Registration lapsed No litigation declared Others project

NAVRANG NAVKAR

By OXFORD NAVRANG REALTY LLP

RG-MH-68751 · RERA P51800047342 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 6 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2026Possession promised6 months past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
4 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

NAVRANG NAVKAR is a Others project by OXFORD NAVRANG REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047342 on 20 Oct 2022. Possession was promised by 30 Apr 2026 and is now 6 months past that date. The completion date has moved by 6 months from the original filing. 76 of the 80 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameNAVRANG NAVKAR
  • TypeOthers
  • Location
    • S V ROAD
    • GOREGAON WEST
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • RERA no.P51800047342
  • ReraGenie IDRG-MH-68751

Builder

  • NameOXFORD NAVRANG REALTY LLP
  • Entity typePartnership
  • PartnerPARBAT RAMJI PATEL

Key dates

6 months past promisethis monthRegisteredOct 2022First promiseOct 2025Revised toApr 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Oct 2022
  • Promised completion30 Apr 2026
  • Revised completionRevised to 30 Apr 2026 (originally 31 Oct 2025)
  • Buildings1 building record
  • Documents filed75 files

Current status

95%76 of 80 units booked
108.2%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NAVRANG NAVKARNA2422671380

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

NAVRANG NAVKAR: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area722 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jul 2025
LandownerVillageDistrict
GOREGAON NAVNIRMATA CO-OP HOUSING SOCIETY LTDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI5281.53
Proposed, not sanctioned5,282 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJ P NAGAR, BANGALORE
Estimated costRs 27.00 cr
Cost incurredRs 29.20 cr
Work done108.16%
BuildingWingEstimatedIncurred
NAVRANG NAVKARNARs 27.00 crRs 29.20 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE MOULDERS CHANDAN
EngineerOM GURUDATTA CONSTRCTOR
Engineerjacob dosuza
Chartered AccountantNEHALI & CO
PartnerRole in project
OXFORD NAVRANG REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA10112518288Oct 2025 → Apr 2026

Reason as filed by the promoterThe Promoter respectfully submits that the project completion date was earlier proposed as 31/10/2025. However, the Occupation Certificate (OC) from the competent authority was received on 14/01/2026, and as per the provisions of MahaRERA, the project is considered legally completed only upon receipt of the OC. Further, while uploading the OC documents on the MahaRERA portal, it was observed that the BUA, number of floors, and number of units mentioned in the application do not match with the details reflected in the OC plan. In this regard, the Promoter has submitted an affidavit undertaking

