Registration lapsed No litigation declared Others project

NAVRANG OASIS

By Oxford Realtors (India) Pvt.Ltd.

RG-MH-04189 · RERA P51800021423 · Last updated on MahaRERA portal: 17 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 18 months past the filed date
  • 4 complaints at MahaRERA
  • Completion date moved by 29 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2025Possession promised18 months past this date
8 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
22 of 124Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

NAVRANG OASIS is a Others project by Oxford Realtors (India) Pvt.Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800021423 on 28 Jun 2019. Possession was promised by 30 Apr 2025 and is now 18 months past that date. The completion date has moved by 29 months from the original filing. 102 of the 124 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameNAVRANG OASIS
  • TypeOthers
  • Location
    • SV ROAD
    • RAM MANDIR
    • Borivali
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • RERA no.P51800021423
  • ReraGenie IDRG-MH-04189

Builder

  • NameOxford Realtors (India) Pvt.Ltd.
  • Entity typeCompany
  • Managing DirectorParbat Ramji Patel

Key dates

18 months past promisethis monthRegisteredJun 2019First promiseNov 2022Revised toApr 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Jun 2019
  • Promised completion30 Apr 2025
  • Revised completionRevised to 30 Apr 2025 (originally 1 Nov 2022)
  • Buildings1 building record
  • Documents filed128 files

Current status

82%102 of 124 units booked

Figures as on 17 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NAVRANG OASISNA281811113124

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

NAVRANG OASIS: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.53%

Progress on shared amenities15

As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Open Space62

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,184 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY
Permissible FSI8734.18
Proposed, not sanctioned3,078 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCICI Bank Ltd, R P G Tower, 248, Andheri - Kurla Rd, S B Singh Colony, J B Nagar, Andheri East, Mumb

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE MODULERS
EngineerJACOB DSOUZA
Chartered AccountantRD LUKAD AND CO
PartnerRole in project
Oxford Realtors (India) Pvt.Ltd.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005950Nov 2022 → Oct 2023

Reason as filed by the promoterDUE TO DELAY IN COMMENCEMENT CERTIFICATE WE WOULD LIKE TO REQUEST AUTHORITY TO GRANT EXTENSION FOR FURTHER 12 MONTHS.

EXT51800024949Nov 2022 → Apr 2025

Reason as filed by the promoterDue to the project was initially launched by Old Developers in 2005. However, from 2005 to 2018, по substantial development activity took place. In the year 2018, society terminated the old development agreement and execute development agreement with us. Further we Oxford Realtors (India) Pvt Ltd. took over the project and settle all outstanding dues and Claims of old developer which took our time and got delay in our project. After despite the challenges presented by the COVID-19 pandemic, we Oxford Realtors (India) Pvt Ltd. commenced excavation work in 2020-2021. Over the following three yea

Litigation declared2

CaseCourtStatus
2774/2021THE HIGH COURT OF JUDICATURE AT BOMBAYDISPOSED
6953/2020THE HIGH COURT OF JUDICATURE AT BOMBAYDISPOSED

