ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Navrang Crystal

Completed No litigation declared Residential / Group Housing project

Navrang Crystal

By OXFORD PLANET REALTY LLP

RG-MH-53619 · RERA P51800048561 · Last updated on MahaRERA portal: 3 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken
  • Rs 20.00 crore secured on the land, in favour of CAPRI GLOBAL CAPITAL LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2026Possession promisedregistration recorded completed
24 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 98%
6 of 189Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Navrang Crystal is a Residential / Group Housing project by OXFORD PLANET REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048561 on 6 Jan 2023. The registration is recorded completed; possession was promised by 30 May 2026. The completion date has moved by 6 months from the original filing. 183 of the 189 units on this registration are recorded sold or booked, and 24 of 33 construction stages are filed complete.

At a glance

Project

  • NameNavrang Crystal
  • TypeResidential / Group Housing
  • Location
    • Siddharth Nagar
    • Goregaon West
    • Pahadi-Goregaon
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • RERA no.P51800048561
  • ReraGenie IDRG-MH-53619

Builder

  • NameOXFORD PLANET REALTY LLP
  • Entity typePartnership
  • PartnersPARBAT PATEL, Samir Sethia

Key dates

this monthRegisteredJan 2023First promiseNov 2025Revised toMay 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Jan 2023
  • Promised completion30 May 2026
  • Revised completionRevised to 30 May 2026 (originally 30 Nov 2025)
  • Buildings3 building records
  • Documents filed78 files

Current status

97%183 of 189 units booked
106.2%Work done, per cost certificate

Figures as on 3 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA242257057
B WingNA242249049
C WingNA242283083

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 3 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 98%.

A wing82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
B Wing82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
C Wing82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 3 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes98%
Landscaping & Tree PlantingYes90%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed174

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots174
Closed/Covered174
BuildingClosed/CoveredTotal
A wing6161
B Wing4848
C Wing6565

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,584 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofCAPRI GLOBAL CAPITAL LIMITED
Secured amountRs 20.00 crore
Declared on4 Jul 2025
LandownerVillageDistrict
New Siddharth Nagar Pancham Co op Housing Soc LTDGoregaonMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI12507.14
Proposed, not sanctioned11,182 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHARKOP, KANDIVALI WEST
Estimated costRs 161.22 cr
Cost incurredRs 171.17 cr
Work done106.17%
BuildingWingEstimatedIncurred
A wingNARs 53.74 crRs 57.06 cr
B WingNARs 53.74 crRs 57.06 cr
C WingNARs 53.74 crRs 57.06 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Moulders
EngineerOm Gurudatta contractor
EngineerJACOB BASTYAW DSOUZA
EngineerCLIENT DOS SANTOS CLIENT DOS SANTOS
Chartered AccountantNEHALI & CO
Chartered AccountantNEHALI DHAVAL DOSHI
Chartered AccountantSSKA & Company
PartnerRole in project
OXFORD PLANET REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12112518309Nov 2025 → May 2026

Reason as filed by the promoterWe, the Promoter/Developer of the project Navrang Crystal, bearing Registration No. P51800048561, hereby declare that the construction work of the said project has been completed in all respects. The possession of the respective units has already been handed over to the allottees/owners. However, the Occupancy Certificate (OC) is presently under process with the competent authority. We request a period of six (6) months extension solely for the purpose of completing the OC formalities and obtaining the certificate.