Litigation declared2

CaseCourtStatus
1202 OF 2019/2019MUMBAI HIGH COURTARBITRATION
4688 OF 2020/2020MUMBAI HIGH COURTARBITRATION

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf11 May 2026
Withdrawal Update Form 2File: FORM 2.pdf11 May 2026
Withdrawal Update Form 3File: FORM 3.pdf11 May 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1 OXFORD NAVRANG REALTY LLP.pdf17 Jan 2026
Withdrawal Update Form 2File: form 2 (7).pdf17 Jan 2026
Withdrawal Update Form 3File: OXFORD NAVRANG FORM 3.pdf17 Jan 2026
Form 2A (FY 2024-2025)File: FORM 2 A NAVRANG NAVKAR.pdf10 Nov 2025
Withdrawal Update Form 1File: FORM 1 NAVRANG NAVKAR.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf16 Oct 2025
Withdrawal Update Form 3File: FORM 3 OXFORD NAVRANG REALTY LLP.pdf16 Oct 2025
Commencement certificateFile: navkar Full CC approved 17 07 2023 (1).pdf19 Jul 2025
Building plan approvalFile: 04-08-2022 AMENDED IOA PLAN NAV NIRMATA (2)_3-end (1)_5-end (1).pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARCH 25.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC NAVRANG NAVKAAR.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 NAVKAR OCT 23 TO DEC 23.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 NAVKAR APRIL 24 TO JUNE 24.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 NAVKAR JULY 24 TO SEPT 24.PDF30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 NAVKAR OCT 24 TO DEC 24.PDF30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 NAVKAR JULY 23 TO SEP 23.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 CA NAVKAR JULY 24 TO SEP 24.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICAT_OCT 2024 TO DEC 2024.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 CA NAVKAR APRIL 24 TO JUNE 24.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- navrang navkar Dec -23.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA NAVKAR JULY 23 TO SEP 23.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE OCT 22 TO DEC 2022.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 JAN 23 TO MARCH 23 NAVKAR.PDF30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 AP 23 TO JUNE 23 NAVKAR.PDF30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 NAVKAR JAN 24 TO MARCH 24.PDF30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: april to june 24 form 2.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: june to sept form 2.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: april to june 24 form 2.pdf17 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: june to sept form 2.pdf17 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22-23 form 2 A.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 NAVKAR MARCH 24.PDF18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A NAVKAR MARCH 24.PDF18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- navrang navkar Dec -23.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2023 FORM 1 NAV NIRMATA CHS.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2023 FORM 1 ARCHITECT NAVNIRMATA.PDF21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 JAN 23 TO MARCH 23 NAVKAR.PDF21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 AP 23 TO JUNE 23 NAVKAR.PDF21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM-3 JAN 23 TO MAR 23 NAVKAR.PDF19 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM-3 AP 23 TO JUNE 23 NAVKAR.PDF19 Aug 2023
Proforma of Agreement for saleFile: Final Draft Sale Agreement.pdf2 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200249348330_For_Asset_Based_Search_11_10_2022_18_31_37_908.pdf11 Oct 2022
Proforma of Allotment letterFile: RERA Agreement for Sale - Goregaon Navnirmata CHS - Track mode.pdf11 Oct 2022
Deviation Report with respect to model copy of AgreementFile: DEVATION REPORT ON AGREEMENT OF SALES.pdf11 Oct 2022
Layout approvalFile: AMENDED IOA PLAN_3-end_1-3.pdf26 Sep 2022
Layout approvalFile: AMENDED IOA PLAN_3-end_4-end.pdf26 Sep 2022
Details of encumbrances concerned to FinanceFile: encumbrance fianancial.pdf26 Sep 2022
Details of encumbrances concerned to LegalFile: encumbrance legal.pdf26 Sep 2022
Copy of Layout Approval (in case of layout)File: AMENDED IOA PLAN_3-end_1-3.pdf26 Sep 2022
Copy of Layout Approval (in case of layout)File: AMENDED IOA PLAN_3-end_4-end.pdf26 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf26 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3.pdf26 Sep 2022
Copy of the legal title reportFile: Title report.pdf21 Sep 2022
Declaration in FORM BFile: FROM B.pdf21 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-08-2022 FORM 1 ARCHITECT CERTIFICATE.pdf21 Sep 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER NAVRANG NAVKAR.pdf21 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: PROJECT BANK DETAIL NAVRANG NAVKAR.pdf21 Sep 2022
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT ALLOTMENT LETTER.pdf21 Sep 2022
Building plan approvalFile: IOA.pdf14 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf14 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf14 Sep 2022
Declaration about Commencement CertificateFile: 13-09-2022 C C DECLARATION.pdf14 Sep 2022
PAN CardFile: Company pan card.pdf10 Sep 2022

How this compares with Mumbai Suburban

95%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAVRANG NAVKAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOREGAON WEST6,700+ in Mumbai Suburban

Builder: OXFORD NAVRANG REALTY LLP

OXFORD NAVRANG REALTY LLP has 1 registration on MahaRERA, including NAVRANG NAVKAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that NAVRANG NAVKAR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NAVRANG NAVKAR is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAVRANG NAVKAR?

The registered promoter entity is OXFORD NAVRANG REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAVRANG NAVKAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NAVRANG NAVKAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAVRANG NAVKAR?

The professionals named in the filing: Architect: SPACE MOULDERS CHANDAN; Engineer: OM GURUDATTA CONSTRCTOR; Engineer: jacob dosuza; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAVRANG NAVKAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAVRANG NAVKAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAVRANG NAVKAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.