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000161459Sharad Vasudeo Koli and Vasudeo Punaji KoliOxford Realtors India Pvt Ltd07/11/2019
CC006000000192218Savita Jagannath WorlikarOxford Realtors ( India ) Pvt Ltd17/01/2020
CC006000000292873ZAKIR RAZZAK CHUNAWALAOXFORD REALTORS (INDIA) PVT LTD03/10/2022
CC006000000303481Sachin Jayant MayekarHiren & Parbhat Patel11/12/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2019-2020)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20).pdf17 Mar 2026
Form 5 (FY 2020-2021)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf17 Mar 2026
Form 5 (FY 2021-2022)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf17 Mar 2026
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (1).pdf17 Mar 2026
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) (1).pdf17 Mar 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 22-01-2025 Form - 2 Engineers Certificate.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: SoldUnsold Details.pdf29 Jan 2025
Certificates of CA (Form 3)File: form 3.pdf28 Jan 2025
Certificates of CA (Form 3)File: Form - 3 Architect Oct To Dec 2024 (1).pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf25 Jan 2025
Certificates of CA (Form 3)File: CA Form 3 JULY-24-SEP-24.PDF11 Dec 2024
Declaration in FORM BFile: 26-11-2024 Form B.PDF7 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf5 Dec 2024
Certificates of CA (Form 3)File: form 3.PDF3 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Disclosure (1).pdf27 Nov 2024
Declaration about Commencement CertificateFile: declaration cc.pdf27 Nov 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf27 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-9-2024 Architect Certificate Form 1 of Oxford Realtors.PDF26 Nov 2024
Certificates of CA (Form 3)File: form 3.PDF21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM-5 FOR 18-19.PDF12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 FOR 19-20.pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 FOR 22-23.PDF12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FOR 23-24.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (2).pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf15 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 OASIS.PDF13 May 2024
Certificates of CA (Form 3)File: FORM 3 OASIS.pdf13 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Dec 23.PDF5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23.PDF5 Feb 2024
Certificates of CA (Form 3)File: Form 3 CA Certificate Dec 23.PDF5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM 2.PDF1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FROM 2A 21-2022.pdf1 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FROM 2A 22-2023.pdf1 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2023 FORM 1 ARCHITECT CERT.pdf31 Oct 2023
Certificates of CA (Form 3)File: 19-10-2023 CA FORM 3.pdf31 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-06-2023 FORM 1 ARCHIT CERTIFICATE.PDF22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - AP 23 TO JUNE 23 OASIS.PDF22 Aug 2023
Certificates of CA (Form 3)File: CA form 3.pdf29 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: 03-03-2023 FULL CC NAVRANG OASIS.pdf15 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13-05-2023 form 2 engineer certificate.pdf15 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2023 FORM 1 HARSHVARDHAN CHS.pdf13 May 2023
Certificates of CA (Form 3)File: Form-3 Oxford.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM 2.pdf28 Jan 2023
Certificates of CA (Form 3)File: 24-01-2023 FROM 3 CA.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 07-11-2022 FORM 5 ANNUAL REPORT 2021-22.pdf25 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKING INV.pdf19 Jan 2023
Building plan approvalFile: IOA.pdf23 Sep 2022
Layout approvalFile: PLANS 1.pdf23 Sep 2022
Layout approvalFile: PLANS 2.pdf23 Sep 2022
Layout approvalFile: PLANS 3.pdf23 Sep 2022
Layout approvalFile: PLANS 4.pdf23 Sep 2022
Layout approvalFile: PLANS 5.pdf23 Sep 2022
Layout approvalFile: PLANS 6.pdf23 Sep 2022
Layout approvalFile: PLANS 7.pdf23 Sep 2022
Layout approvalFile: PLANS 8.pdf23 Sep 2022
Layout approvalFile: PLANS 9.pdf23 Sep 2022
Layout approvalFile: PLANS 10.pdf23 Sep 2022
Layout approvalFile: PLANS 11.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 1.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 2.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 3.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 4.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 5.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 6.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 7.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 8.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 9.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 10.pdf23 Sep 2022
Copy of Layout Approval (in case of layout)File: PLANS 11.pdf23 Sep 2022
Building Plan Approval (IOD)File: IOA.pdf23 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 07-07-2022 FORM 1 ARCHITECT CERTIFICATE.pdf15 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01-07-2022 Engineer Form 2_R.pdf15 Jul 2022
Disclosure of sold/ booked inventoryFile: 30-06-2022 LIST OF INVENTORY.pdf15 Jul 2022
Certificates of CA (Form 3)File: CA form 3.pdf14 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf13 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1.pdf13 Apr 2022
Disclosure of sold/ booked inventoryFile: dislcosure of inventory.pdf13 Apr 2022
Certificates of CA (Form 3)File: CA FORM 3.pdf11 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM 1.pdf11 Jan 2022

How this compares with Mumbai Suburban

82%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 29 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAVRANG OASIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAM MANDIR6,700+ in Mumbai Suburban

Builder: Oxford Realtors (India) Pvt.Ltd.

Oxford Realtors (India) Pvt.Ltd. has 1 registration on MahaRERA, including NAVRANG OASIS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that NAVRANG OASIS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NAVRANG OASIS is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAVRANG OASIS?

The registered promoter entity is Oxford Realtors (India) Pvt.Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAVRANG OASIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NAVRANG OASIS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NAVRANG OASIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAVRANG OASIS?

The professionals named in the filing: Architect: SPACE MODULERS; Engineer: JACOB DSOUZA; Chartered Accountant: RD LUKAD AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAVRANG OASIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAVRANG OASIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAVRANG OASIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.