Navrang Crystal
RG-MH-53619 · RERA P51800048561 · Last updated on MahaRERA portal: 3 Apr 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 6 months
- 1 extension taken
- Rs 20.00 crore secured on the land, in favour of CAPRI GLOBAL CAPITAL LIMITED
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Navrang Crystal is a Residential / Group Housing project by OXFORD PLANET REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048561 on 6 Jan 2023. The registration is recorded completed; possession was promised by 30 May 2026. The completion date has moved by 6 months from the original filing. 183 of the 189 units on this registration are recorded sold or booked, and 24 of 33 construction stages are filed complete.
At a glance
Project
- NameNavrang Crystal
- TypeResidential / Group Housing
- Location
- Siddharth Nagar
- Goregaon West
- Pahadi-Goregaon
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- RERA no.P51800048561
- ReraGenie IDRG-MH-53619
Builder
- NameOXFORD PLANET REALTY LLP
- Entity typePartnership
- PartnersPARBAT PATEL, Samir Sethia
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on6 Jan 2023
- Promised completion30 May 2026
- Revised completionRevised to 30 May 2026 (originally 30 Nov 2025)
- Buildings3 building records
- Documents filed78 files
Current status
Figures as on 3 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A wing | NA | 24 | 22 | 57 | 0 | 57 |
| B Wing | NA | 24 | 22 | 49 | 0 | 49 |
| C Wing | NA | 24 | 22 | 83 | 0 | 83 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 3 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 98%.
A wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
B Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
C Wing82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 3 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 98% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed174
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A wing | 61 | 61 |
| B Wing | 48 | 48 |
| C Wing | 65 | 65 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| New Siddharth Nagar Pancham Co op Housing Soc LTD | Goregaon | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A wing | NA | Rs 53.74 cr | Rs 57.06 cr |
| B Wing | NA | Rs 53.74 cr | Rs 57.06 cr |
| C Wing | NA | Rs 53.74 cr | Rs 57.06 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Space Moulders |
| Engineer | Om Gurudatta contractor |
| Engineer | JACOB BASTYAW DSOUZA |
| Engineer | CLIENT DOS SANTOS CLIENT DOS SANTOS |
| Chartered Accountant | NEHALI & CO |
| Chartered Accountant | NEHALI DHAVAL DOSHI |
| Chartered Accountant | SSKA & Company |
| Partner | Role in project |
|---|---|
| OXFORD PLANET REALTY LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe, the Promoter/Developer of the project Navrang Crystal, bearing Registration No. P51800048561, hereby declare that the construction work of the said project has been completed in all respects. The possession of the respective units has already been handed over to the allottees/owners. However, the Occupancy Certificate (OC) is presently under process with the competent authority. We request a period of six (6) months extension solely for the purpose of completing the OC formalities and obtaining the certificate.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 31 OF 2016/2016 | HIGH COURT MUMBAI | PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jul 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jul 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Full OC Bldg No 1 to 5 Pancham CHSL Siddharth Ngr Goregaon (W) MAHARERA.pdf | 3 Apr 2026 |
| Occupational CertificateFile: Pancham OC issued 12 02 2026.pdf | 16 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 OXFORD PLANET REALTY LLP.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: form3.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: form1 navrang crystal.pdf | 3 Dec 2025 |
| Withdrawal Update Form 2File: navrang crystal form 2.pdf | 3 Dec 2025 |
| Withdrawal Update Form 3File: form 3 navrang crystal.pdf | 3 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 OXFORD PLANET REALTY LLP.pdf | 12 Nov 2025 |
| Withdrawal Update Form 1File: form1 navrang crystal.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: navrang crystal form 2.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: form 3 navrang crystal.pdf | 13 Oct 2025 |
| Form 2A (FY 2024-2025)File: Navrang Crystal Form 2 A.pdf | 30 Sep 2025 |
| Building plan approvalFile: 08-02-2023 AMENDED IOA.pdf | 21 Jul 2025 |
| Layout approvalFile: 08-02-2023 AMENDED IOA WITH PLAN PANCHAM CHS 70 DPI_3-3.pdf | 21 Jul 2025 |
| Commencement certificateFile: FULL CC NAVRANG CRYSTAL.pdf | 21 Jul 2025 |
