Building plan approvalFile: Temp00024.PDF24 Jun 2023
Building plan approvalFile: Temp00025.PDF24 Jun 2023
Building plan approvalFile: Temp00026.PDF24 Jun 2023
Building plan approvalFile: Temp00027.PDF24 Jun 2023
Building plan approvalFile: Temp00028.PDF24 Jun 2023
Copy of the legal title reportFile: Search Report Plot B.pdf24 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Temp00022.PDF24 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Temp00023.PDF24 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Temp00024.PDF24 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Temp00025.PDF24 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Temp00026.PDF24 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Temp00027.PDF24 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Temp00028.PDF24 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 0509_ 23 31-05-23.pdf24 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Temp00021.PDF24 Jun 2023
Proforma of Agreement for saleFile: Revised Agreement Draft Phase III 24_06_23 PDF.pdf24 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_DEC-22 PH 3_compressed.pdf2 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate 30_06_22 PH 3_compressed.pdf2 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate 30_09_22 PH 3_compressed.pdf2 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate 31_12_22 PH 3_compressed.pdf2 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3 31_12_22 Phase 3.pdf2 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30_06_22 Phase 3.pdf2 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30_09_22 Phase 3.pdf2 May 2023
Layout approvalFile: 1.PDF25 Apr 2022
Building plan approvalFile: 2.PDF25 Apr 2022
Building plan approvalFile: 3.PDF25 Apr 2022
Building plan approvalFile: 4.PDF25 Apr 2022
Building plan approvalFile: 5.PDF25 Apr 2022
Building plan approvalFile: 6.PDF25 Apr 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
N B PearlNear Paunjai Temple Vadgaon budruk Tal Haveli Dist Pune 41104191CompletedMar 2022Jan 2021
N B SquareAmbegaon Bk Tal Haveli Dist Pune32CompletedMar 2019Dec 2018
Ganesh GracelandAmbegaon Bk Pune Mumbai Bypass Tal Haveli Pune164CompletedMay 2017Apr 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NB CRYSTAL B PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Podar International School13,700+ in Pune

2 kmNB CRYSTAL B PHASE IIICompleted 78Lapsed / revoked 28Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 161 registered projects within 2 km.

Builder: Nanasaheb Bhintade Spacess Pvt Ltd

Nanasaheb Bhintade Spacess Pvt. Ltd. has 5 registrations on MahaRERA, including N B OPAL PHASE -I and N B Opal Phase II. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that NB CRYSTAL B PHASE III shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NB CRYSTAL B PHASE III is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NB CRYSTAL B PHASE III?

The registered promoter entity is Nanasaheb Bhintade Spacess Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NB CRYSTAL B PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NB CRYSTAL B PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NB CRYSTAL B PHASE III?

The professionals named in the filing: Architect: Prakash H Kanhekar; Engineer: Malikarjun M Karguppi; Chartered Accountant: A B Dahotre & Co Chartered Accountants; Chartered Accountant: PRASAD SADVILKAR & ASSOCIATES CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NB CRYSTAL B PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NB CRYSTAL B PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NB CRYSTAL B PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.