Litigation declared1

CaseCourtStatus
31 OF 2016/2016HIGH COURT MUMBAIPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Full OC Bldg No 1 to 5 Pancham CHSL Siddharth Ngr Goregaon (W) MAHARERA.pdf3 Apr 2026
Occupational CertificateFile: Pancham OC issued 12 02 2026.pdf16 Mar 2026
Withdrawal Update Form 1File: FORM 1 OXFORD PLANET REALTY LLP.pdf17 Jan 2026
Withdrawal Update Form 2File: form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: form3.pdf17 Jan 2026
Withdrawal Update Form 1File: form1 navrang crystal.pdf3 Dec 2025
Withdrawal Update Form 2File: navrang crystal form 2.pdf3 Dec 2025
Withdrawal Update Form 3File: form 3 navrang crystal.pdf3 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5 OXFORD PLANET REALTY LLP.pdf12 Nov 2025
Withdrawal Update Form 1File: form1 navrang crystal.pdf13 Oct 2025
Withdrawal Update Form 2File: navrang crystal form 2.pdf13 Oct 2025
Withdrawal Update Form 3File: form 3 navrang crystal.pdf13 Oct 2025
Form 2A (FY 2024-2025)File: Navrang Crystal Form 2 A.pdf30 Sep 2025
Building plan approvalFile: 08-02-2023 AMENDED IOA.pdf21 Jul 2025
Layout approvalFile: 08-02-2023 AMENDED IOA WITH PLAN PANCHAM CHS 70 DPI_3-3.pdf21 Jul 2025
Commencement certificateFile: FULL CC NAVRANG CRYSTAL.pdf21 Jul 2025
Building plan approvalFile: 08-02-2023 AMENDED IOA WITH PLAN PANCHAM CHS 70 DPI_4-end (1)_3-end.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 oxford planet (1).pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (1).pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Oxford Planet LLP Form - 1 (Architect Certificate)s (3).PDF14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024 Architect Form - 1 Oxford Planet Realty (1).PDF29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: OXFORD PLANET DEC 24 CA FORM.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 NAVRANG CRYSTAL DEC 24.pdf29 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Navrang Crystal Form 2 (July to September -23) D.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 jan to march 24.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Navrang Crystal Form 2 (June 24) D.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Navrang Crystal Form 2 (July to September -24) D.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Navrang Crystal Form 2A (22-23) D.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CRYSTAL JULY 23 TO SEPT 23.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CRYSTAL oct 23 to dec 23.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CRYSTAL APRIL 24 TO JUNE 24.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect july 24 to sep 24.PDF30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA JULY 23 TO SEPT 23.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA-APRIL 24 TO JUNE 24.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA -JULY 24 TO SEPT 24.pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CA 23-24 CRYSTAL.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CRYSTAL MARCH 24.PDF18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A CRYSTAL MARCH 24.PDF18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 23 Q4.pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PANCHAM CHS.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2023 FORM 1 ARCHITECT PANCHAM.PDF21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 JAN 23 TO MARCH 23 CRYSTAL.PDF21 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 AP 23 TO JUNE 23 CRYSTAL.PDF21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JAN TO MAR.pdf19 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - APR TO JUNE.pdf19 Aug 2023
CERSAI detailsFile: CERSAI_Search_Report_200255850098_For_Asset_Based_Search_26_12_2022_15_42_18_488.pdf26 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CC REVISED.pdf14 Dec 2022
Declaration about Commencement CertificateFile: CC DECLARATION REVISED.pdf14 Dec 2022
Copy of the legal title reportFile: Title report final.pdf12 Dec 2022
Details of encumbrances concerned to FinanceFile: 12-12-2022 encumbrance legal pancham chs.pdf12 Dec 2022
Details of encumbrances concerned to LegalFile: 12-12-2022 encumbrance legal pancham chs.pdf12 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE S.pdf10 Dec 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL NAVRANG CRYSTAL.pdf10 Dec 2022
Details of encumbrances concerned to FinanceFile: EMCUMBRANCE FINANCIAL.pdf8 Dec 2022
Details of encumbrances concerned to LegalFile: EMCUMBRANCE FINANCIAL.pdf8 Dec 2022
Proforma of Agreement for saleFile: final Panchama CHS Ltd - Oxford Model RERA Agreement for Sale.pdf8 Dec 2022
Deviation Report with respect to Allotment letterFile: deviation report allotment.pdf8 Dec 2022
Deviation Report with respect to model copy of AgreementFile: deviation report agreement for sale.pdf8 Dec 2022
Layout approvalFile: PANCHAM CHS IOA PLAN_00001.pdf1 Dec 2022
Layout approvalFile: PANCHAM CHS IOA PLAN_00002.pdf1 Dec 2022
Layout approvalFile: PANCHAM CHS IOA PLAN_00003.pdf1 Dec 2022
Layout approvalFile: PANCHAM CHS IOA PLAN_00004.pdf1 Dec 2022
Layout approvalFile: PANCHAM CHS IOA PLAN_00005.pdf1 Dec 2022
Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00001.pdf1 Dec 2022
Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00002.pdf1 Dec 2022
Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00003.pdf1 Dec 2022
Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00004.pdf1 Dec 2022
Copy of Layout Approval (in case of layout)File: PANCHAM CHS IOA PLAN_00005.pdf1 Dec 2022
Building plan approvalFile: PANCHAM CHS IOA oxford planect cc.pdf29 Nov 2022
PAN CardFile: OXFORD PLANET LLP PAN CARD.pdf29 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PANCHAM CHS IOA oxford planect cc.pdf29 Nov 2022
Declaration in FORM BFile: FORM B.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE RERA.pdf29 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CERTIFICATE.pdf29 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DEATAIL LETTER NAVRANG CRYSTAL.pdf29 Nov 2022

How this compares with Mumbai Suburban

97%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Navrang Crystal on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon West6,700+ in Mumbai Suburban

Builder: OXFORD PLANET REALTY LLP

OXFORD PLANET REALTY LLP has 1 registration on MahaRERA, including Navrang Crystal. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Navrang Crystal is delayed beyond 30 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Navrang Crystal?

The registered promoter entity is OXFORD PLANET REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Navrang Crystal?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Navrang Crystal?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Navrang Crystal?

The professionals named in the filing: Architect: Space Moulders; Engineer: Om Gurudatta contractor; Engineer: JACOB BASTYAW DSOUZA; Engineer: CLIENT DOS SANTOS CLIENT DOS SANTOS; Chartered Accountant: NEHALI & CO; Chartered Accountant: NEHALI DHAVAL DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Navrang Crystal?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Navrang Crystal. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Navrang Crystal to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.