NAVKALA BHARATI

By LAKSHMICONSTRUCTION

RG-MH-59499 · RERA P51800010922 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 13 months past the filed date
  • Litigation declared, 1 case
  • Completion date moved by 71 months
  • 7 extensions taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2025Possession promised13 months past this date
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 242 documents Report an error

NAVKALA BHARATI is a Others project by LAKSHMICONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010922 on 31 Aug 2017. Possession was promised by 30 Sep 2025 and is now 13 months past that date. The completion date has moved by 71 months from the original filing.

At a glance

Project

  • NameNAVKALA BHARATI
  • TypeOthers
  • Location
    • Road No.3
    • Andheri
    • Mumbai Suburban
    • 400055
  • Pincode400055
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010922
  • ReraGenie IDRG-MH-59499

Builder

  • NameLAKSHMICONSTRUCTION
  • Entity typePartnership
  • GSTIN27AACFL3042M1ZA
  • PartnersDEEPAK INDULAL SHAH, HARSHA BIPIN SAVLA
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

13 months past promisethis monthRegisteredAug 2017First promiseOct 2019Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 31 Oct 2019)
  • Buildings1 building record
  • Documents filed242 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NAVKALA BHARATINA109000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

NAVKALA BHARATI: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
FITNESS CENTREYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area542 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Oct 2024

Approvals and building plan

Sanctioning authoritySOCIETY PLOT
Permissible FSI1755.11
Proposed, not sanctioned1,035 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOLIBAR ROAD SANTACRUZ EAST MUMBAI 400055

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectD P ASSOCIATES MR PRIYANK BHATT
EngineerK C SHAH
EngineerJAYANTILAL L DONGA
EngineerMAHENDRA MANE
Chartered AccountantJoseph Mendonsa And Co
Chartered AccountantKRISHNA NAYAK & CO.
PartnerRole in project
LAKSHMICONSTRUCTION-

Extensions applied for7

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010840Oct 2019 → Apr 2022

Reason as filed by the promoterINVOKING FORCE MAJESURE FOR COVID.lg PANDEMIC SECOND WAVE FOR PERIOD OF EXTENSION OF PROJECT BY 6 MONTHS.

EXT51800009450Oct 2019 → Oct 2021

Reason as filed by the promoterPLEASE GRANT US THE EXTENSION FOR PROJECT COMPLETION DUE TO COVID-19 SITUATION.

EXT51800011793Oct 2019 → Dec 2022

Reason as filed by the promoterINVOKING FORCE MAJESURE FOR COVID-19 PANDEMIC WAVE FOR PERIOD OF FURTHER EXTENSION OF PROJECT

EXT51800002577Oct 2019 → Oct 2020

Reason as filed by the promoterdue to further cc and society resolution concern letter .

EXT51800018480Oct 2019 → Sep 2024

Reason as filed by the promoterCAR PARKING SYSTEM WORK AND BALANCE FIRE FIGHTING INSTALLATION WORK IS UNDER PROCESS

EXT51800016528Oct 2019 → Dec 2023

Reason as filed by the promoterDUE TO COVID-19 EFFECT

EXT51800018932Oct 2019 → Sep 2025

Reason as filed by the promoterCAR PARKING SYSTEM WORK IS IN PROGRESS

Litigation declared1

CaseCourtStatus
DISPUTE No CC/II/139 of 2013/2013CO OPERATIVE COURTSUIT PENDING OCCUPANT VACATED ON CONSENT TERMS

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jun 2024

Documents filed242

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 242 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2017-2018)File: FORM 5 17-18.pdf27 Jun 2026
Form 5 (FY 2020-2021)File: FORM 5 20-21.pdf27 Jun 2026
Form 5 (FY 2024-2025)File: 24-25 Form-5 Navkala.pdf15 Jun 2026
Form 5 (FY 2023-2024)File: FORM 5 23-24.pdf15 Jun 2026
Form 5 (FY 2022-2023)File: FORM 5 22-23.pdf15 Jun 2026
Form 5 (FY 2021-2022)File: FORM 5 21-22.pdf15 Jun 2026
Form 2A (FY 2017-2018)File: FORM 2A FY 2017-18.pdf13 Jun 2026
Form 2A (FY 2018-2019)File: FORM 2A FY 2018-19.pdf13 Jun 2026
Form 2A (FY 2019-2020)File: FORM 2A FY 2019-20.pdf13 Jun 2026
Form 2A (FY 2020-2021)File: FORM 2A FY 2020-21.pdf13 Jun 2026
Form 2A (FY 2021-2022)File: FORM 2A 2022.pdf13 Jun 2026
Form 2A (FY 2022-2023)File: FORM 2A 2023.pdf13 Jun 2026
Form 2A (FY 2023-2024)File: FORM 2A 2024.pdf13 Jun 2026
Form 5 (FY 2018-2019)File: FORM 5 18-19.pdf6 Jun 2026
Form 5 (FY 2019-2020)File: FORM 5 19-20.pdf6 Jun 2026
Form 5 (FY 2025-2026)File: 25-26 Form-5 Navkala.pdf3 Jun 2026
Disclosure of Sold and Booked InventoryFile: Q3 FY 24-25 Apt Booked-Sold.pdf30 Mar 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE Q3 2425.pdf30 Mar 2026
Form 2File: Q3 FY 24-25 Form-2 Engineers Certificate.pdf30 Mar 2026
Form 3File: FORM-3 of Q3 FY 24-25.pdf30 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q4 FY 24-25 Apt Booked-Sold.pdf30 Mar 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE Q4 2425.pdf30 Mar 2026
Form 2File: Q4 FY 24-25 Form-2 Engineers Certificate.pdf30 Mar 2026
Form 3File: FORM-3 of Q4 FY 24-25.pdf30 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q1 FY 23-24 APT Booked-Sold.pdf30 Mar 2026
Form 1File: Form-1 Q1 FY 23-24 Architect Certificate.pdf30 Mar 2026
Form 2File: Q1 FY 23-24 Form -2 Certificates of Engineer.pdf30 Mar 2026
Form 3File: FORM-3 Q1 FY 23-24 CA Certificate.pdf30 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q2 FY 23-24 APT Booked-Sold.pdf30 Mar 2026
Form 1File: Form-1 Q2 FY 23-24 Architect Certificate.pdf30 Mar 2026
Form 2File: Q2 FY 23-24 Form -2 Certificates of Engineer.pdf30 Mar 2026
Form 3File: FORM-3 Q2 FY 23-24 CA Certificate.pdf30 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q3 FY 23-24 APT Booked-Sold.pdf30 Mar 2026
Form 1File: Form-1 Q3 FY 23-24 Architect Certificate.pdf30 Mar 2026
Form 2File: Q3 FY 23-24 Form -2 Certificates of Engineer.pdf30 Mar 2026
Form 3File: FORM-3 Q3 FY 23-24 CA Certificate.pdf30 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q4 FY 23-24 APT Booked-Sold.pdf30 Mar 2026
Form 1File: Form-1 Q4 FY 23-24 Architect Certificate.pdf30 Mar 2026
Form 2File: Q4 FY 23-24 Form -2 Certificates of Engineer.pdf30 Mar 2026
Form 3File: FORM-3 Q4 FY 23-24 CA Certificate.pdf30 Mar 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE Q1 2425.pdf25 Mar 2026
Form 2File: Q1 FY 24-25 Form -2 Certificates of Engineer.pdf25 Mar 2026
Form 3File: fORM-3 of Q1 FY 24-25.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q1 FY 24-25 Apt Booked Sold.pdf25 Mar 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE Q2 2425.pdf25 Mar 2026
Form 2File: Q2 FY 24-25 Form -2 Certificates of Engineer.pdf25 Mar 2026
Form 3File: fORM-3 of Q2 FY 24-25.pdf25 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q2 FY 24-25 Apt Booked-Sold.pdf25 Mar 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE Q1 2526.pdf21 Mar 2026
Form 2File: Q1 FY 25-26 Form-2 Engineers Certificate.pdf21 Mar 2026
Form 3File: FORM-3 Q1 FY 2025-26.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q1 FY 25-26 Apt Booked-Sold.pdf21 Mar 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE Q2 2526.pdf21 Mar 2026
Form 2File: Q2 FY 25-26 Form-2 Engineers Certificate.pdf21 Mar 2026
Form 3File: Form-3 Q2 FY 2025-26.pdf21 Mar 2026
Disclosure of Sold and Booked InventoryFile: Q2 FY 25-26 Apt Booked-Sold.pdf21 Mar 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE Q1 24-25 DS.pdf21 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT AREA CERTIFICATE Q4 FY 23-24.pdf21 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE Q1 24-25 DS.pdf21 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT AREA CERTIFICATE Q4 FY 23-24.pdf21 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE Q2 24-25 DS.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE Q2 24-25 DS.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE Q2 24-25 DS.pdf19 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE Q2 24-25 DS.pdf19 Nov 2024
Certificates of CA (Form 3)File: FORM 3 Q4 FY 23-24_compressed.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: BOOKED SOLD INVENTORY.pdf12 Nov 2024
CERSAI detailsFile: CERSAI Search Report.pdf11 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE Q1 24-25 DS_compressed.pdf23 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE Q2 24-25 DS_compressed.pdf23 Oct 2024
Certificates of CA (Form 3)File: FORM 3 Q1 FY 2425_compressed.pdf23 Oct 2024
Certificates of CA (Form 3)File: FORM 3 Q2 FY 2425_compressed.pdf23 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Q1 FY 24-25_compressed.pdf23 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Q2 FY 24-25_compressed.pdf23 Oct 2024
Declaration in FORM BFile: FORM B DECLARATION.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Apt.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF BOOKED-SOLD NAVKALA BHARATI.pdf1 Jul 2024
Certificates of CA (Form 3)File: FORM 3 Q4 FY 23-24 NAVKALA BHARATI_compressed.pdf1 Jul 2024
Certificates of CA (Form 3)File: FORM 3 Q4 FY 23-24 NAVKALA BHARATI.pdf20 Jun 2024
Declaration in FORM BFile: FOMR-B.pdf7 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC REVALIDATION MERGED DOCUMNETS 0411.pdf6 Jun 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 71 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAVKALA BHARATI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmNAVKALA BHARATICompleted 130Lapsed / revoked 73Other 138Dot size: filed unitsN

Filed coordinates, straight-line distance. 341 registered projects within 2 km.

Builder: LAKSHMICONSTRUCTION

LAKSHMICONSTRUCTION has 2 registrations on MahaRERA, including NAVKALA BHARATI and PRABHAT KUNJ. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that NAVKALA BHARATI shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NAVKALA BHARATI is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAVKALA BHARATI?

The registered promoter entity is LAKSHMICONSTRUCTION, a partnership as per the filing. Its GSTIN 27AACFL3042M1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAVKALA BHARATI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NAVKALA BHARATI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAVKALA BHARATI?

The professionals named in the filing: Architect: D P ASSOCIATES MR PRIYANK BHATT; Engineer: K C SHAH; Engineer: JAYANTILAL L DONGA; Engineer: MAHENDRA MANE; Chartered Accountant: Joseph Mendonsa And Co; Chartered Accountant: KRISHNA NAYAK & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAVKALA BHARATI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAVKALA BHARATI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAVKALA BHARATI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.