| Building plan approvalFile: 08-02-2023 AMENDED IOA WITH PLAN PANCHAM CHS 70 DPI_4-end (1)_3-end.pdf | 21 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 oxford planet (1).pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (1).pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Oxford Planet LLP Form - 1 (Architect Certificate)s (3).PDF | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024 Architect Form - 1 Oxford Planet Realty (1).PDF | 29 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: OXFORD PLANET DEC 24 CA FORM.pdf | 29 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 NAVRANG CRYSTAL DEC 24.pdf | 29 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Navrang Crystal Form 2 (July to September -23) D.pdf | 8 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 jan to march 24.pdf | 8 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Navrang Crystal Form 2 (June 24) D.pdf | 8 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Navrang Crystal Form 2 (July to September -24) D.pdf | 8 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Navrang Crystal Form 2A (22-23) D.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CRYSTAL JULY 23 TO SEPT 23.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CRYSTAL oct 23 to dec 23.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CRYSTAL APRIL 24 TO JUNE 24.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect july 24 to sep 24.PDF | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA JULY 23 TO SEPT 23.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA-APRIL 24 TO JUNE 24.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA -JULY 24 TO SEPT 24.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CA 23-24 CRYSTAL.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF | 18 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CRYSTAL MARCH 24.PDF | 18 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A CRYSTAL MARCH 24.PDF | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 23 Q4.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PANCHAM CHS.pdf | 21 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2023 FORM 1 ARCHITECT PANCHAM.PDF | 21 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 JAN 23 TO MARCH 23 CRYSTAL.PDF | 21 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 AP 23 TO JUNE 23 CRYSTAL.PDF | 21 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JAN TO MAR.pdf | 19 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - APR TO JUNE.pdf | 19 Aug 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200255850098_For_Asset_Based_Search_26_12_2022_15_42_18_488.pdf | 26 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC REVISED.pdf | 14 Dec 2022 |
| Declaration about Commencement CertificateFile: CC DECLARATION REVISED.pdf | 14 Dec 2022 |
| Copy of the legal title reportFile: Title report final.pdf | 12 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: 12-12-2022 encumbrance legal pancham chs.pdf | 12 Dec 2022 |
| Details of encumbrances concerned to LegalFile: 12-12-2022 encumbrance legal pancham chs.pdf | 12 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE S.pdf | 10 Dec 2022 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL NAVRANG CRYSTAL.pdf | 10 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: EMCUMBRANCE FINANCIAL.pdf | 8 Dec 2022 |
| Details of encumbrances concerned to LegalFile: EMCUMBRANCE FINANCIAL.pdf | 8 Dec 2022 |
| Proforma of Agreement for saleFile: final Panchama CHS Ltd - Oxford Model RERA Agreement for Sale.pdf | 8 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: deviation report allotment.pdf | 8 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: deviation report agreement for sale.pdf | 8 Dec 2022 |
| Layout approvalFile: PANCHAM CHS IOA PLAN_00001.pdf | 1 Dec 2022 |
| Layout approvalFile: PANCHAM CHS IOA PLAN_00002.pdf | 1 Dec 2022 |
| Layout approvalFile: PANCHAM CHS IOA PLAN_00003.pdf | 1 Dec 2022 |
| Layout approvalFile: PANCHAM CHS IOA PLAN_00004.pdf | 1 Dec 2022 |
| Layout approvalFile: PANCHAM CHS IOA PLAN_00005.pdf | 1 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00001.pdf | 1 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00002.pdf | 1 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00003.pdf | 1 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00004.pdf | 1 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00005.pdf | 1 Dec 2022 |
| Building plan approvalFile: PANCHAM CHS IOA oxford planect cc.pdf | 29 Nov 2022 |
| PAN CardFile: OXFORD PLANET LLP PAN CARD.pdf | 29 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PANCHAM CHS IOA oxford planect cc.pdf | 29 Nov 2022 |
| Declaration in FORM BFile: FORM B.pdf | 29 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE RERA.pdf | 29 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CERTIFICATE.pdf | 29 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DEATAIL LETTER NAVRANG CRYSTAL.pdf | 29 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 78 filed documents as one ZIP, foldered, with a manifest
Keep Navrang Crystal on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Goregaon West6,700+ in Mumbai Suburban
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: OXFORD PLANET REALTY LLP
OXFORD PLANET REALTY LLP has 1 registration on MahaRERA, including Navrang Crystal. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Navrang Crystal is delayed beyond 30 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Navrang Crystal?
The registered promoter entity is OXFORD PLANET REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Navrang Crystal?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Navrang Crystal?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Navrang Crystal?
The professionals named in the filing: Architect: Space Moulders; Engineer: Om Gurudatta contractor; Engineer: JACOB BASTYAW DSOUZA; Engineer: CLIENT DOS SANTOS CLIENT DOS SANTOS; Chartered Accountant: NEHALI & CO; Chartered Accountant: NEHALI DHAVAL DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Navrang Crystal?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback